My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6126 Gall Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
6126 Gall Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 7:25:13 PM
Creation date
2/19/2025 8:19:12 AM
Metadata
Fields
Template:
Building Plans
Street #
6126
Location
Gall Blvd
Contractor
Par Builders
Building Plans - Permit #
15818
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
co <br />FRAMING PLAN <br />SCALE: 1 /8" = 1'4O" <br />8fi'—r <br />TRUE <br />NORTH <br />a <br />0 <br />I <br />N <br />B <br />4 <br />I <br />0 <br />to <br />LINTEL REINFORCEMENT, SEE LINTEL REINFORCEMENT, SEE <br />MASONRY LINTEL SHCHEDULE MASONRY LINTEL SHCHEDULE <br />I I I I I <br />t--1----- -- <br />I I I I I <br />L i <br />'I <br />I I I II <br />co <br />I OPENING I I I I <br />I I I I I <br />I I I I I OPENING <br />I I <br />----J--------L---- I OPENING \ <br />I I I I I <br />SEE STRUCTURAL <br />NOTES SHEET S1 FOR <br />JAMB REINFORCEMENT I I I I <br />I I I I <br />HORIZONTAL REINFORCEMENT AT —J v-- SEE STRUCTURAL <br />SILL OF OPENINGS TO MATCH NOTES SHEET S1 FOR <br />LINTEL REINFORCEMENT ABOVE JAMB REINFORCEMENT <br />1 MASONRY WALL OPENINGS <br />S5 SCALE: NONE <br />REINFORCING IN GROUTED <br />CELL EACH SIDE OF <br />CONTROL JOINT <br />II II I II I II II <br />"•a I� Io- I <br />—1 7 <br />CONTROL JOINT SEE DETAIL 2 & 3/S5. <br />NTH ARCHITECTURAL FOR CONTROL JOINT <br />S OF MECHANICAL OPENINGS IN MASONRY <br />TO MECHANICAL DRAWINGS. SEE MASONRY <br />ILE FOR BOND BEAM REQUIREMENTS. <br />ATER THAN 60" WIDE REQUIRE <br />f0 THE PROJECT ENGINEER FOR SPECIAL <br />,HANICAL OPENINGS SHALL NOT BE <br />ANY EXTERIOR DOORS. TOP OF OPENING <br />D A MINIMUM 12' BELOW CONTINUOUS <br />.S AND 18' BELOW WIND BEAM CENTERLINE <br />MASONRY LINTEL SCHEDULE <br />0'-0' TO 5'-0' MASONRY OPENING: 8" <br />DEEP LINTEL BLOCK WITH (2) #5's <br />CONTINUOUS AS SHOWN. LINTEL BLOCK TO <br />EXTEND 32' BEYOND OPENINGS, SEE WALL <br />ELEVATION 1/S5 & 2/S5 <br />5'-1" TO 8'-0' MASONRY OPENING: 16" <br />DEEP LINTEL BLOCK WITH (4) #5's <br />CONTINUOUS AS SHOWN. LINTEL BLOCK TO <br />EXTEND 32' BEYOND OPENINGS, SEE WALL <br />ELEVATION 1/S5 & 2/S5 <br />TYPICAL MASONRY MASONRY CONTROL <br />2 LINTEL DETAIL 3 JOINT DETAIL <br />SS SCALE: NONE S5 SCALE: NONE <br />BENT DOWELS AT ALL BOND <br />BEAM LOCATIONS (TYPICAL <br />EACH BUILDING CORNER) — <br />0 <br />I <br />VERTICAL WALL <br />REINFORCEMENT, SEE <br />STRUCTURAL NOTES <br />CONTINUOUS REINFORCEMENT <br />CONTINUOUS <br />BOND BEAM <br />WHERE <br />INDICATED <br />REBAR <br />POSITIONERS SEE <br />STRUCTURAL NOTES <br />3'-0' <br />REINFORCEMENT <br />VERTICAL WALL <br />REINFORCEMENT, SEE <br />STRUCTURAL NOTES <br />30' LAP LENGTH <br />PLAN VIEW OF TYPICAL <br />4) MASONRY BOND BEAM <br />SS I SCALE: 31W = V-0" <br />HOOKED BAR AS SHOWN AT <br />ALL BOND BEAM LOCATIONS <br />END OF WALL OR <br />JAMB OF OPENING <br />t--,Iti v Y r rrrrtrl/ ,,,, <br />� J <br />Z <br />0 <br />ATE OF 4: rn <br />�w <br />LL <br />0 <br />NA L <br />fif apB 1 Ci fi �b0 10 0 <br />U) <br />w <br />SHEETS BEARING THIS SEAL ARE 0 <br />AUTHENTICATED, RESPONSIBILITY FOR W <br />ALL OTHER PLANS, SPECIFICATIONS = <br />OR INSTRUMENTS ARE DISCLAIMED. F- <br />w <br />0 <br />VU z <br />z <br />w <br />N <br />z <br />0 <br />U <br />"V <br />O <br />00 3 <br />o U) W °w <br />Z N <br />Zy0 <br />yQ03t a <br />a W <br />y <br />0 —J w <br />It <br />o< <br />_ Ix G 0 <br />I—=WN <br />O00a0 0 w <br />yn i <br />M a. <br />V N y 0 d <br />z <br />0 <br />U <br />D <br />0 <br />W <br />m <br />a <br />w <br />O <br />Q <br />y z <br />0 <br />m <br />m <br />w <br />rc <br />a <br />z <br />a o� <br />Q— W <br />O oC ° <br />�-�O W <br />o <br />�- 0 <br />J m J ILI <br />a <br />J J J a <br />�J = W <br />Qs = <br />000>0 <br />�o <br />s <br />cy a r W Q <br />a Z t0 N w <br />Uz <br />W <br />o <br />rn <br />AL` I0 F <br />rW S.N O M W <br />i.. z <br />•yam NOS <br />w _y�� z <br />Swg <br />ai4l�;L w <br />C <br />,� = ; Q <br />o N <br />�'• N z <br />co) m o`4 _O <br />O ( 000 � <br />U Q <br />ow U <br />m LL <br />U)z _ <br />ram-+ v a i U <br />c o- W <br />LL U) <br />0 <br />z <br />� Q <br />A) <br />0 <br />Z <br />O <br />of <br />z <br />DRAWN BY: CHECKED BY: W <br />MW JS ° <br />I <br />09M <br />1 O/6/14 0 <br />N <br />REVISION: F <br />_ <br />0 <br />tr <br />PROJECT NUMBER: d <br />ZRH oU <br />SHEET NUMBER OU <br />
The URL can be used to link to this page
Your browser does not support the video tag.