Laserfiche WebLink
r <br />ABBREVIATIONS GENERAL NOTES VERSION CHANGES INDEX OF DRAWINGS <br />ABV - ABOVE MLDG - MOULDING THE FOLLOWING TECHNICAL CODES SHALL APPLY: VERSION DESCRIPTION OF CHANGES SHT NO: TITLE <br />AFF - ABOVE FINISH FLOOR MNT - MOUNT OR MOUNTING 1.0 PLAN REVISIONS CS COVER SHEET N <br />AHU - AIR HANDLER UNIT MO - MASONRY OPENING Al FOUNDATION PLAN <br />A/C - AIR CONDITIONING MUNT - MUNTINS 2020 FLORIDA BUILDING CODE RESIDENTIAL, PLUMBING, MECHANICAL, FUEL GAS, 2.0 TRUSS CONNECTOR REVISION �: r, co <br /># A2 FLOOR PLAN ,!,,'-- - - , Q <br />ALUM - ALUMINUM -NUMBER ENERGY EFFICIENCY, ACCESSIBILITY, AND NFPA 70 NATIONAL ELECTRICAL CODES 2017 - <br />3.0 FLORIDA BUILDING CODE 7TH EDITION 2020 UPDATE A3 ROOF FRAMING PLAN <br />AT -ALUMINUM THRESHOLD pM - ON CENTER ( ) ,, �• , ..�� <br />AB - ANCHOR BOLT OGD - OVERHEAD GARAGE DOOR 2020 FBC PLUMBING RESIDENTIAL SECTION 604 4.0 GAS FIXTURES ADDED A4 ROOF PLAN C,�� �`` o <br />AVG -AVERAGE OPNG - OPENING 1. TANK TYPE WATER CLOSET VOLUME A5 EXTERIOR ELEVATIONS C•- � i,. 00 <br />BFE - BASE FLOOD ELEVATION OPP - OPPOSITE 1.6 GALLONS 5.0 ADDED SHEETS WP2.0 AND WP2.1 TO THE SHEET INDEX A6 FLOOR ELECTRICAL PLAN `=L <br />BM -BEAM OPT - OPTIONAL SNO STRUCTURAL NOTES <br />BLK - BLOCK OH - OVER HANG SN1 STRUCTURAL NOTES Q <br />It <br />2. WATER - FLOW RATE. S3M FOUNDATION DETAILS z <br />BLDG -BUILDING OH CABS- OVERHEAD CABS � •� -5�(}5 `� <br />BRD -BOARD PNT - PAINT FINISH PUBLIC FACILITIES LAV 0.5 G.P.M.III <br />BRG - BEARING PTD - PAINTED PRIVATE FACILITIES LAV 2.2 G.P.M. S4 FRAME WALL DETAILS. , • ' <br />BTM -BOTTOM SHOWER HEADS 2.5 G.P.M. p <br />PED -PEDESTAL S5 ROOF FRAMING DETAILS <br />BUC - BUILT UP COLUMN PERF -PERFORATED <br />SS RETRO FIT DETAILS <br />CAB - CABINET S11 PRECAST DETAILS -� <br />PLT -PLATE 3. ALL PLUMBING WATER LINES w <br />CD S12 PRECAST DETAILS <br />-CONSTRUCTION DOCUMENTS PLYWD -PLYWOOD TO BE CPVC PA1.0 PRODUCT APPROVAL o: <br />CLG - CEILING PKT -POCKET <br />CLG HT - CEILING HEIGHT LB -POUND VTR LOCATIONS ARE APPROXIMATE AND MAY CHANGE DUE TO PA1.1 PRODUCT APPROVAL z <br />CEMT - CEMENTITIOUS PSF - POUNDS PER SQUARE FOOT JOBSITE CONDITIONS PA1.2 PRODUCT APPROVAL ¢ <br />CL - CENTERLINE PSI - POUNDS PER SQUARE PA1.3 PRODUCT APPROVAL <br />COL -COLUMN PT - PRESSURE TREATED THE FOLLOWING SHALL COMPLY WITH THE 2020 FBC RESIDENTIAL PA1.4 PRODUCT APPROVAL <br />CONC - CONCRETE PB - PUSH BUTTON CODE <br />PA1.5 PRODUCT APPROVAL <br />CMU -CONCRETE MASONRY UNIT REF -REFRIGERATOR SH 1.0 HURRICANE SHUTTERS <br />CONST - CONSTRUCT OR CONSTRUCTION RECP -RECEPTACLE Q PORCHES AND BALCONIES <br />CONT - CONTINUOUS OR CONTINUES REINF - REINFORCING CHAP. 3 SH 1.1 HURRICANE SHUTTERS to > o 0 <br />CTR -CENTER READ - REQUIRED <br />CJ - CONTROL JOINT R/A - RETURN AIR Q HANDRAILS - CHAP. 3 SH 1.2 HURRICANE SHUTTERS � p` M C ti <br />DP - DEEP OR DEPTH 4- O'+ o <br />SH 1.3 HURRICANE SHUTTERS } � � <br />RO - ROUGH OPENING <br />DTL - DETAIL IRS - ROUGH SAWN Q GUARDRAILS - CHAP. 3 SH 1.4 HURRICANE SHUTTERS to E M <br />DIA -DIAMETER SH 1.5 HURRICANE SHUTTERS j O u <br />SC - SOLID CORE 'S <br />DIM - DIMENSION SCP -SCUPPER WP1.0 WATERPROOFING DETAILS 0 �.;8 0 <br />STAIRS - CHAP. 3 WP2.0 WATERPROOFING DETAILS U <br />DISCON -DISCONNECT SCRN - SCREEN Q a <br />DW - DISHWASHER SIM -SIMILAR WP2.1 WATERPROOFING DETAILS N w p_" i_" <br />DR -DOOR SHLVS -SHELVES Q CHIMNEY & FIREPLACE L o M <br />m <br />00 <br />DBL - DOUBLE S/R - SHELF & ROD CHAP. 10 n °'v <br />DWG - DRAWING SH - SINGLE HUNG WINDOW <br />EA -EACH SGD - SLIDING GLASS DOOR Q EGRESS WINDOWS <br />ELEC - ELECTRICAL SPECS - SPECIFICATIONS CHAP. 3 <br />ELEV - ELEVATOR SQ FT - SQUARE FEET <br />EQ -EQUAL SQ IN - SQUARE INCH 5. ALL OPENINGS SHALL COMPLY WITH 2O20 FBC RESIDENTIAL WIND LOADS AS STATED <br />EQUP - EQUIPMENT STD -STANDARD BELOW. ATTACHMENTS OF WINDOWS, DOORS, SLIDING GLASS DOORS AND O.H. <br />EXP JT - EXPANSION JOINT STL -STEEL GARAGE DOORS ARE TO DELEGATED THE MANUFACTURER OF THESE ITEMS. THE <br />EXT - EXTERIOR STRUCT -STRUCTURAL MANUFACTURER OF THESE ITEMS SHALL SUBMIT ATTACHMENTS FOR SITE <br />FIN FLR - FINISHED FLOOR TEMP -TEMPERED INSTALLATION. <br />FIN - FIN THK - THICK OR THICKNESS <br />EW - EACH WAY TB - TOWEL BAR SEE ATTACHED SPECIFICATION SHEETS FOR MANUFACTURERS DESIGN CRITERIA • <br />FG - FIXED GLASS TOM - TOP OF CONCRETE AND INSTALLATION METHODS FOR WINDOWS, DOORS, SLIDING GLASS DOORS, <br />FD -FLOOR DRAIN TOM -TOP OF MASONRY <br />FE - FIRE EXTINGUISHER TOP - TOP OF PLATE OVERHEAD GARAGE DOORS, AND ROOFING. <br />FLR - FLOOR TP - TOILET PAPER HOLDER <br />FLOUR -FLUORESCENT TYP - TYPICAL 6. ALL DOORS INTERIOR & EXTERIOR ARE 6'-8" UNLESS OTHERWISE NOTED ALL <br />FTG - FOOTING LINO - UNLESS NOTED OTHERWISE SHOWER ENCLOSURES TO BE TEMPERED GLASS <br />FR DR - FRENCH DOOR VAC -VACUUM °w Fw w w w a o <br />GALV - GALVANIZED VAL -VALANCE 7. ALL WINDOWS WITHIN 24" OF DOORS (INTERIOR & EXTERIOR) AND WITHIN 18" OF FLR < LU < ° ¢ o u o o <br />GA -GAUGE VERT - VERTICAL U ¢ x Z 0: U- m ° - <br />TO BE TEMPERED GLASS. (SECTION R308) Q Q - ° N O z w � o z � ° ° � ¢ ¢ <br />GB - GRAB BAR VIF - VERIFY IN FIELD H� a § O O m O O m Z � <br />W W Z w-'W Z� <br />GFI / GFCI- GROUND FAULT CIRCUIT INTERRUPTOR VTR - VENT THROUGH ROOF DIMENSIONING: C'1 J ¢ a o z � o Z z LL a0 w O° ii <br />GWB -GYPSUM WALL BOARD LU <br />V -VOLT O Z ¢ O a o ~ � o ¢ § ¢ ° ¢ WC - WATER CLOSET O O w <br />GYPBRD - GYPSUM BOARD WH - WATER HEATER A. DIMENSIONS INDICATED ARE TO: <br />HD - HEAD WL - WIND LOAD A.1. CMU WALL: OUTSIDE FACE OF WALL <br />HVAC - HEATING, VENTILATING, AIR CONDITIONING WP - WEATHERPROOF A.2. INTERIOR FRAMED WALLS: PLAN WEST (OR PLAN NORTH) FROM FACE OF <br />HT - HEIGHT WWM - WELDED WIRE MESH CORE -STUD <br />HB - HOSE BIB W - WIDE OR WIDTH A.2.1. DIMENSIONS ARE NOT FROM ELEMENTS ATTACHED TO CORE STUD - I.E. J'� /) 0 <br />HC - HANDICAP WDW - WINDOW FURRING\ N <br />INSUL - INSULATION W/ - WITH A.3. EXTERIOR FRAMED WALLS: TO OUTSIDE FACE OF STRUCTURAL CORE -STUD <br />Z <br />INT - INTERIOR WD - WOOD Pq - r W <br />LVL - LAMINATED VENEER LUMBER OPENINGS �`, 0 H <br />A.4. WINDOW : <br />LT - LAUNDRY TUB A.4.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING <br />LGT - LIGHT A.4.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING `� 0 5 r-- <br />MAX - MAXIMUM A.5. DOOR OPENINGS:' (0 O <br />MATL - MATERIAL A.5.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING I) � `M O <br />MFR -MANUFACTURER A.5.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING <br />MECH - MECHANICAL A.5.3. INTERIOR FRAMED WALLS: ADJACENT TO SIDE WALL: 5" RETURN MEASURED -J Lq <br />MTL - METAL FROM THE FINISH FACE OF ADJACENT WALL TO INTERIOR FACE OF DOOR <br />MC - MEDICINE CABINET FRAME ~ <br />MIN -MINIMUM A.5.4. INTERIOR FRAMED WALLS: AWAY FROM SIDE WALLS: DIMENSIONED TO CENTER W 0- crj <br />OF DOOR t-t a M e- <br />A.6. SPECIAL AND CODE REQUIRED CLEARANCES - AS INDICATED ON PLANS OR FINISH Q >- Q 00 <br />SYMBOL LEGEND . A.6.1. SURFACE <br />E: T-10" CLEARACE INSIDE FINISH FOR ADA TRANSFER SHOWER z U ~ <br />z� <br />B. ALIGNMENT OF WALLS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE AND <br />a = STAIR CALL OUT HEIGHT OF SHEET NUMBER PLUMB. J 0 <br />STEP DOWN C. THE PRIORITY FOR PROJECT DIMENSIONS SHALL BE IN THE FOLLOWING ORDER: C0 <br />1 INT ELEV NUMBER C.1. CODE MINIMUM - MAXIMUM DIMENSIONS AND CLEARANCES 11, <br />FOOTING CALL OUT - STEP DOWN ARROW SHOWS C.2. LOAD BEARING CONCRETE MASONRY UNIT WALLS <br />C = SEE FOOTING SCHEDULE CALLOUT DIRECTION OF VIEW C.3. FRAMED WALLS EXTERIOR <br />ARROW SHOWS INTERIOR ELEVATION CA. FRAMED WALLS INTERIOR <br />= KEYNOTE CALL OUT DIRECTION OF VIEW MARKER C.5. DOORS AND WINDOWS <br />1 D. FLOOR ELEVATIONS ARE INDICATED TO THE FACE OF THE STRUCTURAL SLAB - <br />A9 ELEV NUMBER UNLESS OTHERWISE NOTED <br />ARROW SHOWS E. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE <br />PRE -CAST LINTEL CALL SHEET NUMBER DIRECTION OF CUT <br />OA OUT - SEE SCHEDULE LENTEL ELEVAEXTERIOR TION MARKER 1 OF MATERIAL AT THE DIMENSION POINT - UNLESS OTHERWISE NOTED <br />Al SECTION NUMBER F. CEILING HEIGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF THE <br />1 <----ELEV NUMBER SHEET NUMBER STRUCTURAL MATERIAL ABOVE AS SCHEDULED <br />G. DIMENSIONS SHOWN ON THE DRAWINGS SHALL INDICATE THE REQUIRED SIZE, <br />LG-2 LEDGER CALL OUT -SEE SHEET NUMBER CLEARANCE AND DIMENSIONAL RELATIONSHIP BETWEEN PROJECT SYSTEMS AND <br />0 LEDGER SCHEDULE 4 A15 COMPONENTS - DIMENSIONS SHALL NOT BE DETERMINED BY SCALING THE <br />3 4--ARROW SHOWS LOCATION OF CUT DRAWINGS. <br />DIRECTION OF VIEW <br />MULTI VIEW INTERIOR SECTION <br />ELEVATION MARKER MARKER RECEIVEc M <br />�- <br />o <br />0 0r 0 <br />N N N N <br />MAY .18 2023 <br />O N �-- � <br />O O O I CD <br />1 Z <br />0 <br />CV <br />� o d o 0 0 IIII <br />r cV ri 4 ui <br />MAY 12 2023 � � <br />1 Cr <br />CO QZ <br />O Zw <br />�4-0-' W W o 0 <br />O N NARM� <br />UVV5 <br />• 1--gz5; <br />Virtual Review Assist, Inc. Lo -0 O oho <br />Plans Review completed and approved W_a <br />for compliance with the 2020 FBC 7th Edition z w g <br />by Debra Anne Klahr PX2300 �- �' W � <br />LENNAR TAMPA DIVISION �n = m=w <br />�o <br />4600 W CYPRESS ST SUITE 200 z=co <br />NOTICE TO BUILDER & ALL SUBCONTRACTORS w �� <br />TAMPA, FL 33607 Q o gWW <br />IT IS THE INTENT OF DESIGN PROFESSIONAL LISTED IN THE TITLE z aZ <br />813.574.5700 BLOCK THAT THESE DOCUMENTS ARE ACCURATE, PROVIDING Z L� <br />LICENSED PROFESSIONALS CLEAR INFORMATION. EVERY ATTEMPT V <br />HAS BEEN MADE TO PREVENT ERRORS: THE BUILDER AND ALL O <br />SUBCONTRACTORS ARE REQUIRED TO REVIEW ALL THE 0 <br />INFORMATION CONTAINED IN THESE DOCUMENTS, PRIOR TO THE <br />COMMENCEMENT OF ANY WORK. THE DESIGN PROFESSIONAL ARE <br />NOT RESPONSIBLE FOR ANY PLAN ERRORS, OMISSIONS,OR <br />MISINTERPRETATIONS UNDETECTED AND NOT REPORTED TO THE <br />DESIGN PROFESSIONAL PRIOR TO CONSTRUCTION. ALL Z w <br />CONSTRUCTION MUST BE IN ACCORDANCE TO THE INFORMATION <br />FOUND IN THESE DOCUMENTS. ANY QUESTIONS REGARDING THE � <br />N <br />INFORMATION FOUND IN THESE PLANS SHOULD BE DIRECTED TO THE LIJ <br />DESIGN PROFESSIONAL LISTED IN THIS TITLE PAGE. NO BACK LAST PLOT DATE <br />1450 CHARGES WILL BE CONSIDERED FOR REIMBURSEMENT BY THE > March 23, 2023 <br />DESIGN PROFESSIONAL WITHOUT ADVANCED NOTIFICATION AND O <br />APPROVAL BY THE DESIGN PROFESSIONAL. <br />J COVER SHEET <br />A <br />