My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6347 Ten Acre Ct
Zephyrhills
>
Building Department
>
Building Plans
>
6347 Ten Acre Ct
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:31:56 PM
Creation date
2/19/2025 8:21:47 AM
Metadata
Fields
Template:
Building Plans
Street #
6347
Location
Ten Acre Ct
Contractor
Lennar Homes
Building Plans - Permit #
5282
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOF FINISH <br />PER ELEVATION <br />12 <br />15 ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />DETAIL <br />61SOFFIT <br />3/4ff 11-011 <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />12 <br />5 MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />ALUMINUM WRAP <br />%'_�ALUMINUM <br />SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL <br />7 13/4 <br />to= 1 <br />I —Off <br />(0 <br />1'4' <br />'�-2" 11-81, 2 tl <br />FALSE FOAM LOUVER DETAIL TYP <br />8 <br />ill= 11-011 <br />6" <br />4" 14 4" <br />A. <br />C14 C4 A, <br />C) 0 <br />00 00 <br />A EPS <br />FOAM <br />BRACKET DEITAIL <br />9 <br />1 ff 1 <br />1-011 <br />PROVIDE FILLED SOLID <br />CMU ABOVE LINTEL TO <br />TIE BEAM <br />FLASHING <br />BEAD WITH WEEP HOLES <br />,,----CASING <br />PT 2X8 LEDGER ATTACHED TO <br />WALL W/ 3/8" X 5" TITEN HD AT <br />12" O.C. STAGGERED <br />(S) H 1 OA-2 <br />ROOF FINISH PER ELEVATION <br />UNDERLAYMENT <br />ELEV AT 8'-0" <br />T2_ T.O.M. <br />5 <br />ROOF SHEATHING <br />(S)A23 <br />. . . . . . MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />2'-0" <br />(S)A23 1-4—ALUMINUM SOFFIT <br />PT 2X4 LEDGER ATTACHED TO <br />WALL W/ 3/16" TAPCONS W/ <br />MIN 2-1/2" EMBEDMENT 6" O.C. <br />BTM AT T-6" <br />SOFFIT DETAIL <br />10 <br />3/411 = 1 <br />1-011 <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />STAGGERED <br />0 <br />8" 114. 11-0.1 <br />LEDGER DETAIL <br />/411 = 1 <br />1-011 <br />- — - — - — - — - — - — - — - — - <br />CASING BEAD <br />7/8" STUCCO --7� WITH WEEP <br />4" STUCCO OVER FRAME SCREED OVER <br />BAND FLASHING <br />8 <br />A5 <br />WEEP <br />SCREED 12 <br />C) III <br />2� <br />21.-1 <br />4" STUCCO <br />BAND <br />5/8" <br />STUCCO <br />OVER <br />MASONRY - <br />FRONT ELEVATION B <br />1/411 = 1 1-011 <br />12 <br />ELEV AT 18'-0" <br />F- <br />�_7/8" <br />T.O.P. <br />0 <br />STUCCO <br />C) W <br />. T <br />C? <br />OVER FRAM% <br />ELEV AT 10'-0" <br />z <br />2ND FLOOR FF <br />CONTROL JOINT <br />U <br />ELEV AT 8'-8" <br />T.O.M. <br />A/C UNIT <br />MID WALL <br />AND PAD <br />WEEP SCREED <br />5/8" STUCCO <br />OVER <br />MASONRY <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />GRADE LINE <br />^REAR LEVATION B <br />3 J/91 = 1-011 <br />1/8 1 <br />11-01, <br />12 <br />5 <br />A/C UNIT -0. <br />AND PAD----,2' <br />16-8" <br />SHINGLE <br />ROOF <br />MEN <br />on <br />12 <br />16'-8" <br />�-7/8" STUCCO <br />ELEV AT 18'-0" <br />T.O. P* <br />CASING BEAD WITH <br />"�WEEP SCREED OVER <br />FLASHING <br />ELEV AT 10'-0" <br />2N�DFL'OOR FF <br />ELEV AT 8'-8" <br />T. 0. M. <br />",—WEEP SCREED <br />I ELEV AT 18'-0" <br />T. 0. P. <br />ELEV AT 10'-0" <br />OVER FRAME-� / 2ND FLOOR FF \-r <br />CONTROL JOIN CONTROL JOINT <br />ELEV AT 8'-8" <br />T.O.M. <br />%/8" STUCCO 7� <br />OVER MID WALL f — "2'-0" <br />CD A/ UNIT <br />MASONRY— WEEP SCREED AND PAD <br />F_ <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />RIGHT ELEVATION B GRADE LINE <br />1/811 = 1 1-011 <br />12 <br />12'-0" 1 F 13'-4" 12'-0" <br />9 W �-7/8" STUCCO <br />&4 X: C? OVER FRAM% <br />2� <br />CONTROL JOINT <br />I-_ <br />X: 18'-8" <br />(D <br />cy? <br />C%j <br />ELEV AT 18'-0" <br />T.O.P. <br />ELEV AT 10'-0" <br />_��FLOO <br />2ND FLO R FF <br />ELEV AT 8'-8" <br />T.O.M. <br />%/8" STUCCO <br />OVER MID WALL <br />MASONRY WEEP SCREED <br />ELEV AT U-0" <br />1 ST FLOOR FF <br />GRADE LINE <br />LEFT ELEVATION B <br />1/891 = 1 1-011 <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />I <br />15'-9" <br />SLOPE <br />5:12 <br />OCT 18 2022 <br />Virtual Review Assist. Inc, <br />Plans Review completed and approvev, <br />for compliance with the 2020 FOC 71h U16o;- <br />by Debra Anne Klafir PX23fp. <br />T-4" L 6-11" <br />A., _L J_ <br />SLOPE <br />5:12 <br />10 "k. <br />III <br />IL <br />0 C'4 <br />-J 77 <br />(1) vo <br />W <br />a_ <br />0 C-4 <br />177 <br />Co Lo <br />T-O" RIDGE <br />VENT <br />SLOPE > <br />5:12 <br />10'-0" RI DG <br />VENT <br />---------- <br />6'-0" RIDGE <br />VENT <br />I SLOPE <br />5:12 <br />(0 <br />� , It — — <br />SLOPE <br />L <br />W <br />a_ <br />0 <br />177 <br />04 <br />-12 <br />5. <br />SLOPE > <br />5:12 <br />11-0 <br />ROOF PLAN B <br />1/811 = 1 1-019 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS'NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC'OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />ROOF GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- \AnNDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN_ OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC, SECTION R806 <br />FORMULA = S.F. / 300 (1/300) * 144 (TO CONVERT TO SQ. INCHES) <br />NET SO. INCH REQUIREMENT <br />ATTIC AREA I = 1268 SQ FT <br />VENTILATION REQUIRED = 609 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 306 SQ IN <br />VENTILATION PROVIDED AT SOFFIT = 1197 SQ IN <br />ATTIC AREA 2 = 445 SQ FT <br />VENTILATION REQUIRED = 214 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 108 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =425 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET (MEASURE <br />VERTICALLY) BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />(VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />* RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />*OFF-RIDGEVENTS - 138 SQ. IN. OF NET FREEAREA/ UNIT <br />* SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />�PPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACE ABILITY TO MANUFACTURER AND PRODUCT <br />777� <br />04 <br />CD <br />C14 <br />04 <br />LO <br />j <br />LO <br />< <br />0 <br />W <br />z <br />0 <br />(D LO E <br />> 0 0 <br />'0 C'? U <br />C") <br />M <br />�2 '6 p <br />co -P ') <br />E--"- -2 co <br />S 0 2 8 <br />_q LL 8) < <br />C U < <br />Ci <br />U Lu <br />00 C14 <br />E <br />C) Cl) <br />0 <br />W LLI <br />(D <br />W <br />cd W 0 <br />W W _j Lu 2 F- 0 <br />W F-< W2 _j fl� g �e z W z <br />it 0::) 2 -, < 0 � x < , 6 0 0, 0 <br />W <br />< < C) <br />F: <br /><CYR_Uz)W 02)20"F-_J�_ <br />a' u) WO 9 0 ;'z 0' R 0 0 C'O CZ, z < <br />I L) <br />0 0 <br />CY <br />U) 0 z <br />LLI a. W U5 Lu W W U5 x Z) <br />F- < _j <br />(D z �e Q z LL 0 W IL <br />� � 8 0 W 0 <br />w U5 K W z IL <br />U_ <br />< <br />0 W F- MW6�0 < <br />0 D oyzg< <br />LL 0 F<- < LL <br />C:) <br />C:) <br />z 04 <br />W <br />0 <br />U) <br />> U) q <br />ce) 0 <br />Ce) r,- <br />Lq <br />I <br />_j <br />'q <br />LL <br />w - r-- <br />z <br />< Uj < L0 <br />1-- IY- a- cy) <br />j)f 0— T-- <br />00 <br />< >- <br />Z C) <br />z <br />W <br />W <br />_j C:) <br />C:) <br />mi <br />(0 <br />CS4 <br />(14 <br />C) <br />CN <br />I-L <br />CNI <br />C:) <br />C:) <br />o6 <br />W <br />W <br />C) <br />C:) <br />C) <br />CD <br />C�l <br />C) <br />C) <br />C) <br />C) <br />C:) <br />C� <br />9 <br />Ob <br />9 <br />A <br />'t- <br />.1 L <br />" <br />co <br />v- <br />a <br />" <br />a <br />CD <br />6 <br />6 <br />'l,-, <br />C) <br />6 <br />C) <br />0 <br />N <br />Ln <br />4) <br />> <br />C> <br />C) <br />CD <br />C) <br />4 <br />C�l <br />CD <br />C) <br />C'%li <br />C'i <br />Ui <br />(61 <br />r'� <br />Lo <br />I <br />00 <br />Cl) <br />Z <br />z 2 <br />0 <br />W <br />0 W U) <br />W <br />�- 5; <br />F- <br />0 <br />__j Li <br />� < <br />0) <br />0 <br />W <br />0 <br />Qf <br />CL X: <br />W F- <br />z <br />W F- <br />W::) <br />< <br />< <br />M 0 Z <br />i,-- r z <br />(D <br />0 t III <br />Z _j <br />r"-4 <br />00 <br />< W 0 <br />z- Z of <br />Z Z ILL <br />C-14 <br />r114 <br />w <br />0< <br />< F- <br />_3 Z <br />< <br />a-W <br />L/) z <br />z <br />z <br />=<O <br />z <br />F- <br />0 <br />0 <br />0 <br />rn <br />z <br />A5 <br />z <br />z <br />III <br />_j <br />04 <br />C14 <br />W <br />CN <br />LAST PLOT DATE <br />> <br />May. 2, 22 <br />z <br />0 <br />EXTERIOR <br />ELEVATIONS B & <br />ROOF PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.