My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6356 Beverly Hills Dr
Zephyrhills
>
Building Department
>
Building Plans
>
6356 Beverly Hills Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 12:10:41 PM
Creation date
2/19/2025 8:22:03 AM
Metadata
Fields
Template:
Building Plans
Street #
6356
Location
Beverly Hills Dr
Contractor
Lennar Homes
Building Plans - Permit #
4647
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1x4 1/2" DRYWALL <br />DOOR JAMB (REFER 1x4 1/2" DRYWALL <br />DOOR JAMB REFER <br />( <br />1x4 <br />1/2" DRYWALL <br />DOOR JAMB (REFER <br />P.T.TO <br />PRODUCT <br />TO PRODUCT <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. <br />1 X 4 <br />APPROVAL FOR CONN. <br />1x4 <br />3-1/4" LONG X 3/16"0 <br />1x4 P.T. <br />FURRING <br />3/16"0 X 3" LONG FURRING <br />TAPCONSTAPCON <br />2 ROWS 3/16" x 3-1/2" <br />( ) <br />FURRING <br />TAPCON. INTO <br />STAGGERED @ 16" 1x8 P.T. <br />FROM EACHIE D w/ MIN. <br />1X8 <br />BLOCK@ SPACING „ <br />1 <br />DETAIL <br />O.C. 2-ROWS INTO <br />2" EDGE DIST. ATTACH <br />PER MANUFACTURE <br />MASONRY THROUGH „ <br />1-1 /2 DETAIL <br />1x8 w/ (2) ROWS 8d NALS <br />3" DETAIL <br />1x4 P.T. & 1x8 P.T. <br />STAGGERED @ 12 0 C <br />DOOR JAMB (REFER <br />TC PRODUCT <br />APPROVAL FOR CONN. <br />3/16" x 3 -1/2" <br />1 x4 P.T. <br />DOOR JAMB (REFER <br />TAPCON 16" <br />TO PRODUCT <br />O.C. & 4" FROM <br />DOOR JAMB (REFER <br />APPROVAL FOR CONN. 1x4 1/2" DRYWALL <br />EACH END W/ MIN <br />TO PRODUCT <br />2" EDGE DIST. <br />APPROVAL FOR CONN. <br />2x8 P.T. w/ (2) ROWS 3/16" <br />x 3-1/2" TAPCON @ 16" 1x4 <br />(2) ROWS 3/16" x 3-1/2" <br />O.C. & 4" FROM EACH FURRIP <br />TAPCON @ 16" O.C. & <br />END w/ MIN. 2" EDGE DIST. <br />4" FROM EACH END w/ 2x8 P.T. <br />ATTACH SECOND PLY w/ <br />2x P.T. AS REQ'D <br />MIN. 2" EDGE DIST. <br />(2) ROWS 10dx3" 2x8 <br />r.r-TA11 <br />n 41An rncTA11 <br />STAGGERED @12"O.C. `-1/d" IIPTA 11 <br />BUILDOUT @ OVER SIZE DOOR -WINDOW ROUGH OPENINGS <br />SCALE: N.T.S. <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />EMBEDMENT INTO BLK.) <br />1 X 4 FURRING <br />BLOCK HEADER <br />1/2" DRYWALL <br />8d NAILS AT 8" O.C. AT BUCK <br />2 x 8 45" DIAGONAL (4)10d NAILS INTO <br />BRACE(S) 2 x 8 BRACE/ BLKG. <br />7/16" OSB <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />SCRIBE (NOTCH) _ POLY -CELL IN THIS AREA X\, <br />BACKSIDE TO FIT ARCH (4) 10d NAILS INTO 2 x 8 <br />CONNECT WI 8d NAILS BRACE/ BLKG. <br />INSTALL WDW. SCREW ANCHO\_2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />INTO ARCH BLKG. PER ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />-- 1-1/2" THK. OR MORE BUCK WITHIN 6" MIN, OF START OF ARCH <br />ARCH DETAIL J <br />SCALE: N.T.S. SS <br />1/4" MAX <br />SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. & BUCK <br />2 x 8 BUCK - CONNECT TO BLOCK <br />2'-0" <br />WITH 1/4" x 3 1/4" TAPCON (1 1/4" MIN. <br />EMBEDMENT INTO ) <br />�1/4" MAX <br />d 2'-0" <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />1 X 4 FURRING <br />BLKG. &BUCK <br />8d NAILS @ 8" O.C. AT BUCK <br />_ 2 x 8 VERT. W/ (2)10d <br />NAILS AT EA. END <br />PROVIDE 2 x 8 DIAG. BRACE BTwN <br />--- <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24 <br />LEAVE A CUT OUT IN O.S.B. ON T <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />7/16" OSB ARCH PANEL <br />SCRIBE (NOTCH) BACKSIDE <br />TO FIT ARCH CONNECT W/ <br />8d NAILS <br />2 x 4 SOLID 3LKG. (FULL WIDTH OF WALLS) <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL <br />INSTALL WDW, SCREW <br />THRU OSB INTO 2 x 8 <br />ANCHOR INTO ARCH BLKG. <br />rK <br />PER INSTALLATION DETAILS <br />ARCH DETAIL <br />B-B <br />SCALE: N.T.S. SS <br />SECTION <br />A -A <br />8" <br />1/4" x 31/4" TAPCONS <br />--LEAVE A CUT OUT IN O.S.B. ON THE <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />�— 2 x 8 45 DIAAGONAL BRACE AT EA. <br />FACE OF ARCH W/ (3) 10d NAILS <br />AT EA. END <br />PROVIDE TAPCON WITHIN <br />4" MIN. OF BRACE <br />START OF ARC <br />4' MAX. RAD. <br />SECTION <br />B-B <br />8" <br />PROVIDE 2x <br />PROVIDE (2) MIN. CONT. W/ (3) <br />TAPCON AT EA. SIDE 12d NAILS <br />BUCK - (1) WITHIN 4" <br />MIN. OF START OF <br />ARCH <br />START OF ARC <br />EQUAL 4' MAX. RAD. <br />PROPER INSTALLATION MAX. $ <br />#5 REB/ <br />(TYP,) <br />STD. 90' <br />t - <br />FILL SOLID <br />BOTH CELLS <br />N <br />HOOK (1 <br />I <br />NOTCH WEB AT <br />L\ <br />+5A <br />FIRST 2 COURSI <br />;APACITY = 805 # FOR 1 STRAP <br />= 1610 # FOR 2 STRAPS <br />1 PLY PRE-ENGINEERED TRUSS <br />SIMPSON HM9KT w/ (4) 1/4"xl 1/2" SDS <br />SCREWS & (5) 1/4" x 21/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16) 16d <br />SINKERS AND (7) 1/4"X21/4" TITEN = 2150 #) <br />BOND BEAM OR CAST IN PLACE BEAM <br />RETROFIT TRUSS DETAIL <br />N.T.S. <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (3) #6 X 4""Y2" WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ i <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />12 <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />ROOF SHEATHING ATTACHED <br />PER NAILING SCHEDULE ALL <br />(5) 12d NAILS SIMPSON <br />2X6 TO 2X4 H2.5A w/ (10) <br />8d NAILS <br />NOTE: <br />SHED ROOF ENDS TO BE <br />GABLE ONLY, CORNERS <br />SHALL NOT BE FRAMED AS <br />HIP. <br />DESIGNED ONLY FOR THE <br />INSTALLATION OF SHINGLE <br />AND METAL ROOF FINISH <br />GLASS BLOCK INSTALLATION NOTES <br />A) <br />COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) <br />ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />C) <br />SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />D) <br />SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />EXPANSION STRIP <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />1/4" EXPANSION BOLT (2 <br />E) <br />INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND Im JOINTS <br />9 ga. PANEL <br />PER ANCHOR) <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />REINFORCING <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) <br />EXPANSION STRIP <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />REINFORCING AS FOLLOWS: <br />= <br />SEALANT <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />. <br />* PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W/ <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />CO <br />i' ' <br />`` "'" .s.;. <br />;��-:��_� <br />`" REINFORCING PANEL <br />SMOOTH. DO NO FURROW. <br />F) <br />PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT._ <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />w:^ =\ `� 6" MIN. LAP <br />G) <br />SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />NOTE: <br />REMAIN FREE OF MORTAR. <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />H) <br />STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) <br />GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />1) <br />AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />J) <br />APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />K) <br />A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />INSTALLATION OF GLASS BLOCK. <br />JACK TRUSS PROVIDED BY—x / <br />TRUSS COMPANY OR 2x4 <br />#2 SYP @ 24" O.C. <br />4'-0" MAX SEE PLAN 000, <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH —J <br />IF TRUSSES USED) W/ (2) #6 X 4%" WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />WALL USE (2) 1/4" X 31/2" TAPCONS AT 16" <br />O.C. <br />SECTION @ ENTRY L <br />SCALE: 3/4" = V-0" SS <br />(1) #5 BARS CONT. <br />TOP WITH MIN. 3" <br />MASONRY WALL. SEE PLAN FOR <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />W.W.M. AT PERIMETER <br />WHERE THIS CONDITION <br />OCCURS <br />COVER 6'-0" F.F. <br />° <br />P. <br />° <br />GRADE <br />co <br />z_ <br />(2) #5 REBAR. MIN. 3" <br />16" MIN. Of COVER EA. WAY <br />SECTION AT DEEP MONO FOUNDATION <br />SCALE: 3/4" = V-0" <br />FILLED CELL PER <br />FOUNDATION PLAN <br />U <br />YP.) <br />THE <br />:S <br />I Id1A/'�/'�f 1'ITAI-fl r IAIC�TA1 I TInAI <br />FILLED CELL INSTALLATION H <br />SCALE: N.T.S. SS <br />SEE ARCH 7-,LAN AND <br />PRE-ENG D.c t N <br />L SEE NOTE 1 BELOW <br />ALUM DRIP EDGE <br />BI G WALL T'+' F'E -T—+- ALU Nl rA:3�::IA <br />PER Pt N I I 1 14" TRIM PAINTED <br />NAIL w/ 5116" HEAD <br />F ( � rIA n,il 24" O.C. <br />F-ArTUJIC� PER <br />Ni0TF RFI 'i,"d CONT ENTE G SOLID SOFFIT <br />' ONT 2x4 (NAILED Ti: L 2x BLOCKING NAILE <br />BLLHsKIt.; .+? 1*_`cl NAILS ('*) H`r .[3 EVERY OTHER 1I;U55 <br />uwf '3- 123 N_' IL':. TYP_ (. ) <br />_,!. iLDER TO VERIFv G'R;', -.'IDF_ :SOFFIT MATERIAL'_,PAN .::APACITIES BASED <br />;:;,N t ; UESIGN PRES;SUkL,_, ',Pt°;.:IFIED FOR C:OMPONEN1 � AND CLADDING <br />LISTED N THE DESIGN C'R' ERIA CD14 SHEET SN. <br />` IEN I sT '«',Al L (PER ALPHA ALUM INt: F ._4 1ti5"4 R5 FL <br />1 Et F,,, rEI-ITATTAOHr"« <br />P7 Ii::T APPRC"1'v'AL) F C I iANNEL 7ASTENED TO: <br />CLI-1 ^ T NAIL .097" DIA @ 2V Ix' SM" MIN. EMBEDMENT <br />i'3) 16 GA. 3/4"x1/4" CRC_ /ld STAPLES @ 24" MAX. t iJ_ IN DIAMOND <br />PA I I I-"N <br />aUB Erh ,.,lip Wti 11;] /aA 3/4'114' CI Rk,J'N I,.kF11_t ;ca3 EACH GROOVE <br />STRUCTURAL SOFFIT <br />S F0 1 SCALE: 314, -1, 0" I' `1 FQR ALUMINUM SOFFITS 'WITH Sr'ANS <br />i-irV. 09.23 202'I 1'-4" N�; f ALA MID SPAN BLQ:]c :KIN,' NFR <br />THE. :.iFF1T FL PA INSTALLATION CHI-[ <br />*REFER TO THE PRODUCT APPROVAL FOR INSTALLATION DETAILS." <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />TRUSS AS SHOWN FOR O.H. UP TO Z-6" <br />* DOUBLE 2X4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />X (2)10d NAILS @ 8" O.C. <br />O�FRyq TO TRUSS TOP CHORD <br />lV E <br />+ + C yOTy PLYWOOD SHEATHING <br />+ + <br />+ + <br />+ + BLOCKING AS <br />+ REQUIRED <br />TO SUPPORT <br />TRUSS + SOFFIT <br />+ <br />2X4 SYP • <br />EACH TRUSS <br />CONNECTOR <br />SEE LINTEL <br />SCHED.11 <br />CENTER SOFFIT <br />PRECAST LINTEL —/ <br />% <br />% <br />SEE ELEVATION <br />2X2 #2 P.T. MIN. <br />FOR OVER HANG <br />W/J-CHANNEL SECURED <br />(MAX. 4'-0") <br />@24" O.C. FASTENED TO <br />CMU W/ 3" LONG T-NAILS @ <br />24" O.C. <br />SECTION @ ROOF EXTENSION <br />M <br />SCALE: 3/4" = V-0" <br />SS <br />SIMPSON HTT4 W/ (18) 10d x 1 <br />1/2" NAILS TO STUDS & (1) - <br />5/8" DIA. ALL THREAD ROD <br />EPDXIED w/ SIMPSON "SET" <br />EPDXY MIN. 6" EMBEDMENT F <br />3" MIN. EDGE DISTANCE <br />RETROFIT FOR MIS <br />MSTAM STRAP <br />SCALE: 3/4 <br />cG1= Cu1=FT fl7 AAIII <br />z <br />O <br />m <br />U_ <br />0 <br />W <br />F- <br />L) <br />2"x BOT. PLATE W/ (2) 1 Od @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />AND NAILED W/ 8d COMMON @ <br />2X BOTTOM PLATE W/ 8d @ 4" <br />6" O.C. EDGES AND 12" O.C. FIELD <br />O.C., 2 ROWS STAGGERED <br />2x BAND JOIST W/ FACE NAIL 10d <br />@ TOP & BTTM CHORD, AND (8) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />METAL SEAT PLATE <br />NOTE: <br />LAP SHEATHING TO <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />SIMPSON HGAM10KTA @ 12" O.C. <br />w/ (4) 1/4xl 1/2" SDS SCREWS <br />INTO BAND JOIST & (4)1/4"x2 3/4" <br />TITEN INTO K.O. BLOCK <br />RETROFIT FOR MISSING EMBEDDED STRAP <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />FILL 1st4 COURSES <br />SOLID W/GROUT <br />4 <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />OVERHANCT <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />NISH <br />T <br />a ? d> <br />° #5 BAR <br />D <br />1'0" ° P ° CENTERED W/ <br />o° .D 9 H b° IN TOP c <br />E�, <br />KNOCKOUT/ �I <br />_ CHAIR BLOCK <br />�II Til=I ° <br />MONO FOOTING - M. I I c <br />.A P A. <br />SIZE AND REINF. PER PLAN III <br />—I °. <br />AND SECTION DETAILS 1 <br />7 E <br />CLEAN FILL o ° ° <br />DIRT z <br />° STANDARD o <br />0 9T HOOK N <br />#5 BAR IN <br />FILLED CELL- <br />a A <br />STEMWALL FOOTING SIZE AND <br />MONO TO STEMWALL FOOTING REINF. N DETARLANILS <br />AND STEMWALL <br />SECTION DETAILS <br />SCALE: 3/4" = V-0" <br />OTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJEC' <br />ONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />EXISTING BOND BEAM. <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />EPDXY CAP TO PREVENT LEAKAGE <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2") <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM <br />FILL CELL FULL HEIGHT W/ <br />NON SHRINK GROUT. <br />#5x6' EMBEDDED INTO <br />EXISTING FOOTING <br />DRILL 3/4"x5" MIN. HOLE <br />SET BAR IN EPDXY <br />(2) #5x6' IN CONC. <br />FILLED CELL <br />4" SAW CUT <br />EXISTING FOOTING A SECTION <br />1 SCALE: N.T.S. <br />RETROFIT FILLED CELL DETAIL <br />SCALE: N.T.S. <br />p,UG 0 3 2022 <br />�v <br />�IftUiaRavle <br />1 - . , nC� <br />Plans 1 ' . <br />1 1 \. I <br />for conlpllaoc;a �'' K� .;. .-•' ,:_ <br />Edition by Depr� Hnr1 <br />,•v . �, j �i� <br />CNV <br />} 1 <br />o <br />N <br />c0 <br />01, <br />L <br />In <br />— <br />PN <br />« <br />q . v 1 _ 805 <br />s/ <br />0Y <br />w <br />LU <br />x <br />0 <br />z <br />NO <br />U <br />>1 <br />4* <br />t , <br />V <br />M <br />�_ <br />7 <br />M <br />U M <br />�` <br />M <br />t O <br />O o <br />N Q <br />• <br />N <br />V <br />w CI_ <br />EMI <br />L <br />p <br />m <br />— a; <br />N <br />a <br />�1-a <br />0 ai W 0 I- <br />a'Z' V—F-- vwHw_j�gZw F-¢ �(rgYw ¢Z °X° V° <br />¢�_JU)o�9If Z000mj�OJ <br />n-WmwWu5W¢Z�0oc¢i <br />=1 <br />0 Z how°g<�Zgwp20 EL <br />GQ o 0QQL¢ <br />LL <br />!I <br />N <br />N <br />O <br />N <br />1 <br />0 <br />N <br />O <br />Se <br />0 <br />,>_, <br />IW- <br />M <br />O <br />O <br />a <br />�aQ <br />a�'a00 <br />z� <br />L) <br />J <br />n. <br />Ln <br />I�. <br />In <br />� <br />LU <br />J <br />00 <br />�O <br />d- <br />O <br />CO <br />c- <br />00 <br />�- <br />00 <br />e- <br />O <br />N <br />O <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />C) <br />CV <br />C) <br />CV <br />O <br />N <br />O <br />CV <br />N <br />O <br />N <br />O <br />O— <br />- <br />O <br />O <br />— <br />00 <br />O <br />N <br />H <br />M <br />O <br />N <br />4 <br />O <br />O <br />d) <br />O <br />& <br />O <br />O <br />r <br />O <br />N <br />0 <br />�- <br />O <br />' <br />i <br />4) <br />� <br />.- <br />o <br />N <br />0 <br />: ce) <br />0 <br />mot' <br />0 <br />U-) <br />0 <br />(0 <br />0 <br />ti <br />M1 <br />0 <br />U) <br />z z <br />z g <br />W <br />.� <br />Ww~> <br />O <br />Q <br />F—OSaa <br />0 <br />a. 1: <br />z <br />Z <br />LU <br />=mOZ <br />2 <br />2 <br />I- 2Z3J <br />Q <br />i-mZw <br />1* LL <br />OgQH <br />Oo <br />N <br />■ <br />U <br />W <br />w 1 <br />a00U�zz <br />Z r"q <br />Z <br />g <br />Z <br />H Q O <br />U <br />� <br />z <br />z <br />Z <br />J <br />W <br />o <br />� <br />N <br />LAST PLOT DATE <br />Jun. 17, 22 <br />STRUCTURAL <br />z Q <br />_I <br />DETAILS—RETRO FIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.