Laserfiche WebLink
W#-1L.. .1!_..�. ..u�lll:-+.1L :....1. ..1 11 .... ,.. ._.IY(�'.1Y 114'+W .:=11L'.....I._ .dY.I JA.. .Li d.'J. •a: W11aiL1J.1:1'3111:1 >tW al.: a.lJrlu411YW...d. i-..LaLL.t <br />np <br />3K <br />EXISTING <br />CAR WASH <br />0 <br />UNDERGROUND TRENCHING <br />EXISTING <br />4 <br />RADIANT <br />CONVENIENCE <br />STORE <br />8 <br />(FIELD VERIFY) <br />FUELING CONTRACTOR TO FIELD <br />VERIFY THE E-STOP IS IN PROPER <br />WORKING ORDER AND E-STOP <br />LOCATION IS READILY AVAILABLE <br />TO THE PUBLIC <br />91.64 <br />0 <br />FUELING CONTRACTOR TO PICK UP <br />CONDUITS AND ROUTE TO FINAL <br />TERMINATION. WHERE POSSIBLE ADD <br />NEW CONDUITS PER SPECIFICATIONS. <br />FUELING CONTRACTOR RESPONSIBLE <br />FOR PULLING WIRE AND MAKING FINAL <br />TERMINATIONS, <br />Mf1 <br />9 <br />0 <br />92.07 <br />I 91.00 <br />I <br />1 <br />2 <br />2 <br />fx <br />U <br />® 1 <br />9 <br />0 <br />I •1 <br />,I, &W i <br />,I• <br />4 <br />)*\9_1-0(0 <br />- - <br />- ARCHITECTURAL SITE PLAN <br />3/32" = 1'-0" <br />GENERAL NOTES <br />FUEL CONTRACTOR <br />1 FUEL GC TO WORK WITH STORE GC ON <br />SCHEDULING. ANY CONFLICTS SHALL BE <br />BROUGHT TO THE ATTENTION OF THE PROJECT =o <br />MANAGER. �. <br />2 FUEL GC RESPONSIBLE FOR ALL CONCRETE OVER <br />TANKS AND PRODUCT PIPING (I.E. TANK SLAB AND (D� <br />DRIVE MATS). CONCRETE CHAIRS ARE BY <br />OWNER. <br />3 NOT USED. <br />4 NOT USED. <br />0 <br />5 FUEL EC TO INSTALL ALL FUEL RELATED <br />ELECTRONICS (I.E. DATA BOXES, PAM UNIT, <br />TURBINE RELAYS, ISOLATION RELAYS, ETC). <br />6 FUEL GC RESPONSIBLE FOR ALL ELECTRICAL <br />CONDUITS, SEAL -OFFS, ELECTRICAL J-BOXES PER Proto 2nd Qtr 04-03-15 <br />STATE, LOCAL, MANUFACTURERS AND OWNER <br />CODES AND SPECIFICATIONS. <br />W 7 FUEL EC TO PULL WIRE FOR CANOPY LIGHTING, <br />INTERCOM, DISPENSERS, TURBINES AND <br />MONITORING SYSTEM DEVICES. <br />Z <br />8 FUEL EC TO MAKE ALL FINAL CONNECTIONS TO Q <br />FUELING EQUIPMENT AND ELECTRONICS. o Ja <br />U")9 FUEL GC TO PULL TRADE PERMITS FOR FUELING J CV) <br />co <br />WORK (AS REQUIRED). J J N <br />Q 10 FUEL GC TO "CALL FOR" AND "BE PRESENT FOR" a Q • cM J <br />ALL LOCAL REGULATOR INSPECTIONS AND D S_ <br />RESPONSIBLE FOR SCHEDULING ON -SITE o Q N <br />INSPECTIONS WITH APPROPRIATE OWNER ILL <br />REPRESENTATIVE RELATED TO FUELING. ~ J U) ~ <br />0 j Q_j W <br />0 <br />11 FUEL GC TO COORDINATE WITH TANKNOLOGY Q (9 _ P <br />AND THE CONSTRUCTION MANAGER FOR TESTING I- = N _ <br />OF FUELING SYSTEM. Z I r U-) <br />>- V <br />< <br />Cn ~ w Q <br />12 FUEL GC TO HAVE PERSONNEL ON SITE FOR <br />TESTING. 0 w N Ur <br />W 13 FUEL GC RESPONSIBLE FOR CLOSE OUT PACKAGE Q 04 <br />0 z <br />PER OWNER MATRIX. J <br />�■■. W <br />1 V- <br />KEY NOTES <br />1 EXISTING RADIANT CONVENIENCE STORE <br />2 EXISTING FUELING CANOPY AND NEW <br />DISPENSERS <br />3 UNDERGROUND FUEL STORAGE TANKS AND SLAB <br />4 FUEL STORAGE TANK VENTS <br />5 EXISTING AIR -VAC MACHINE cc <br />6 NOT USED <br />7 EXISTING MONUMENT SIGN = <br />8 EXISTING VEEDER ROOT SITE MONITOR CONSOLE <br />FIELD VERIFY LOCATION r <br />REVIEWED <br />STATIONARY TANKS PROGRAM 11111111111110 <br />FDON - Pinellas / Petroleum Storage Compliance Program <br />11 <br />FDEP Contraa #GC (-m <br />I a `'t� J W <br />These plans for FDEP Site -■-•-•-- <br />✓' GAS! s U) a <br />concerning (0 o <br />are in substan ' compli wiM F.A.C. 62- _.��r..-- - W 00 <br />00 <br />Dace 2 <br />Reviewer o � a <br />CD <br />o F- CD W U <br />V_ <br />FDEP EQ # SCHEDULE <br />LOCATION <br />EQ. NO. <br />TANKS <br />XERXES - DOUBLE WALL FIBERGLASS <br />200 <br />PIPING <br />SMITH FIBERCAST - FIBERGLASS PIPING REDTHREAD II <br />252 <br />LEAK DETECTION <br />VEEDER ROOT - TLS350 <br />197 <br />LEAK DETECTION <br />VEEDER ROOT - LIQUID AND INTERSTITIAL SENSORS <br />614 <br />LEAK DETECTION <br />VAPORLESS - LINE LEAK DETECTION <br />329 <br />SPILL CONTAINMENT <br />OPW - SPILL MANHOLE FOR TANK FILL <br />708 <br />OVERFILL PROTECTION <br />OPW - 71 SO OVERFILL PROTECTION <br />697 <br />DISPENSER LINER <br />OPW - FDS DISPENSER LINER (SUMP) <br />439 <br />SUMP LINERS <br />XERXES - FIBERGLASS ATTACHED COLLAR <br />397 <br />SUMP LINERS <br />XERXES - FIBERGLASS ACR-WT TANK SUMP <br />397 <br />TANK BURIAL CHART - STORE 1204 <br />COMPONENT <br />REGULAR <br />PREMIUM <br />VENT <br />A. <br />FINISH GRADE ELEV. AT BEGINNING OF RUN (FT): <br />91.64 <br />91.64 <br />91.00 <br />B. <br />PIPE BURY (FT): <br />2,00 <br />2.00 <br />2.00 <br />C. <br />ELEVATION OF PIPE AT BEGINNING OF RUN A-B <br />89.64 <br />89.64 <br />89.00 <br />D. <br />PIPE LENGTH LONGEST RUN (FT): <br />133.00 <br />103.00 <br />73.00 <br />E. <br />PIPING RUN FALL FT D*1 8" PER FT : <br />1.39 <br />1.07 <br />0.76 <br />F. <br />TOTAL CROSSOVERS SWING JOINTS: <br />1.00 <br />1.00 <br />0.00 <br />G. <br />CROSSOVER SWING JOINT DEPTH FT): <br />0.75 <br />0.75 <br />0.00 <br />H. <br />ELEVATION AT END OF PIPE (FT) C-E-G*F): <br />87.50 <br />87.82 <br />88.24 <br />I. <br />ADD FOR EXTRACTOR TEE AT SUMP: <br />1.25 <br />1.25 <br />0.50 <br />J. <br />TOP TANK ELEVATION FT H-I : <br />86.25 <br />86.57 <br />87.74 <br />K. <br />HIGHEST FINISH GRADE ELEVATION AT TANK SLAB FT): <br />91.29 <br />91.29 <br />91.29 <br />L. <br />IMAX BURY DEPTH (K-J) (FT : MAX = 5.67' <br />5.04 <br />4.72 <br />3.55 <br />M. <br />ILOWEST FINISH GRADE ELEVATION AT TANKS (FT): <br />90.90 <br />90.90 <br />90.90 <br />N. <br />IMIN BURY DEPTH (M-J) (FT : MIN = 4.17' <br />1 4.65 <br />4.33 <br />3.16 <br />TANK BURIAL DEPTH IS GOVERNED BY REGULAR PIPING. <br />THE TOP OF TANKS SHALL BE SET AT - 86.25 FT <br />M <br />Z LO <br />co U o <br />Q m <br />W <br />U) m N <br />C Y <br />O N <br />`o�ic�om�oa�omc�f0 <br />UN >,16� cov UE <br />N 4? `c c o cV M Nm O rn <br />�oaO>,�v.--Wacc(D00 <br /><0 NFL (D -0 3 C OL »C (0 = o <br />0. �- - 31K 60 o -.'e - <br />�' c <br />M <br />w CL CID <br />omcoa3�3.c�.>>v, <br />Q o E <br />2Lo6.3w <br />E��a�..va�i�'m <br />uJ�a C9- <br />oo,r-u��o� <br />c�im"_co��o0og <br />�� wo <br />�Olncn.w?oM 0:0' oc:° <br />ow� -Z3 rn <br />011111fioelr <br />_ <CENSF "c9 <br />No 68170 op <br />Z a <br />OF " <br />C N JR1pP::46 <br />SHEET: <br />G0.1 <br />FUELING - USA <br />