Laserfiche WebLink
r; <br />MASONRY LINTEL ASSEMBLIES <br />5EE 5GHEDULE AND 5PEGIFIGATION5 FOR ADVL INFO <br />rr--T, rr--�, <br />!!- MIN. (1) GOUR5EWW 1 '1OU <br />',- MIN. (1) G25E/BOND <br />1 L4J i BEAM ABOVE LINTEL I L4J i BEAM ABOVE LINTEL <br />--- GROUT GROUT <br />BOTTOM REINF. <br />Q I PREGA5T LINTEL w/ ' Q I PREGA5T LINTEL Pi/ <br />_ # EMBEDDED REINF. -t_-� EMBEDDED REINF. <br />MB-1 MB-2 <br />0 <br />i '+� TOP GOUR5E, IF <br />Qr i i 'tom TOP GOUR5E, IF I L4J I <br />m J I L4J I I I READ PER ARCH. <br />v I I REO'D PER ARCH. ----� <br />TOP REINF. OR CANT. GONT. BOND BEAM <br />BOND BEAM REINF. REINF. A5 REQb <br />It GROUT <br />GROUT • ` BOTTOM REINF. <br />BOTTOM REINF. a PREGA5T LINTEL w/ <br />PREGA5T LINTEL w/ -� EMBEDDED REINF. <br />i- EMBEDDED REINF. <br />o MB-3 M13-4 <br />MA50NRY LINTEL DETAILS <br />REINFORGEMENT <br />MARK <br />DE516NATION <br />TOP <br />BOTTOM <br />5HEAR REINFORCEMENT <br />M13-1 <br />8F8-OB/OT <br />----- <br />----- <br />MB-2 <br />81`8-I13/0T <br />----- <br />(1) #5 <br />MB-3 <br />8FI6-IB/IT <br />(1) #5 <br />(1) #5 <br />M13-4 <br />8RFI4-I6 <br />----- <br />----- <br />APPROVED LINTEL MANUFAGTURER5 ARE: GA5T-GRETE, QUALITY PREGA5T GO., <br />AND LOTT'5 GONGRETE. <br />NOTES: <br />I. ALL LINTELS w/ 5PAN5 61REATER THAN 14'-O" SHALL BE PRE5TRE55ED. <br />2. 5HORE FILLED LINTEL5 A5 REGURIED. <br />3. ALL LINTELS SHALL HAVE 4" MINIMUM BEARING U.N.O. <br />4. DO NOT GUT OR MODIFY PRE5TRE55ED LINTELS. <br />5. ALL REINFORGEMENT SHALL BE 6RADE 60, f y=60 k5I <br />6. ALL LINTEL5 5PEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DESIGN. <br />1. ALL LINTELS ARE TO BE LOGATED DIRECTLY ABOVE THE OPENING BELOW <br />SHEET LIST INDEX <br />SHEET DESCRIPTION <br />SHEET TITLE <br />5-0.0 <br />STRUCTURAL NOTES <br />F-1.0 <br />SLAB PLAN <br />F-2.0 <br />BLOCK PLAN <br />5-1.5 <br />ROOF FRAMING PLAN <br />5D-1 <br />FOUNDATION DETAILS <br />50-2 <br />STRUCTURAL DETAILS <br />PBSB-I <br />STRUCTURAL DETAILS <br />GENERAL STRUCTURAL NOTES <br />FOUNDATION <br />• DESIGN 15 BASED ON lth EDITION (2020) FLORIDA BUILDING CODE. <br />• FOOTING DE516N - THESE FOOTINGS HAVE BEEN ENGINEERED FOR A <br />MINIMUM ALLOWABLE 501L BEARING CAPACITY OF 1,500 P5F. <br />• ALL LUMBER EXP05ED TO WEATHER OR IN CONTACT W/ CONCRETE <br />OR MA50NRY FOUNDATION SHALL BE PRESERVATIVE TREATED <br />SOUTHERN PINE #2. <br />• FASTEN PARTITION WALLS TO SLAB WITH)/4" DIA. x 23/4" LONG <br />TAPGON5 a 32" o.G. MAX. WITH A MINIMUM OF 2 TAPGON5 PER <br />PLATE, 12" MAX. FROM PLATE ENDS. <br />• BUILDER TO VERIFY CORR05I0N-RE515TANGE COMPATIBILITY OF <br />HARDWARE 4 FA5TENER5 IN CONTACT w/ PRESERVATIVE -TREATED <br />WOOD. CONTACT LUMBER d HARDWARE 5UPPLIER5 TO GOORD. <br />• CONCRETE DE516N BASED ON AGI 518. CONCRETE SHALL ATTAIN <br />THE FOLLOWING MINIMUM COMPRESSIVE STREN6TH5 IN 28 DAYS, <br />U.N.O.: <br />F'c = 2,500 psi:....... FOOTIN65 <br />2,500 psi:....... 5LAB5 ON GRADE (INTERIOR 6 EXTERIOR) <br />fy = 60,000 psi ...... REBAR <br />• ALL CONCRETE EXPOSED TO THE WEATHER SHALL NOT HAVE LE55 <br />THAN 5% OR MORE THAN 1% AIR ENTRAINMENT. <br />• ALL FOOTIN65 SHALL BEAR AT LEAST 12" BELOW FINISH GRADE. <br />• FOOTI NC75 AND 5LAB5 ON GRADE SHALL BEAR ON GLEAN, FIRM <br />VIRC21N 501L OR GLEAN FILL COMPACTED TO A q5% PROCTOR VALUE <br />• MINIMUM LAP 5PLIGE5 ON ALL REINFORCEMENT SHALL BE 48 BAR <br />DIA. <br />• HOOK5 SHALL BE PROVIDED AT DISCONTINUOUS END OF REINF. <br />• GROUT SHALL BE A5TM G416 F'c=3000 P51 w/ MAX 3/8" AGGREGATE <br />• CONCRETE MASONRY UNITS SHALL BE A5TM GqO WITH A MINIMUM <br />GOMPRE551VE STRENGTH OF Ig00 PSI (F'M = 1500 P50. ALL <br />MORTAR SHALL BE A5TM G210, TYPE 5. GMU DESIGN BASED ON <br />AGI 530/530.1 <br />• REINFORCED GMU GORE5 (A5 INDICATED ON PLAN) SHALL <br />ID BE REINFORCED w/ (1) #5 BAR VERTICAL. BAR SHALL <br />EXTEND INTO BOND BEAM AT TOP WALL AND SHALL <br />AL16N WITH FOOTING DOWEL BELOW. PROVIDE MIN 30" <br />LAP SPLICE WITH FOOTING DOWEL. <br />• GROUT SOLID ALL REINFORCED GMU CELLS AND BOND BEAMS <br />• ALL BOND BEAMS ARE TO BE 8" CONT. FULL LENGTH OF WALL w/ <br />(1) #5 BAR GONT. (TYP. @ EXT. PERIMETER) <br />• PROVIDE (1) #5 BAR GROUTED SOLID ON EACH 51DE OF ALL <br />MASONRY OPENIN65 AND AT ALL WALL CORNERS. <br />• VERTICAL REINFORCEMENT SHALL BE HELD IN PLACE AT THE TOP <br />AND BOTTOM, SHALL BE LOCATED IN THE CENTER OF THE MASONRY <br />CELL, AND SHALL BE LOCATED AT A MAXIMUM OF 6-0" O.G. IN <br />EXTERIOR HALLS. (AS SHOWN ON PLANS) <br />• ROUGH OPENIN65 ARE GALLED OUT ON PLAN - <br />BUILDER TO VERIFY. <br />• PROVIDE CONTROL JOINTS AT ALL IN51DE CORNERS OF SLAB <br />EDGES, AND OTHER LOGATION5 WHERE SLAB CRACKS ARE LIKELY <br />TO DEVELOP. EXACT LOCATIONS PER BUILDER. <br />• SAW GUT OR TOOLED JOINT DEPTH SHALL BE Y4 OF THE DEPTH <br />OF THE SLAB (I" FOR A 4" SLAB) <br />• JOINTS SHALL BE LOCATED 0 12-0" O.G. (RECOMMENDED) OR <br />15-0" O.G. (MAXIMUM) <br />• JOINT GRID PATTERN SHALL BE AS GL05E TO 5QUARE5 AS <br />POSSIBLE (1:1 RATIO), WITH A MAXIMUM OF 1:1.5 RATIO <br />CONNECTION SPEC F I CATI ON5 (TYP. U.N.O.) <br />DE5CRIPTION OF BLDG. ELEMENT <br />3"xO.131" NAILS <br />3"xO.120" NAILS <br />J015T TO SOLE PLATE <br />(5) TOENAILS <br />(3) TOENAILS* <br />50LE PLATE TO JOIST/BLK'6. <br />(3) NAILS ® 4" o.c. <br />(3) NAILS ® 4" o.c. <br />STUD TO SOLE PLATE <br />(2) TOENAILS <br />(5) TOENAIL5* <br />TOP OR 50LE PLATE TO STUD <br />2 NAIL5 <br />(3) NAILS <br />RIM TO TOP PLATE <br />TOENAILS ® 8" o.G. <br />TOENAILS 0 b" o.G.* <br />BLK'6. BTWN. J0I5T5 TO TOP PL. <br />(3) TOENAILS <br />(3) TOENAIL5* <br />DOUBLE STUD <br />NAILS ® 24" o.c. <br />NAILS 0 16" o.c. <br />DOUBLE TOP PLATE <br />NAILS ® 24 o.G. <br />NAILS @ 16 o.c. <br />DOUBLE TOP PLATE LAP 5PLIGE <br />7q7NAIL5 IN LAPPED AREA <br />(11) NAILS IN LAPPED AREA <br />TOP PLATE LAP 0 CORNERS d <br />INTER5EGTIN6 HALLS <br />(2) NAILS <br />(2) NAIL5 <br />* 2Y2"xO.113 15 AN ACCEPTABLE ALTERNATIVE TO A 3"xO.120", SAME 5PAGIN6 OR NUMBER OF <br />NAILS. (ONLY ACCEPTABLE WHERE * ARE SHOWN) <br />a <br />TH15 MODEL HAS BEEN DE516NED IN <br />AGGORDANGE WITH THE � th EDITION (2020) <br />FLORIDA BUILDING CODE (SEGTI ON 160q) <br />LATERAL DES16N REQUIREMENTS FOR THE <br />FOLLOWIN6 WIND SPEED � EXPOSURE ONLY <br />40 MPH - EXP. B <br />WIND I MPORTANGE FAGTOR = 1.0 <br />INTERNAL PRESSURE GOEPF I G I ENT = <br />ENGLOSED, +/- 0.18 <br />ANY WIND SPEED/EXPOSURE NOT L 15TED HERE <br />REQU I RE5 FORMAL EVALUATION � APPROVAL <br />FROM M+K 5TRUGTURAL EN61 NEERI N6. <br />EXTERIOR $ SHEAR WALL <br />SHEATHING 5PEC I F I CAT I DNS <br />INDICATES LOCATION AND EXTENT OF <br />5HEARWALL WHIGH REOUIRE5 SHEATHING AND/ OR <br />FASTENING SPECIFICATIONS BEYOND THAT OF <br />5TNDRD CONSTRUCTION <br />SYMBOL 5HEAR PANEL SPEC. <br />15/32" PLYWOOD OR 05E3 FASTENED N/ <br />PI 2/211x0.131" NAILS @ 6" o.G. ALON6 PANEL <br />ED6E5 AND 12" o.G. IN THE PANEL FIELD. <br />15/32" PLYWOOD OR 05B FASTENED W <br />P3 212"x0.131" NAILS @ 3" o.G. ALON6 PANEL <br />ED6E5 AND 12" o.G. IN THE PANEL FIELD. <br />STANDARD EXTERIOR WALL SHEATHING REQUIREMENTS: <br />SHEATHE ALL EXTERIOR WOOD FRAMED WALLS w/ 15/32" <br />PLYWOOD OR 05B FASTENED w/ ;ZY2"xO.131" NAILS @ 6" O.G. AT <br />ALL PANEL EDGES AND ® 12" O.G. AT CENTER. (U.N.O. ON PLANS) <br />I. ALL PANEL EDGES SHALL OCCUR OVER FRAMING OR 2X <br />BLOCKING SHALL BE PROVIDED TO SUPPORT PANEL EDGE <br />AND FASTENING <br />2. ALL STRUCTURAL PANELS ARE TO BE DIRECTLY APPLIED TO <br />STUD FRAMING @ '6"o.c. MAX. U.N.O. ON PLAN. <br />3. ALL 5HEARWALL5 SHALL HAVE DOUBLE TOP PLATES <br />FASTENED TOGETHER w/ 3Y2"x0.131" NAILS ® 16"o.c. USE (8) <br />%"xO.131" NAILS @ EA. LAP SPLICE. (TYP. U.N.O.) <br />4. LATERAL ANALYSI5 A55UME5 ALL INTERIOR 5HEARWALL5 <br />AND EXTERIOR WALLS ARE CONTINUOUS SHEATHED ABOVE <br />AND BELOW OPENINGS. <br />5, SEE ARCHITECTURAL DRAWINGS FOR APIA WALL <br />CONSTRUCTION REQUIREMENTS. <br />6. ALL EXTERIOR WALLS ARE CONSIDERED 5HEARWALL5. <br />1. WHERE PANELS ARE APPLIED TO BOTH FACES OF WALL, <br />PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT <br />FRAMING MEMBERS. <br />8. A MAXIMUM OF TWO 1'-4" WIDE X 2'-0" TALL OPENINGS ARE <br />PERMITTED TO BE GUT INTO INTERIOR 5HEARWALL5 50 <br />LONG AS THEY ARE FRAMED OUT TO PROVIDE THE <br />5HEATHIN6 EDGE NAILING REQUIRED AND OCCUR 16" MINIMUM <br />FROM THE ENDS OF THE 5HEARWALL. <br />q. ALL 5HEATHIN6 PANELS TO MEET U.S. PRODUCT STANDARD <br />PSI OR P52, OR APA PRP-108 WITH 32�6 SPAN RATING (MAX.) <br />10. NOTE: IF FIRE -RATED DETAILS ARE REQUIRED BY THE <br />ARCHITECTURAL PLANS, THE 5HEATHIN6 USED IN THE -FIRE <br />RATED ASSEMBLIES SHALL BE NOMINAL 1/32" THICK, APA <br />RATED SHEATHING 6 EXP05URE I 05B OR PLYWOOD PEf <br />I I S Pr?nni Ir.T GTAwn.&_Pn Pc�1 nQ Pc,-) nt7 APA Pi?P-InA, it <br />ACCORDANCE WITH THE UL DESIGNS SPECIFIED. <br />Window � Door Allowable Wind Pre55ures <br />140 MPH Wind Zone Ex o5ure B®° <br />OPENING 51ZE <br />INTERIOR ZONES <br />END ZONES <br />8' Garage Door <br />+18.5 P5F/-20.q PSF <br />+18.5 P5F/-20.q P5F <br />I6Garage Door <br />+I1.1 P5F/-Iq.1 P5F <br />+I1.1 P5F/-Iq.1 P5F <br />10 SOFT. <br />+21.2 PSF/-22.q P5F <br />+21.4 PSF/-28.3 PSF <br />20 SOFT. <br />+20.2 PSF/-22.0 P5F <br />+20.2 P5F/-26.4 P5F <br />50 SOFT. <br />+Iq.O P5F/-20.8 PSF <br />+lq.O P5F/-23.q P5F <br />100 SOFT. <br />+18.0 PSF/-Iq.B P5F <br />+15.0 PSF/-22.0 P5F <br />500 SOFT. <br />+15.8 P5F/-I1.6 PSF <br />+15.8 PSF/-11.6 PSF <br />(DEnd Zone i5 defined as the smaller of 10% of least horiz. dim. or 40% <br />Of mean roof height. <br />®Pressures have been derived From 2020 FBG Table R301.2(2). <br />©Pressures charted here are allowable pressures and have been <br />reduced per A5GE 1-16 section 2.4.1 from ultimate pressures. Divide <br />allowable pre55ure5 above by a factor of 0.6 for ult. pressures. <br />ROOF FRAMIN6, <br />• SEE ROOF TRU55 UPLIFT CONNECTOR SCHEDULE FOR ALL ROOF <br />TRU55 CONNECTORS. <br />• ROOF SHEATHING SHALL BE 1/16" MIN. 05B/PLYWOOD SHEATHING 2416, <br />EXPOSURE I. FASTEN SHEATHING TO ROOF MEMBERS w/ 2 3/8"x0.113" <br />RIN6 SHANK NAILS (RSR5-01 OR EQUIV.) 0 6" O.G. AT PANEL EDGES $ <br />0 6" O.G. IN FIELD. FASTEN SHEATHING TO GABLE END 4 DRA6 <br />TRU55E5 w/ RING SHANK NAILS @ 3" O.G. (U.N.O.). PROVIDE BLOCKING <br />ALONG PANEL EDGES AT FIRST 2 TRU55 BAYS FROM GABLE END. <br />PROVIDE "H" STYLE GLIP5 ALONG UNSUPPORTED EDGES. <br />• ROOF 5HEATHIN6 FOR MAIN ROOF TRU55E5 SHALL EXTEND <br />CONTINUOUSLY UNDER ALL OVERFRAMIN6. <br />• TRU55 ALL VALLEY SETS. FASTEN EACH TO TRU55 BELOW w/ <br />51MP50N VTGR CLIPS ® 24" O.G. <br />• ALL METAL HAN6ER5 SHALL BE SPECIFIED BY THE TRU55 <br />MANUFACTURER, UNLESS OTHERWISE NOTED. <br />• ERECT AND INSTALL ROOF TRU55E5 PER WTGA 4 TPI5 BG51 I <br />GUIDE TO GOOD PRACTICE FOR HANDLING, INSTALLING � BRAGING <br />OF METAL PLATE CONNECTED WOOD TRUSSES." <br />• ROOF TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH $ EN6. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• SUPPORT PORCH $ SHORT SPAN ROOF TRUSSES w/ 2x4 LEDGER <br />FASTENED TO FRAMING w/(2) 3"xO.131" NAILS ® 16" O.G. <br />UPLIFT CONNECTORS <br />BEARING CONDITION <br />TRU55 <br />CONNECTOR <br />LENGTH <br />< 15' <br />5IMP50N H2.5T <br />SINGLE ROOF TRUSS BEARING ON <br />> 15' <br />51MP50N HIOA <br />WOOD STUD WALL/WOOD BEAM <br />ROOF GIRDER TRUSS BEARING ON <br />WOOD STUD WALL/WOOD BEAM <br />ALL <br />51MP50N HT520 <br />SINGLE ROOF TRU55 OR PORCH <br />ALL <br />51MP50N HETA16 <br />BEAM BEARING ON GMU WALL <br />ROOF 6.T., FLUSH BEAM OR <br />ALL <br />(2) SIMP50N HETAI6 <br />FLUSH G.T. BR6. ON GMU WALL <br />ALL BEARING POINTS OF EACH ROOF TRU55 SHALL BE CONNECTED <br />WITH CONNECTOR AS LISTED ABOVE. <br />IT 15 THE RESPONSIBILITY OF THE ENGINEER OF RECORD TO DE516N <br />THE UPLIFT GONNEGTOR5 PER SECTION 2.2 OF AN5I/TPI-2014 <br />"NATIONAL DE516N STANDARDS FOR METAL PLATE CONNECTED WOOD <br />TRU55 CONSTRUCTION". MW HAS ENGINEERED ALL ROOF TRU55 UPLIFT <br />CONNECTORS IN ACCORDANCE WITH THE REQUIREMENTS OF A5GE-1-16. <br />ALL UPLIFT CONNECTORS AND LOADS PER TH15 DRAWING SHALL <br />SUPERSEDE THE TRU55 MANUFAGTURER'5 UPLIFT CONNECTOR <br />5PEGIFIGATION5 AND LOADS SHOWN ON THE SHOP CARDS. <br />LEGEND <br />• INTERIOR BEARING WALL <br />• _ _ _ BEARING WALL ABOVE <br />• BEAM / HEADER <br />• - - - LOCATION AND EXTENT OF 5HEARWALL <br />• I; :I EXTENT OF OVERFRAMIN6 <br />• - INDICATES 1/8"A" SAW GUT CONTROL JOINT <br />INDICATES LOCATION OF REINFORCED GMU GORE <br />(5EE NOTES) <br />J L METAL HANGER <br />INDICATES P05T ABOVE. PROVIDE SOLID <br />BLOCKING UNDER P05T OR JAMB ABOVE, <br />GENERAL STRUCTURAL NOTES <br />• DESIGN 15 BASED ON lth EDITION (2020) FLORIDA BUILDING CODE. <br />• WOOD FRAME ENGINEERING 15 BASED ON ND5, "NATIONAL DE516N <br />SPECIFICATION FOR WOOD CONSTRUCTION" - LATEST EDITION. <br />• DE516N LOADS: <br />ROOF LIVE = 20 P5F <br />DEAD = 1 P5F T.G., 10 PSF B.G. <br />LOAD DURATION FACTOR = 1.25 <br />FLOOR LIVE = 40 PSF (INCLUDING 5TAIR5 $ DECKS) <br />= 30 P5F @ SLEEPING AREAS <br />= 50 P5F @ GARAGE <br />= 200 # POINT LOAD @ 6UARD5/HANDRAIL5 <br />= 50 P517 @ GUARD IN -FILL COMPONENTS <br />DEAD = 10 P5F (20 P5F TOTAL @ TILE) <br />WIND ULTIMATE WIND SPEED & EXPOSURE AS LISTED <br />R15K CATEGORY 11 <br />GENERAL FRAMIN6 <br />• EXTERIOR WOOD STUD BEARING WALLS SHALL BE 2x 5PF#2 OR <br />5YP#2 ® 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• INTERIOR WOOD STUD BEARING WALLS SHALL BE 2x 5PF OR 5YP <br />'STUD' GRADE LUMBER 0 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• ALL INTERIOR 5HEARWALL5 SHALL BE CONSTRUCTED WITH 2x <br />'STUD' 6RADE MEMBERS SPACED ® 16" O.G. (MAX.). <br />• ALL NON-BEARIN6 INTERIOR STUD WALL5 SHALL BE CONSTRUCTED <br />WITH 2x 'STUD' 6RADE MEMBERS SPACED ® 24" O.G. (MAX.). <br />• ALL HEADERS SHALL BE SUPPORTED BY (1)2x JACK STUD $ (1)2x <br />KING STUD, MINIMUM. <br />- THE NUMBER OF STUDS SPECIFIED AT A SUPPORT INDIGATE5 THE <br />NUMBER OF JACK STUDS REQUIRED, U.N.O.. <br />• ALL HEADERS, BEAMS 4 OTHER STRUCTURAL MEMBERS SHALL BE <br />5PRUGE-PINE-FIR #2 (5PF) OR SOUTHERN PINE #2 (5YP) LUMBER, OR <br />BETTER (KILN -DRIED). <br />• FACE NAIL MULTI -PLY 2x BEAM5 $ HEADERS W/ 3-ROW5 OF 3"xO.131" <br />NAILS @ 12" O.G. STAGGERED. APPLY NAILING FROM BOTH FAGE5 <br />3-PLY OR MORE CONDITIONS. UTILIZE 2 ROW5 OF NAILS FOR 2x6 d <br />2x8 MEMBERS. <br />• FACE NAIL BUILT UP 2x POSTS W/ 3"xO.131" NAILS ® 16" O.G. <br />STAGGERED. APPLY NAILING FROM BOTH FACES ® 3-PLY OR <br />MORE CONDITIONS. <br />• REFER TO CONNECTION 5PEGIFIGATION5 TABLE FOR ALL <br />GONNEGTION5 (TYP. U.N.O. ON PLANS). <br />• SHEATH ALL WOOD FRAMED EXTERIOR WALLS w/ 1/16" OBB <br />FASTENED w/ 2Y2"x0.131" NAILS @ 6" O.G. ® EDGES & 12" O.G. <br />CENTER FIELD. PROVIDE HORIZONTAL 2x BLOCKING AT ALL <br />UNSUPPORTED PANEL EDGES. TYPICAL U.N.O. ON THE PLANS. <br />• PROVIDE 50LID BLOGKIN6 IN FLOOR SYSTEM UNDER ALL P05T5 <br />CONTINUOUS TO FOUNDATION/BEARIN6. <br />ENGINEERED LUMBER TO MEET OR EXCEED THE FOLLOWING: <br />• L5L - Fb=2325 psi; Fv=310 psi; E=1.55x10^6 psi <br />• LVL - Fb=2600 psi; Fv=285 psi; E=2.Ox10^b psi <br />. FOR 2 4 3 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES T06ETHER <br />WITH 3 ROW5 OF 3"x0.131" NAILS g 8" O/G OR 2 ROW5y4"01/2" <br />51MP50N 5D5 5GREW5 (OR 3Y2" TRU55LOK SGREW5) 0 16" O/G. USE <br />A MINIMUM OF 3 ROW5 FOR BEAM DEPTHS OF 14" OR GREATER. <br />APPLY FA5TENIN6 AT BOTH FACES FOR 3-PLY CONDITION. LOCATE <br />TOP 4 BOTTOM NAIL56GREW5 2" FROM EDGE. 50LID 5,112" OR 5Y4" <br />BEAMS ARE ACCEPTABLE. USE 2 ROW5 OF NAILS FOR 2x6 $ 2x8 <br />MEMBERS. <br />• FOR 4 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES T06ETHER <br />WITH 3 ROW5 OF Y4"x6" 51MP50N 5D5 5GREW5 (OR 6 3/4" TRU55LOK <br />5GREW5) ® 16" O/G. USE A MINIMUM OF 4 ROW5 FOR BEAM DEPTHS <br />OF 14" OR GREATER. APPLY FASTENING AT BOTH FACES (ONE 51DE <br />ONLY FOR TRU55LOK 5GREW5). LOCATE TOP AND BOTTOM 5GREW5 <br />2" FROM EDGE. A SOLID 1" BEAM 15 ACCEPTABLE. <br />• ALL INTERIOR WALL 5TUD5 IN CONTACT w/ GMU HALLS SHALL BE <br />PRESERVATIVE TREATED AND FASTENED w/Y4" DIA. X 4" LONG <br />TAPGON5 ® 24" O.G. <br />11 FLOOR FRAMIN6 <br />• I-JOI5T5/TRU55E5 SHALL BE DESIGNED BY MANUF. TO MEET OR <br />EXCEED L/480 LIVE LOAD DEFLECTION CRITERIA. <br />• ALL METAL HANGERS SHALL BE SPECIFIED BY I-JO15T /TRU55 <br />MANUFACTURER, UNLE55 OTHERWISE NOTED. <br />• I-JO15T/TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH. $ EN6. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• FLOOR SHEATHING SHALL BE 23/32" GONFORMIN6 TO P52-04, <br />24" O.G., EXP05URE I, TONGUE AND GROOVE EDGES, FASTEN <br />SHEATHING TO FRAMING MEMBERS W/ GLUE AND 5'W.131" NAILS <br />6" O.G. AT PANEL ED6E5 4 12" O.G. AT INTERMEDIATE SUPPORTS. <br />TYPICAL STAIR GON5TRUCTION NOTES <br />• (5) SINGLE PLY 2x12 STRINGERS FASTENED TO HEADER AT TOP OR <br />LANDING, WHERE APPLICABLE, AND 2x6 P.T. PLATE AT BOTTOM w/ <br />(1) 51MP50N A35 CLIP AT EACH STRINGER. <br />• FASTEN 2x6 P.T. PLATE TO CONCRETE SLAB w/ (3) 3/6" DIA. x 3 Y2" <br />LONG TAPGONS. <br />• FASTEN END STRINGERS TO ADJACENT WALL5 w/ (2) 3"xO.131" NAILS <br />AT EACH STUD, WHERE APPLICABLE. <br />• PROVIDE 3/4" FLOOR DECKING ON RISERS AND I" FLOOR DECKING <br />ON TREADS. <br />• SEE STAIR FRAMING 5EGTION FOR MORE INFO. <br />seal: �.�`�s <br />N 77 <br />• x - <br />� • r <br />. 9 ; ST E <br />F <br />© copyright: 961PUR Hr� k1Wl1LN <br />Structural EngineerWR 2 32021 <br />az <br />Z <br />JFC <br />w <br />w <br />Z <br />o0 <br />CD <br />CM <br />Z <br />W <br />_J <br />a <br />Q <br />Z <br />A <br />c <br />W <br />Q) <br />.5 j <br />� <br />=a <br />m <br />E <br />;. <br />J '= <br />D o <br />LU <br />= <br />0 o <br />O <br />YP <br />T <br />CO)m` <br />W <br />C N <br />� <br />M d <br />M&K project number: <br />068-19022 <br />project mgr: ,J S B <br />drawn by, BC <br />issue date: 09-2.1-22 1 <br />REVISIONS: <br />date: initial: <br />W <br />I-- <br />d <br />z <br />W <br />o <br />a <br />J <br />J <br />0 <br />LL <br />J <br />d <br />0 <br />0 <br />U <br />Q <br />J <br />J <br />sheet: <br />SM0.0 <br />