Laserfiche WebLink
- _ _ __ _ _ _ , ,1. ___ _ _ I _ _ I _ I I - I I - - '- -1 _ _ I I - - - - I L 1. 11Atf+ I I I I II I <br />"'' <br />GENERAL CONCRETE LINTEL SCHEDULE SYMMETRICAL q <br />• • • • '' ' APPROVED LINTEL MANUFACTURERS; CASTE-CRETE, QUALITY <br />8F8-1B/1T 8178-01EI/1N <br />T ,' E H H E fZC_ �II <br />O ® `.� • TYPE DESIGNATION #5 REBAR AT TOP O H N o I I <br />M() <br />• • • ' � • F =FILLED WITH IN.1REQ'D °v2 � <br />N <br />8RF14-1 B/1T 8RF14-0B/1T GROUT / U= UNFILLED a 4 r c <br />R RECESSED CLEAR <br />•�•, •w•, C O QTY. OF#5 <br />'... REBAR @ BOTTOM ° f° on <br />• . �, . �, : OF LINTEL CAVITY n M.u. 'n ccZn <br />N c <br />�, i <br />8 F 16- B/ 1 T � o ° ° ° MS25- <br />i, Z G ° GROUT y <br />• �'• •'• tNOMINAL.t QUANTITY OF ° S REBAR AT <br />WIDTH #5 REBAR AT ° BOTTOM OF fO ' <br />r� <br />• • • • • , • • • • TOP LINTEL CAVITY <br />8F20-OB/1T 8F20-1 B/1 T 8F1 6-OB/1 T 8F16-1B/1T NOMINAL-° -BOTTOM N D I ' <br />E ki <br />HEIGHT REINFORCING <br />PROVIDED IN o F <br />© ® O © 7-5/8"ACTUAL i <br />8" NOMINAL WIDTH LINTEL O <br />.•, • - (VARIES) <br />I <br />% • �% • = • MATERIALS <br />' 1. fc precast lintels = 3500 psi. <br />• • 2. fc prestressed lintels = 6000 psi. <br />8RF6-06/1 T 3. grouted per ASTM C476 fg = 3000 psi w/ r, <br />. 4. maximum 3/8" aggregate and 8" to 11" slump. _ �9�t ;� a • r, �°EI,F• '� <br />OL • : • : . 5. Concrete masonry units (CMU) per ASTM C90 w/ O I �- Vt' 't / �`•�i <br />- minimum net area compressive strength =1900 psi. <br />,, • , . ' . •• 6. Rebar per ASTM A615 Grade 60. <br />;'• - y Prestressing strand per ASTM A416 grade r - es r •' <br />�• 7. 270 low relaxation. o <br />• • ` '. • '. • 7/32 wire per ASTM A510. - N n <br />: • • 8. Mortar per ASTM C270 type M or S. , L'..! <br />8F20-1 B-2T • • • f� ' <br />GENERAL INSTALLATION NOTES <br />- r•A <br />a, <br />• • •' • ;', © 8RF22-1 B/1 T gF24-OB/1 T 8F24-1 B/1 T 1 • Provide full mortar head and bed joints. J� <br />•,, , , O O O 2. Shore filled lintels as required. <br />•, �'• ;, • 3, Installation of lintel must comply with the architectural and/or structural drawings. <br />4. U-Lintels are manufactured with 5-1/2" long notches at the ends to accommodate I " <br />vertical cell reinforcing and grouting. O ° <br />*' : �' S. Ail lintels meet or exceed U360 vertical deflection, except lintels 17'-4" and <br />• �' ! • : longer with a nominal height of 8" meet or exceed U180. <br />• , . , . •, • • , . ' 6. Bottom field added rebar to be located at the bottom of the lintel cavity. <br />: •, . , :. �', ; :. �', .,', , :.,', , �,', , .. , 7• 7/32" diameter wire stirrups are welded to the bottom steel for mechanical anchorage. 3 <br />• • ' 8. Cast -in -place concrete may be provided in composite lintel in lieu of concrete b <br />• ' • , . ' masonry units. o FP-1 <br />•, . ' . • '. • '. ' '. • 9• Safe load ratings based on rational design analysis per ACI 318 and ACI 530 ca I 3 <br />• ' :'.: ' :'.: 10. Product Approvals: Miami Dade County, Florida Nos.20-0630.16 and 20-0630.15. <br />• 11. The exterior surface of lintels installed in exterior concrete masonry walls shall have E•" <br />' '. • '. • ' . • . ' . • - ' . • 1=3 <br />a coating of stucco applied in accordance with ASTM C-926 or other approvedcoating. un - <br />%•'.o oo <br />12. All lintel dimensions shown are "overall" lintel lengths. , <br />13. Lintels loaded simultaneously with veritcai (gravity and uplift) and horizontal (lateral) <br />loads shoud be checked for combine loading with the following equation: ` " <br />• ' . • : ' , • : • , . : ' , • • i • • ' • ' • , ' . • , Applied vertical load Applied horizontal load FP-1 To the best of the Engineers knowledge, information and belief, 1 <br />,} /y� . O `�O� the structural plans and specifications contained within these <br />• Safe vertical load Safe horizontal load \' drawings comply with the 2020 Florida Building Code - ' <br />• , , : . ,'• :. ,', ,: • , , ' • , . : • . : • , • • , . ' Residential 7th Edition. Engineers signature and seal is only for <br />• : • ; • ; %'• : �'• : %' • : �� o the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />• • • • • • • • • • • • • • • • <br />8F441B/1T8F40OB/1T 8RF400B/1T 8F321B/1T 8F320B/1T 8RF301B/1T 8F280B/1T 8F281B/1T W E <br />V a N co 8 <br />® O O © ® © O OS 0tl�"wN <br />qo o� �Ma <br />ALTERNATE POWERS LINTEL PLAN NOTES: �~ ~� <br />O Q C J LL w <br />I^ J LL LL <br />V w a I <br />STEEL LINTEL - Z a 0 <br />�� �� ��� ° <br />1. THIS PLAN IS TO BE USED FOR STRUCTURAL ° o ' " <br />�r W o�-� o <br />INFORMATION ONLY. co Z <br />W co ci <br />m w r <br />= � MZ J kLL l <br />#5 REBAR AT TOP N O U ¢ °° <br />MIN. (1)REQ' 1-112"CLEAR 2. UNLESS NOTED OTHERWISE ALL LINTEL DEPTHS ARE W as " <br />TO BE ASSUMED TO BE 16" MINIMUM DEPTH. <br />3. THE NUMBER OF COURSES OF MASONRY REQUIRED H M <br />BETWEEN THE LINTEL & THE BOND BEAM SHOULD BE O " <br />oo <br />Lu <br />O <br />C.M.U. COORDINATED WITH THE ELEVATION DRAWINGS7 <br />z s <br />Z5 <br />mom 4. THE CONTRACTOR IS RESPONSIBLE FOR <br />COORDINATING THE PROPER LINTEL HEIGHT. T N z <br />W�°Z 5. LINTELS AT GARAGE DOOR OPENING ARE MINIMUM `� cv N <br />Oy0J2 0 . . <br />oU DEPTH REQUIRED FOR THE DESIGN LOADS. THE "' <br />5 REBAR AT BOTTOM <br />Z�00 _ DEPTH MAY BE INCREASED IF REQUIRED FOR �O w $ I <br />a - x AS INDICATED U <br />�¢ <br />PROPER LINTEL HEIGHT,G.C. COORDINATE. N c <br />16 GAUGE POWERS <br />STEEL BOXED LINTEL C) m ,r <br />w <br />POWERS STEEL BOXED LINTEL NOTES (ALT.) _ $ 1 <br />ONLY IF NOTED ON LINTEL PLAN J E i , <br />POWER STEEL LINTEL IS AN ADEQUATE c En w -o <br />1. Refer to manufacturer's specifications for installation. b ° ° b Q N S m <br />2. Contractor to provide proper protection of lintel to prevent rusting. SUBSTITUTION �Q ALL LOCATIONS UNLESS ~ E G G E ~ <br />Refer to manufacturer's specifications. pe o � <br />3. if lintel is scratched or damaged refer to Powers Steel for repair' NOTED OTHERWISE AT OPENING LOCATION M Q z <br />4. Lintel depth to match precast depth. One #5 Bar required at top 2 _ °' o <br />see lintel plan/details for bottom steel required. Y O p '1 '= o <br />5. A bonding agent must be applied to the Steel Box lintels prior to °' - _ ca E s Z <br />applying the cementitiuos coating. See contractor specifications O O o a o <br />0 <br />�0 U <br />2" DIA. PIN #3 SHEAR REINFORCING @'_ <br />@ 16" O.C. N i_o. <br />fIFYK.O. BLOCK COURSE Nm z <br />�, v < w <br />H H H Z �_ a� mz <br />O O O 2� oa�o <br />00 w/(2)-#5 TOP, MIN (SOLID . Nw <br />a� <br />W � 3 1.o .1 <br />�",� GROUT) G MIN. MIN. MIN. <o <br />(2) #5 REBAR @ BOTTOM w < �I3 <br />_�� ° <br />•• OF LINTEL CAVITY UNIT 1500 UNIT 1397 UNIT 1397 = <br />SYMMETRICAL ` CV <br />PRECAST LINTEL UNIT ' I� U) m <br />BY MANUF. o - <br />o <br />LO <br />T /1\ <br />A�S25 LINTEL W/ SHEAR REINF. M CO o Q <br />Cr Y fV <br />N.T.S. REV 05.02.22 CAB LINTEL PLAN °° (n m Q <br />Ln <br />SCALE:3/16"=1'-O" �' -0 o <br />.� -0 N <br />� Q � N Ln <br />C6 <br />CN o <br />E E z <br />Z E <br />00 N <br />ID <br />m E-;11-0 2 _ <br />d 0 0 Q M <br />JOB NO : 22-06575-06570 <br />SCALE : AS NOTED <br />SHEET NO. <br />L 1 <br />