a .w..: .-,:. n,,-.,_,. -..•,. .,. „ - --- 1 n - - -- - ---- - - -- - - I -. " II1'I�II
<br />LEGEND
<br />— —
<br />COLD WATER PIPE
<br />— — — — — —
<br />HOT WATER PIPE
<br />S
<br />SANITARY PIPE
<br />— — — — — — — —
<br />VENT PIPE
<br />O— c
<br />PIPE UP / PIPE DOWN
<br />T
<br />PIPE TEE FROM TOP / TEE FROM BOTTOM
<br />E 4—
<br />PIPE CAP/ PIPE CONTINUATION
<br />—•—�
<br />BALL VALVE / CHECK VALVE
<br />FLOOR DRAIN / FLOOR SINK
<br />oc
<br />P-TRAP
<br />VENT THROUGH ROOF
<br />'a
<br />CONNECTION TO EXISTING
<br />ABBREVIATION5
<br />A/C
<br />ABOVE CEILING
<br />FFE
<br />FINISHED FLOOR ELEVATION
<br />A/F
<br />ABOVE FLOOR
<br />HW
<br />HOT WATER
<br />B/F
<br />BELOW FLOOR
<br />IMB
<br />ICE MACHINE BOX
<br />BFP
<br />BACKFLOW PREVENTEK
<br />L / LAV
<br />LAVATORY
<br />CD
<br />CONDENSATE DRAIN
<br />MS
<br />MOP SINK
<br />CONT
<br />CONTINUATION
<br />MV
<br />MIXING VALVE
<br />CW
<br />COLD WATER
<br />S / SAN
<br />SANITARY
<br />DN
<br />DOWN
<br />SK
<br />SINK
<br />ET
<br />EXPANSION TANK
<br />TYP
<br />TYPICAL
<br />EWC
<br />ELECTRIC WATER COOLER
<br />V
<br />VENT
<br />FCO
<br />FLOOR CLEANOUT
<br />WC
<br />WATER CLOSET
<br />FD
<br />FLOOR DRAIN
<br />WMB
<br />WASHING MACHINE BOX
<br />ELECTRIC WATER HEATER 5CH EDU LE
<br />TANK
<br />TAG
<br />RECOVERY
<br />5ETPOINT
<br />ELECTRICAL
<br />BA515
<br />CAPACITY
<br />WH- 1
<br />30 GAL
<br />8 GPH @ 80- RISE
<br />1 20'
<br />1 .5 KW
<br />RHEEM EG5P30
<br />P ELECTRICAL PRIOR TO SUBMITTAL OR PURCHASE-THEPLUMBING CONTRACTOR SHALL VERIFY THE APPROPRIATE E ELEC R CHARACTERISTICS OF THE
<br />SELECTED WATER HEATER. COORDINATE DIRECTLY WITH THE ELECTRICAL CONTKACTOK AND THE POWER PANEL SCHEDULES ON THE ELECTRICAL
<br />DRAWINGS.
<br />PLUMBING FIXTURE SCHEDULE
<br />WATER RUNOUT
<br />WATER CONN.
<br />MARK
<br />DESCRIPTION
<br />WASTE
<br />WASTE
<br />VENT
<br />5PECIFICATION
<br />RUNOUT
<br />CONN.
<br />CW
<br />HW
<br />CW
<br />HW
<br />WALL HUNG LAVATORY (AMERICAN STANDARD "LUCERNE," 0355.0 12) WITH CONCEALED
<br />ARM CARRIER MOUNTING (ZURN Z 123 1). PROVIDE 0.5GPM SINGLE HANDLE FAUCET WITH
<br />POLISHED CHROME FINISH (DELTA 50 1 LF-HGMHDF). HANDICAP DRAIN OFFSET W/GRID
<br />L- I
<br />LAVATORY (ADA) - WALL HUNG
<br />2"
<br />1 1/2"
<br />2"
<br />112"
<br />1/2"
<br />3/8"
<br />3/8"
<br />DRAIN (Z_URN Z874G-PC) AND CHROME PLATED P-TRAP (ZURN Z5701 -PC). CHROME PLATED
<br />BiRA55 ANGLE SUPPLY STOPS WITH FLEX SUPPLIES (MCGU(RE H I G5). INSULATE OFFSET,
<br />TRAP AND SUPPLY LINES (TRUEBRO "LAVGUARD.." # 103 E-Z). PROVIDE MIXING VALVE TO
<br />TEMPER HOT WATER TO I 10 DEGREES (LAWLER 7MM', ASSE 1070, LEAD FREE).
<br />WALL HUNG LAVATORY (WHITEHAUS WH- 103K-W). PROVIDE 0.5GPM SIIIGLE HOLE, SINGLE
<br />HANDLE FAUCET WITH POLISHED CHROME FINISH (KOHLER K-97282-4). PROVIDE GRID
<br />L-2
<br />LAVATORY - WALL HUNG
<br />2"
<br />1 1 /2
<br />211
<br />11211
<br />1 /2
<br />3/8
<br />3/8
<br />DRAIN AND CHROME PLATED P-TRAP. PROVIDE MIXING VALVE TO TEMPER NOT WATER TO
<br />I 10 DEGREES (LAWLER'TMM', ASSE 1070, LEAD FREE).
<br />FLOOR MOUNTED, ELONGATED ADA TANK TYPE WATER CLOSET (AMERICAN STANDARD
<br />"CADET PRO RIGHT HEIGHT," 21 5AA. 104), 1.25 GPF, WHITE VITREOUS CHINA, GRAVITY FED
<br />FLUSH ACTION, TOP OF RIM AT 1 G.S" AFF. HIGH EPFICIENCY'WATFRSENSF' LISTED.
<br />PROVIDE ALTERNATE TANK CONFIGURATION (2 1 5AA. 1 05) WITH TRIP LEVER ON RIGHT HAND
<br />WC-
<br />WATER CLOSET (ADA) - TANK TYPE
<br />4"
<br />3"
<br />2"
<br />I/2"
<br />/2°
<br />SIDE IF NECESSARY TO HAVE LEVER ON MOST ACCESSIBLE SIDE OF WATER CLOSET. HEAVY
<br />DUTY OPEN FRONT SEAT. LESS COVER, WITH 5ELF-5U5TAIN[NG CHECK HINGE (BEMIS
<br />105555C). CHROME PLATED BRASS ANGLE SUPPLY STOP WITH 1 2" LONG X 3/5" FLEX
<br />SUPPLY (MCGUIRE M I GG).
<br />BI-LEVEL WATER COOLER (ELKAY EZSTLBLFC) WITH GLASS FILLER ACCESSORY (ELKAY
<br />WATER COOLER (ADA) - BI-LEVEL,
<br />LK I I 10). ORIFICES AT 38 3/8" AND 327/8" AFF. 8 GPH OF 50DEG WATER @ BODEG
<br />EWC- I
<br />2"
<br />112"
<br />2"
<br />112
<br />_--
<br />112"
<br />---
<br />WITH GLASS FILLER
<br />ROOM TEMPERATURE. PROVIDE ACCESSORY APRON (LKAPREZL) IF INSTALLED ON AN
<br />5PECIFICA F ION5
<br />ALL WORK SHALL COMPLY WITH ALL STATE, CITY AND LOCAL CODES, RULES AND REGULATIONS.
<br />CONTRACTOR SHALL SECURE ALL REQUIRED PERMITS AND INSPECTIONS ASSOCIATED WITH THIS WORK,
<br />AND SHALL PAY ALL COSTS AND FEES INVOLVED.
<br />THESE DRAWINGS ARE DIAGRAMMATIC AND DO NOT REFLECT ALL POSSIBLE PHYSICAL CONDITIONS.
<br />REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS AND EXACT LOCATIONS OF EQUIPMENT
<br />AND FIXTURES.
<br />THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE ARCHITECTURAL, STRUCTURAL, CIVIL,
<br />MECHANICAL 4� ELECTRICAL DRAWINGS (AS APPLICABLE) TO ENSURE ALL PLUMBING WORK IS IS
<br />COORDINATED WITH PHYSICAL CONDITIONS. PROVIDE NECESSARY OFFSETS, RISES, AND PIPING TO
<br />COORDINATE WITH THE BUILDING STRUCTURE, WORK OF OTHER TRADES, AND CONNECT POINTS TO
<br />SITE UTILITIES (AS APPLICABLE).
<br />CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS AND SHALL BE FAMILIAR WITH THE SCOPE
<br />AND REQUIREMENTS OF THIS PROJECT. ANY DISCREPANCIES OR LACK OF CLARITY IN THE DOCUMENTS
<br />SHALL BE IDENTIFIED TO THE AIE PRIOR TO THE SUBMISSION OF PRICING BIDS. WITH A SUBMITTED
<br />BID, CONTRACTOR IS ACCEPTING THESE DOCUMENTS AS SUFFICIENT DEFINITION OF THE SCOPE OF
<br />WORK, AND ANY ADDITIONAL COSTS BASED ON UNCLARITY OF CONTRACT DOCUMENTS WILL NOT BE
<br />CONSIDERED,
<br />CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS FOR EQUIPMENT INSTALLATION PRIOR
<br />TO THE SUBMITTAL OF SHOP DRAWINGS. ALL EQUIPMENT AND DEVICES SHALL BE INSTALLED SUCH
<br />THAT THEY ARE EASILY ACCESSIBLE AND SERVICABLE. THIS EQUIPMENT INCLUDES, BUT IS NOT LIMITED
<br />TO: PLUMBING FIXTURES, WATER HEATERS, VALVES, CLEANOUTS, THERMOMETERS, GAUGES,
<br />STRAINERS AND TRAP PRIMERS.
<br />COORDINATE THE ELECTRICAL REQUIREMENTS AND CHARACTERISTICS OF ALL PLUMBING EQUIPMENT
<br />WITH THE ELECTRICAL CONTRACTOR PRIOR TO PURCHASING EQUIPMENT.
<br />ALL WO SHALL BE INSTALLED IN ACCORDANCE WITH THE BEST RECOGNIZED PRACTICE! IN THE FIELD
<br />WORK R R RA
<br />CONCERNED. MANUFACTURED ITEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE
<br />MANUFACTURER'S PRINTED DIRECTIONS, SPECIFICATIONS AND RECOMMENDATIONS.
<br />THE CONTRACTOR 15 RESPONSIBLE FOR REVIEWING THE ARCHITECTURAL DRAWINGS TO ENSURE THERE
<br />IS ADEQUATE WALL THICKNESS SUCH THAT ALL WATER PIPING, SANITARY PIPING, VENT PIPING, WALL
<br />CLEANOUTS, HOSE BIBBS, NON FREEZE WALL HYDRANTS, AND RECESSED ACCESS PANELS WILL FIT IN
<br />WALL SPACE. CONTRACTOR SHALL NOTIFY THE ARCHITECT IF WALL SPACE IS INADEQUATE PRIOR TO
<br />COMMENCING WORK.
<br />UNLESS NOTED OTHERWISE, ALL DRAINAGE PIPING SHALL BE SLOPED AT A MINIMUM Of/5" PER FOOT
<br />2" SANITARY PIPING AND ALL GREASE WASTE PIPING SHALL BE SLOPED ATY4 PER FOOT.
<br />DOMESTIC WATER PIPING SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO
<br />UTILIZATION. PIPING TO BE FLUSHED AND STERILIZED IN ACCORDANCE WITH IPC G 10, 1 AND ALL
<br />APPLICABLE LOCAL AND STATE HEALTH DEPARTMENT STANDARDS.
<br />PIPE PENETRATIONS THROUGH FIRE RATED WALLS OR FLOORS SHALL HAVE EQUIVALENTLY RATED
<br />SLEEVES AND SHALL BE SEALED AND FIRE CAULKED WITH A U.L. LISTED FIRE STOPPING SYSTEM
<br />INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S LISTED DETAILS AND SPECIFICATIONS.
<br />THE CONTRACTOR SHALL OBTAIN EXACT WALL, FIXTURE, AND LAYOUT DIMENSIONS FROM THE
<br />ARCHITECTURAL DRAWINGS. THE CONTRACTOR 15 RESPONSIBLE FOR OBTAINING ROUGH -IN AND
<br />INSTALLATION DRAWINGS FOR ALL PLUMBING FIXTURES, KITCHEN EQUIPMENT AND OWNER FURNISHED
<br />EQUIPMENT (AS APPLICABLE), AND SHALL COORDINATE THE PLUMBING INSTALLATION PRIOR TO
<br />COMMENCING THE WORK, THE CONTRACTOR IS PESPONSLBLE FOR PROVIDING AND INSTALLING ALL
<br />NECESSARY VALVES, CONNECTIONS, TRAPS, ACCESS PANELS, UNIONS, ESCUTCHEONS, WATER
<br />HAMMER ARRESTORS, VACUUM BREAKERS, RELIEF VALVES, PIPE INSULATION, AND EQUIPMENT
<br />SPECIALTY DEVICES AS REQUIRED TO FACILITATE COMPLETE AND OPERATIONAL CONDITIONS WHICH
<br />ARE IN STRICT COMPLIANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br />THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE REQUIREMENTS OF THE COUNTY
<br />HEALTH DEPARTMENT AND OTHER LOCAL AUTHORITIES HAVING JURISDICTION REGARDING CROSS
<br />CONNECTION CONTROL OR OBTAINING A FOOD SERVICE PERMIT (AS APPLICABLE). REPORT ANY
<br />OBSERVED DISCREPANCIES TO THE AIE PRIOR TO COMMENCING WITH THE WORK.
<br />PLATFORM MOUNTED ELECTRIC WATER HEATER
<br />NO SCALE
<br />VACUUM RELIEF VALVE
<br />(WATTS LFN3G-M I OR
<br />EQUAL)
<br />THERMOMETER
<br />DIELECTRIC UNION
<br />(TYP)
<br />ENGINEERED
<br />SUSPENDED WATER
<br />HEATER PLATFORM
<br />SYSTEM BY'HOLDRITE,'
<br />INCLUDING GALVANIZED
<br />HOT WATER
<br />5PEC1 FICATION5
<br />WASTE AND VENT PIPING SYSTEMS AND ACCESSORIES
<br />SANITARY PIPING BELOW GROUND SHALL BE PVC SCHEDULE 40 TYPE DWV WITH SOLVENT WELD JOINTS. SOLVENT
<br />WELD JOINTS SHALL MEET ASTM T-702.3 AND ASTM D-2GG5.
<br />SANITARY PIPING AND VENT PIPING ABOVE GROUND SHALL BE PVC SCHEDULE 40 TYPE DWV WITH SOLVENT WELD
<br />JOINTS. SOLVENT WELD JOINTS SHALL MEET ASTM D-2GG5.
<br />WASTE AND VENT PIPING SHALL BE TESTED IN ACCORDANCE WITH THE GOVERNING CODES. AT A MINIMUM, WASTE
<br />PIPING SHALL BE TESTED WITH AT LEAST 10 FOOT OF WATER HEAD PRESSURE APPLIED. TESTING WITH AIR IS NOT
<br />ALLOWED.
<br />ALL VENTS THROUGH ROOF SHALL BE LOCATED AT LEAST 1 0'-0" AWAY FROM ANY AIR INTAKE, EVAPORATIVE
<br />COOLER, OR ANY OTHER DEVICE THAT WOULD DRAW AIR FROM THE VENT. FLASH AROUND ALL PIPES PENETRATING
<br />THROUGH ROOF WITH STANDARD MANUFACTURED FLA5HINGS. FLASHING SHALL BE SHEEI METAL WITH RUBBER
<br />GASKETS AND SHALL EXTEND INTO ROOFING AND UP PIPE DISTANCES IN ACCORDANCE WITH THE LOCAL CODE.
<br />DOMESTIC WATER SYSTEMS AND ACCESSORIES
<br />WATER PIPING ABOVE FLOOR: HOT AND COLD WATER PIPING ABOVE GROUND SHALL BE CPVC (CHLORINATED
<br />POLYVINYL CHLORIDE) SCHEDULE 40 WITH SOLVENT WELD JOINTS WHEN APPROVED BY THE AUTHORITY HAVING
<br />JURISDICTION. PIPING SHALL MEET ASTM D 2848 AND SHALL BE CERTIFIED BYTHE NSF INTERNATIONAL FOR USE
<br />WITH POTABLE WATER SYSTEMS. SOLVENT CEMENTS FOR CPVC PLASTIC PIPING SHALL MEET ASTM 1`437, ASTM
<br />P438 AND ASTM 1`439.
<br />ALL DOMESTIC HOT WATER PIPING SHALL HAVE A MINIMUM PRESSURE RATING OF I OOPSI AT 1 80°F
<br />DOMESTIC WATER PIPING SHALL BE TESTED IN ACCORDANCE WITH ALL GOVERNING CODES. PIPING SHALL BE
<br />PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIORTO UTILIZATION. PIPING TO BE FLUSHED AND
<br />STERILIZED IN ACCORDANCE WITH IPC G I O. I AND ALL APPLICABLE LOCAL AND STATE HEALTH DEPARTMENT
<br />STANDARDS.
<br />BALL VALVES SHALL BE TWO-PIECE BRONZE BODY, LARGE PORT WITH SOLID, SMOOTH BORE CHROME PLATED
<br />BRASS BALL. SEATS SHALL BE REINFORCED TFE WITH TEFLON PACKING RING AND THREADED ADJUSTABLE PACKING
<br />NUT. PROVIDE STEM EXTENSION AS NEEDED TO PROVIDE HANDLE ON OUTSIDE OF PIPE INSULATION. VALVES
<br />SHALL BE APOLLO 70 OR EQUAL.
<br />3ACKFLOW PREVENTERS SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS FOR EASE OF TESTING AND SERVICING.
<br />FOR BACKPLOW PREVENTERS WITH VENT CONNECTIONS, ROUTE VENT LINE TO NEAREST DRAIN AND DISCHARGE
<br />WITH AIR GAP. BACKFLOW PREVENTERS SHALL BE TESTED IN ACCORDANCE WITH IPC 312. 10.2. CONTRACTOR
<br />SHALL PROVIDE CERTIFICATIONS THAT STATE DEVICES HAVE BEEN TESTED AND APPROVED.
<br />INSULATION
<br />INSULATE ALL DOMESTIC HOT WATER PIPING REGARDLESS OF MATERIAL. WHERE RECIRCULATED HOT WATER IS
<br />SHOWN, INSULATE ALL HOT WATER AND RECIRCULATION PIPING WITH 1 " THICK INSULATION PER CHAPTER 5 OF IECC.
<br />FOR NON -RECIRCULATED HOT WATER SYSTEMS, INSULATION THICKNESS SHALL BE AS FOLLOWS: PIPE UP TO 1": y"
<br />THICK INSULATION. PIPE 14" TO 2": 1 " THICK INSULATION
<br />FOR CPVC COLD WATER PIPING, INSULATE ALL HORIZONTAL PIPING 11" AND OVER LOCATED ABOVE CEILING. THE
<br />INSULATION SHALL BE 1 " THICK.
<br />FOR COPPER COLD WATER PIPING, INSULATE ALL HORIZONTAL PIPING LOCATED ABOVE CEILING AND ALL VERTICAL
<br />PIPING LOCATED IN AN EXTERIOR WALL.
<br />PIPE UP TO 1 ":y" THICK. PIPING ly" AND OVER: 1 11 THICK INSULATION
<br />INSULATION SHALL HAVE A K-FACTOR (AVERAGE THERMAL CONDUCTIVITY) NOT TO EXCEED 0.27 BTU-IN/(HXSQFTX°F).
<br />TANK TYPE WATER HEATERS
<br />WATER HEATERS SHALL BE U_L. LISTED AND SHALL MEET OR EXCEED THE STANDBY LOSS REQUIREMENTS OF U.S.
<br />DEFT. OF ENERGY AND CURRENT EDITION OF ASHRAEIIESNA 90. I
<br />WATER HEATERS SHALL HAVE 1 50PSI WORKING PRESSURE AND BE EQUIPPED WITH EXTRUDED HIGH DENSITY ANODE
<br />ROD AND HIGH TEMPERATURE CUTOFF SWITCH. WATER HEATERS SHALL BE THERMOSTATICALLY CONTROLLED AND
<br />SET TO 120' UNLESS OTHERWISE NOTED. WATER HEATERS SHALL BE INSTALLED ON SUSPENDED PLATFORM, STEEL
<br />STAND OR CONCRETE PAD, AS INDICATED ON DRAWINGS.
<br />WATER HEATERS SHALL HAVE A MINIMUM 3 YEAR LIMITED WARRANTY
<br />WATER HEATERS SHALL BE INSTALLED LEVEL AND PLUMB, FIELD COORDINATE EXACT WATER HEATER LOCATION.
<br />MAINTAIN MANUFACTURERS RECOMMENDED CLEARANCES, AND INSTALL SUCH THAT CONTROLS AND DEVICES ARE
<br />ACCESSIBLE FOR SERVICING.
<br />INSTALL SHUTOFF VALVES IN COLD WATER INLET AND HOT WATER OUTLET, INSTALL THERMOMETER ON HOT WATER
<br />OUTLET. WATER HEATER SHALL HAVE ASME RATED COMBINATION TEMPERATURE AND PRESSURE RELIEF VALVE IN
<br />TOP PORTION OF TANK (FACTORY OR FIELD INSTALLED). PIPE RELIEF VALVE OUTLET TO FLOOR DRAIN, MOP SINK,.
<br />INDIRECT WASTE RECEPTOR ORTO EXTERIOR. MAINTAIN CONTINUOUS DOWNWARD PITCH TOWARD DISCHARGE
<br />LOCATION AND PROVIDE AIR GAP AT DISCHARGE LOCATION. WHERE WATER HEATER DRAIN PAN IS INDICATED ON
<br />PLANS, ROUTE DRAIN TO SAME LOCATION AS RELIEF VALVE AND DISCHARGE WITH AIR GAP.
<br />COLD WATER
<br />BALL VALVE (TYP)
<br />CHECK VALVE
<br />THERMAL EXPANSION
<br />TANK (SEE PLMB
<br />FIXTURE SCHEDULE)
<br />IF NOT FACTORY PROVIDED,
<br />INSTALL ASME RATED TAP
<br />RELIEF VALVE (WATTS 40XL
<br />SERIES OR EQUAL)
<br />HARDWARE PROVIDI
<br />WITH KIT. REFER TC
<br />MANUFACTURER'S
<br />INSTALLATION
<br />INSTRUCTIONS FOR
<br />SPECIFIC DETAILS C
<br />ATTACHING BRACEE
<br />TO MASONRY WALL
<br />FRAMED WALL, ETC.
<br />TWO DIAGONAL
<br />BRACES ACROSS TOP
<br />OF WATER HEATER
<br />FIELD COORDINATE
<br />STRUCTURE ABOVI
<br />RIGIDLY SUPPORT I
<br />FOUR THREADED R
<br />CONTRACTOR SHA
<br />PROVIDE/2" THREA
<br />CONNECT TO EACI-
<br />FOUR CORNER BR/
<br />DRAIN PAN WITH
<br />FACTORY PROVIDE
<br />PVC DRAIN CONNE
<br />(TYPICAL BOTH DEI
<br />OPTION 'A'- SUPPORT FROM WALL
<br />OPTION 'B' - SUPPORT FROM STRUCTURE ABOVE
<br />PROFICIENT
<br />E N G I N E E R I N G
<br />6991 Peachtree Industrial Blvd Building 700
<br />Peachtree Cornets, Georgia 30092
<br />404.330.9798
<br />PROJECT # 118166
<br />H >
<br />w Z�Zo
<br />H 000N
<br />2 2
<br />� pro
<br />Q azow
<br />F- r-
<br />�Rm�
<br />Vr zOO
<br />zom=
<br />F
<br />2 '.1.V '
<br />oO.
<br />Zn0=,
<br />w �Qa3V
<br />p
<br />w w�>�
<br />=zoz0
<br />C7 �azao
<br />0
<br />`��y�aaurr,►,rp
<br />i * : No. 70199
<br />IOR10p •. � ,,.
<br />��.
<br />G
<br />N
<br />E
<br />H
<br />U
<br />W
<br />H
<br />U
<br />N
<br />o2
<br />MO
<br />�Q U
<br />V
<br />Z
<br />z(D
<br />�LLLLN
<br />QLL
<br />w
<br />LO
<br />LJJ = Il-
<br />00
<br />Z `./
<br />Q Z
<br />a(D
<br />U10�
<br />w
<br />w LL
<br />=
<br />U)
<br />LO
<br />PT SOVL41TtONIS:
<br />Z
<br />O0 LO
<br />_ UQM
<br />LL. w
<br />� o � LL
<br />JJow
<br />^ J m J
<br />(`,r) 2 J 2
<br />Cn
<br />M
<br />-17
<br />a o rl
<br />NI�� N
<br />04-09-2018
<br />
|