Laserfiche WebLink
PLACE BOLLARDS AND NEW CONCRETE - <br />MATCH ADJACENT FINISHES - PROVIDE <br />BROOM FINISH ON NEW CONCRETE <br />PROVIDE NEW PATTERNED <br />CONCRETE - MATCH <br />ADJACENT FINISHES <br />N ` 4'-6" 4'-6" 4'-6" 4'-6" <br />N 6.58 42" <br />1., FZIl7 ( l 1 TYP OF 3, REF 2 -SP2 <br />REMOVEABLE --/ 1,2'-0" T-0" L2'4' 6'-7" 5.01 42 <br />BOLLARD, REF 2 - SP2 <br />REF 1 - SP2 <br />GM BOLLARD PLAN <br />3/16" = 1'-0" <br />DETECTABLE <br />WARNING AREA, ETR <br />F —j r BOLLARD, ETR <br />O ® TYP OF 3 <br />REMOVE EXISTING <br />PATTERNED <br />CONCRETE <br />GM BOLLARD DEMO PLAN <br />3/16" = 1'-0" <br />PLACE BOLLARDS AND NEW CONCRETE - <br />i MATCH ADJACENT FINISHES - PROVIDE <br />il <br />BROOM FINISH ON NEW CONCRETE <br />0 0 <br />'-- '----------=o • <br />�fl►l�flflflflflflAfl�flflflfl�lf6�flflfl� ������Ofl��flflff�fl� <br />,ME lwoonflfl=flflflf mmlINAflflfl��flflflfiflflflflflflflflflfNO�fl� <br />�flflflflflflflflflflfl�flflfl�llflflflfll flflfl�fl�flflflfl�flflff�fl� <br />loossmonmp�MEN <br />12"(5.01 2'-0" T-0" <br />TYP OF 2 <br />REF 2 - SP2 <br />Al :14 It i>•91S AM, <br />3/16" = 1'-0" <br />REMOVE EXISTING CONCRETE <br />SHOWN DASHED FOR <br />INSTALLATION OF NEW BOLLARDS <br />PROVIDE NEW PATTERNED <br />CONCRETE - MATCH <br />ADJACENT FINISHES <br />0 0 <br />N <br />4'-6" _1�- 3'-1" <br />6'-7" -� 58 �42 <br />TYP OF 3 <br />REF 2 - SP2 <br />BOLLARD, ETR <br />® ��, O TYP OF 3 <br />DETECTABLE Z- REMOVE EXISTING REMOVE EXISTING CONCRETE — — — <br />WARNING AREA, ETR PATTERNED SHOWN DASHED FOR <br />CONCRETE INSTALLATION OF NEW BOLLARDS 3 5 <br />SP1 SP1 <br />LEGEND <br />FUTURE EXPANSION <br />FUTURE GARDEN CENTER <br />DEMOLITION <br />SITE SHEET NOTES <br />1. POWER WASH SIDEWALK ON FRONT OF BUILDING <br />AND ACC. <br />2. PROVIDE NEW SEALANT AT ALL JOINTS BETWEEN <br />EXTERIOR WALLS AND ADJACENT CONCRETE <br />SIDEWALK/PAVING, REF SPEC 07900. IF PRESENT, <br />REMOVE EXISTING SEALANT AND BACKER PRIOR <br />TO RE -SEALING JOINTS <br />3. REPAINT PERIMETER SIDEWALK AND FIRE LANE <br />CURB. <br />4. RAISE ALL SITE SIGNS WITHIN CLOSE PROXIMITY <br />TO STRUCTURE TO 7'-0" ABOVE GRADE. <br />REF 6-SP2 <br />5. REPLACE ALL MISSING SITE SIGNS WITHIN CLOSE <br />PROXIMITY TO STRUCTURE. <br />6. INSTALL ALL SITE SIGNS AT BUILDING SIDE OF <br />DRIVE LANE IN BOLLARDS. REF 5-SP2 <br />KEYNOTES <br />2.23 INSTALL NEW PLASTIC SLATS <br />5.01 6" PIPE BOLLARD WITH GRAY PLASTIC SLEEVE <br />(HEIGHT OF SLEEVE NOTED ADJACENT TO <br />KEYNOTE) <br />6.58 INSTALL GRAY BOLLARD COVERS AT FRONT <br />ENTRANCE BOLLARDS. ANCHOR COVERS TO <br />BOLLARD. REF SPEC. <br />10 w oui } <br />U) <br />o�DsQ aWp'W- <br />w <br />W = _ - z � H <br />cl� <br />a W" w"'zw¢ <br />O <br />LL <br />xF'am¢mi¢000wl <br />a¢0 w~ E'-oow�= <br />Q2 <br />O <br />�u5wc aural Zd<Y�O <br />UUZ_ l-W=UIY (YU} <br />ao0Q <br />Q <br />uo }>- LL na <br />0aw0w::) <br />d <br />ZZOo <br />�azHti�WOOS➢¢OU <br />U) <br />I=-OO)On wwmm omm <br />Of <br />m <br />IL <br />0 o <br />0') <br />to <br />M <br />C) ©�M <br />O O <br />LL t1 ^ <br />dcli <br />0) <br />O <br />N <br />to <br />Gig <br />= CD0-O <br />M <br />NO <br />o <br />N <br />111 <br />tL' <br />0 <br />r <br />W <br />Nco <br />C <br />ti <br />w <br />m <br />z <br />m <br />O <br />ISSUE BLOCK <br />CHECKED BY: <br />RD <br />DRAWN BY: <br />EB <br />PROTO CYCLE: <br />09/25/20 <br />DOCUMENT DATE: <br />11/06/20 <br />11 /06/20 <br />SITE PLAN <br />3/16" = 1'-0" <br />U <br />�.� <br />SITE PLAN <br />1" = 30'-0" <br />M\I <br />SHEET: <br />spi <br />