Laserfiche WebLink
ALL PLYWOOD ON SALES { <br />EXISTING ROOF DECK <br />FLOOR SIDE OF PARTITION <br />{ { <br />TO BE PAINTED P131 <br />I <br />STUD TRACK <br />ATTACHED TO BOTTOM <br />OF DECK AT 48" O.C. { <br />INSTALL CONTINUOUS LAYER <br />I <br />I I <br />{ { <br />6 MIL POLY CLEAR SHEETING <br />WALL TO BE REMOVED <br />FROM FLOOR TO ROOF DECK, <br />{ <br />OVERLAPPED AT JOINTS A <br />{ { <br />I I <br />MINIMUM OF 2'-0" AND <br />f <br />{ <br />CONTINUOUSLY TAPED AT ALL <br />I I <br />EXISTING FINISH CEILING <br />JOINTS. SEAL VOIDS AT DECK <br />( { <br />REMOVE CEILING PANELS <br />2 ROWS OF 2X BLOCKING { <br />AND LIGHTS AT WALL <br />{ { <br />BETWEEN STUDS. LAP 6 MIL. I I <br />LOCATION. GRID TO REMAIN. <br />I <br />POLY CLEAR SHEETING { <br />SEAL CLEAR SHEETING <br />{ { <br />BETWEEN ROWS AND ATTACH { { <br />AROUND GRID <br />{ { <br />@ 24" O.C. <br />2x BLOCKING BETWEEN <br />6-0" @ LOAD BEARING { { <br />STUDS, PROVIDE 2X <br />BLOCKING BEHIND EACH <br />4'-0" ALL OTHER LOCATIONS <br />HORIZONTAL JOINT IN THE <br />{ { <br />PLYWOOD WALL COVERING <br />DEMO AREA <br />AND ATTACH PLYWOOD TO <br />STUDS AND BLOCKING AT <br />METAL STUDS @ 24" O.C.: { <br />12"OC MAX, TYP <br />WALLS UP TO 14': ( <br />3-5/8" X 22GA { <br />FRP ON 1/2" C/D PLYWOOD <br />WALLS HIGHER THAN 14': <br />OVER 6 MIL. POLY CLEAR <br />+� <br />6" X 18GA { I <br />SHEETING FROM FLOOR TO <br />BOTTOM OF FINISH CEILING. <br />{ <br />3-5/8" x 22GA <br />INSTALL FULL SHEETS, LONG <br />METAL STUD { <br />DIMENSION HORIZONTAL <br />I <br />BRACE @ 96" { <br />STUD TRACK. ANCHOR <br />I I <br />O.C. <br />AT 48" O.C. <br />CONTRACTOR'S { <br />OPTION FOR <br />CONTINUOUS SEALANT <br />i i <br />ATTACHMENT f <br />BETWEEN BOTTOM EDGE OF <br />{ <br />FRP AND FINISH FLOOR <br />I I <br />{ <br />FINISH FLOOR <br />CONTINUOUS SEALANT AGAINST TRACK <br />NOTE: TYPICAL AT FOOD AREAS WITH CEILINGS / NOT ON AN EXTERIOR WALL <br />TEMPORARY FRP CLAD BARRIER/DUST DRAPE <br />3/4" = 1'-0" <br />NOTE: <br />THE GENERAL CONTRACTOR SHALL <br />REPAIR/REPLACE ANY DAMAGED FLOOR TILE <br />DUE TO INSTALLATION OR REMOVAL OF <br />TEMPORARY SECURITY ENCLOSURE. <br />CONTINUOUS SEALANT <br />2x WOOD PLATE <br />112" C/D EXT. PLYWOOD <br />SCREWED TO STUDS OVER <br />6 MIL CLEAR POLY SHEETS <br />EXISTING WALL TO <br />REMAIN <br />M <br />PAINT DUST WALLS TO MATCH <br />ADJACENT IF DUST WALLS TO <br />BE IN PLACE MORE THAN TWO <br />WEEKS. COORDINATE WITH <br />WALMART CONSTRUCTION <br />MANAGER <br />SALES <br />2x4 STUDS @ 24" <br />OC (TYPICAL) <br />CONTINUOUS <br />SEALANT BOTH SIDES <br />OF SILL PLATE <br />2x4 TREATED WOOD <br />SILL PLATE <br />CD <br />z <br />z <br />w <br />d <br />O <br />O <br />z <br />m <br />X <br />w <br />2'-0" <br />SECURITY ENCLOSURE <br />3/4" = 1'-0" <br />DO NOT USE DUST <br />WALL TO SHORE ROOF <br />CONTINUE PLYWOOD JOISTS <br />TO DECK <br />WALL TO <br />BE REMOVED <br />4/2" CD PLYWOOD <br />6'-0" LOAD BEARING <br />4'-0"X8'-0" 4'1 ELSEWHERE <br />HORIZONTAL <br />PROVIDE 2x4 NAILER <br />AT ALL JOINTS I DEMO AREA <br />INSTALL <br />CONTINUOUS <br />LAYER 6 MIL POLY <br />SHEETS TAPE ALL <br />JOINTS <br />2x4 AT 24" OC <br />SALES <br />PAINT DUST WALLS TO MATCH <br />ADJACENT IF DUST WALLS TO <br />BE IN PLACE MORE THAN TWO <br />WEEKS. COORDINATE WITH <br />WALMART CONSTRUCTION <br />MANAGER <br />NOTES: <br />I. INSTALL TEMPORARY <br />WALL IN SECTIONS <br />APPROX 40'-0" PER DAY <br />(COORDINATE WITH STORE <br />MANAGER AND WALMART <br />CONSTRUCTION <br />MANAGER) <br />2. LOCATE VERTICAL 2x4'S <br />AS NOT TO INTERFERE <br />WITH CEILING GRID OR <br />LIGHT FIXTURES <br />3. LOCATE HORIZONTAL 2x4 <br />AT 2" ABOVE CEILING <br />EXCEPT LIGHT FIXTURE <br />LOCATIONS <br />4. SCREW PLYWOOD (MAX <br />SPACING 12" OC) <br />SEALANT UNDER I CONTINUOUS SEALANT <br />BOTTOM PLATE AGAINST PLATE <br />ANCHOR AT 24" OC COORDINATE =SPECIFICATION <br />SECTION 01500. <br />DUST WALL SECTION <br />DEMO AREA <br />J <br />H <br />REMOVE <br />STRIPING <br />DEMOLITIO <br />DEMOLITION LEGEND <br />EXISTING TO REMAIN <br />— — DEMOLISH/REMOVE/RELOCATE <br />_\j AREA TO BE DEMOLISHED <br />TERMITE CONTROL: <br />GC TO PROVIDE TERMITE CONTROL AT <br />REMOVAL OF CONCRETE SLABS) OR <br />TRENCHING PER FBC 2017 SECTION 18. <br />REFER TO SPEC SECTION 023161 FOR <br />MORE INFORMATION ON TERMITE CONTROL <br />WARRANTY, MATERIALS, EXECUTION AND <br />APPLICATION. <br />SHEET NOTES <br />i. SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS <br />DURING NON -CONSTRUCTION HOURS. PROVIDE <br />TEMPORARY COVERS CAPABLE OF WITHSTANDING <br />SHOPPING CART TRAFFIC AND OCCUPANTS FOR PITS <br />AND TUNNELS, REMOVE CONSTRUCTION FENCING AND <br />DUST WALLS INTERFERING WITH CUSTOMER <br />CIRCULATION OR ACCESS.. <br />2. DEMOLITION INCLUDES BUT IS NOT LIMITED TO ITEMS <br />SHOWN DASHED. REF DEMOLITION REQUIREMENT NOTE <br />ON N1 SHEET. <br />3. REMOVE ALL DOORS SHOWN DASHED. REFER TO <br />ENLARGED PLANS AND DOOR SCHEDULE FOR DOOR <br />AND FRAME REPLACEMENT. <br />4. REMOVE CARPET AND GLUE FROM COLUMNS. PATCH <br />AND REPAIR COLUMNS TO SMOOTH SURFACE PRIOR TO <br />PAINTING <br />5. COORDINATE REMOVAL AND DISPOSAL OF EXISTING <br />REFRIGERATED CASES AND FIXTURES WITH <br />MECHANICAL SERVICES CONSTRUCTION MANAGER <br />6. REMOVE EXISTING FITTING ROOMS <br />1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 <br />i <br />RESTROOM DEMOLITION TO INCLUDE BUT IS NOT LIMITED TO: <br />• REMOVAL OF ALL PARTITIONS - <br />• WALL FINISHES TO FACE OF STUDS INCLUDING BATT I <br />INSULATION REMOVE <br />• FLOOR FINISHES TO BARE CONCRETE I STRIPING <br />• LAVATORIES I I <br />• ALL ACCESSORIES I <br />• TEMPORARY REMOVAL OF WATER CLOSETS REF 3-D1 FOR I <br />SECURITY ENCLOSURE ` REMOVE <br />/ STRIPING III U <br />N PLAN <br />-- e ------ _ _ <br />�I <br />00 iu of f <br />i <br />i <br />MC1 <br />REMOVE REMOVE EXISTING <br />ENTRY TILE MILLWORK <br />i <br />REMOVE ALL PVC FLOORING ON SALES <br />FLOOR, EXISTING CONCRETE FLOORING TO <br />BE EXPOSED. PREFERRED FLOORING <br />CONTRACTOR TO POLISH CONCRETE <br />FLOORS, TYP. I <br />REMOVE EXISTING <br />MILLWORK AND REPLACE <br />WITH NEW OWNER <br />FURNISHED GC <br />INSTALLED MILLWORK <br />REMOVE EXISTING SUSPENDED PERIMETER <br />SIGN RAILING <br />REMOVE COUNTERTOPS AT ALL <br />CHECKOUTS <br />REF SHEET SAI FOR BID ALLOWANCE OF <br />DUST WALLS <br />2 <br />y <br />REMOVE <br />ENTRY TILE — —— <br />1 Mrs <br />I <br />I EH) o <br />I i <br />�a 041 li <br />l in <br />II ii <br />RESTROOM DEMOLITION TO INCLUDE BUT IS NOT LIMITED TO: <br />• REMOVAL OF ALL PARTITIONS <br />• WALL FINISHES TO FACE OF STUDS INCLUDING BATT <br />INSULATION <br />• FLOOR FINISHES TO BARE CONCRETE <br />• LAVATORIES <br />• ALL ACCESSORIES <br />• TEMPORARY REMOVAL OF WATER CLOSETS REF 3-D1 FOR <br />SECURITY ENCLOSURE <br />j <br />o <br />P� �I <br />M <br />REMOVE <br />STRIPING <br />-Of <br />' '- = p z m ¢ <br />U) <br />o0 <br />oQ ��'j¢ pwm�wm <br />►�}~p¢�¢7w0�¢ <br />< _Ewo2ow=Z2Ow <br />�UF=Z2'Q <br />0 <br />LL <br />�F-: wi <br />a¢cnt <br />z <br />p�¢�mm�tx� <br />¢twOmwmXww.0� ¢~ <br />wog-w�Zaw O <br />0 <br />QUO�rOW�}m�v�a <br />C�UQ`m�lx-��Uw�p} <br />Oyjw0t;%�a�wly <br />ZZWO <br /><zu uju <br />E- <br />c F00t�¢�O <br />=zo¢��wrco z��w <br />U1 <br />t 0000 -aY 0-aw0am <br />U) <br />E- <br />z <br />U) <br />z <br />0 <br />U <br />m <br />a. <br />00Lo <br />V C co <br />('7 <br />�cn <br />U) N <br />o <br />_� <br />��c6 <br />0 <br />09 <br />_I = o <br />0-1 <br />a <br />VV <br />W <br />m <br />N O <br />Z <br />o <br />IJJ <br />O <br />= m0 <br />NM <br />w <br />m <br />0 <br />z <br />m <br />O <br />ISSUE BLOCK <br />CHECKED BY: <br />RD <br />DRAWN BY: <br />EB <br />PROTO CYCLE: <br />09/25/20 <br />DOCUMENT DATE: <br />11/06/20 <br />11 /06/20 <br />DEMOLITION <br />PLAN <br />SHEET: <br />D 1 <br />3/4" = 1'-0" <br />1 " = 30'-0" <br />