My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36515 Well Hill Way
Zephyrhills
>
Building Department
>
Building Plans
>
36515 Well Hill Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:49:03 AM
Creation date
2/27/2025 11:17:19 AM
Metadata
Fields
Template:
Building Plans
Street #
36515
Location
Well Hill Way
Contractor
Lennar Homes
Building Plans - Permit #
6512
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS BRACING DETAIL (TYP.)r1 <br />SCALE: N.T.S. <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKINGBETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP - <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />----Z-WOOD TRUSS --J <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE: N.T.S. <br />PORCH SLAB SEE <br />FOUNDATION PLAN <br />EXTEND <br />SLAB 1 1/2" <br />—(2) #5's CONT. T&B w/ <br />#3 STIRRUPS AT 4'-0" <br />WHEN DEPTH <br />EXCEEDS 30" <br />GRADE <br />CV z <br />T <br />PORCH SILL K15 <br />SCALE: N.T.S. <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />TRUSS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2X4 SPF 2 (2) #7X 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />* * 2x6 RAFTERS FOR SPANS 4FT TO 8FT <br />2X4 RAFTERS FOR SPANS LESS THAN <br />4FT @ 7-0"O.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO BEAM <br />2X4 CONT. AT-J CONC. MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />SEE FLOOR PLAN SEE PLAN FOR <br />FOR BRIG. OR REQ'D STAIR INFO. <br />NON-BRG. WALL IF CONCRETE STAIRS <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />2'. <br />LU <br />4" <br />- z cn <br />PORCH SLAB SEE g N <br />FOUNDATION PLAN w <br />W z <br />(2) #5's CONT. T&B - ,, <br />W/ #3 STIRRUPS AT iv z <br />4'-0" WHEN DEPTH , T <br />EXCEEDS 30" LOWER OR <br />Ilk GARAGE SLAB <br />SEE PLAN <br />LARGE STEP DOWN 17 <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />2x4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�A TRUSS <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />JACK <br />MAX 24" SPAN (EITHER USSES HIP <br />SIDE OR BOTH IF REQ'D) G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE: N.T.S. <br />z <br />O <br />4 <br />w <br />J <br />w <br />w <br />w <br />U) <br />WOOD POST. SEE FLR <br />PLAN FOR SIZE & BASE <br />CONNECTION SEE <br />—� PLAN <br />EXTEND <br />- -� -- *-----= SLAB 1 1/2" <br />- _ • ` <br />- _ - 4" (2) #5's CONT. T&B w/ <br />- - <br />#3 STIRRUPS AT 4'-0" <br />PORCH SLAB SEE WHEN DEPTH <br />FOUNDATION PLAN EXCEEDS 30" <br />-- ' - RADE <br />• N cz <br />V-4" <br />2 ENTRY PORCH SILL 14 <br />SCALE: N.T.S. <br />WOOD OR MASONRY ABOVE <br />MASONRY PIER SEE FLOOR PLAN <br />FOR COLUMN INFO WOOD OR MASONRYIT <br />INTEGRATE MASONRY ABOVE MASONRY <br />KNEEWALL INTO CMU BASE OR PIER SEE FLOOR <br />MAIN HOUSE PER ELEVATION IF PLAN FOR COLUMN <br />REQUIRED INFO <br />1 I MASONRY KNEE WALL MAX 3 = <br />1 COURSES w/ TOP K.O. COURSE CMU BASE W/ (1) #5 <br />1 w/ (1) #5 CON <br />REQ'D @ MID <br />1 I <br />rT--- -------- <br />1 �I j---- <br />1 11 j <br />III <br />I I 1 <br />1 I 1 <br />1 1 1 <br />1 I ® 1 <br />T. FILLED CELL VERTICAL EACH <br />SPAN MAX 6'-8" CORNER FILLEDAk 1 1(r <br />MAX 3 SOLID. SEE ELEV. j j <br />COURSE FOR BASE SIZE <br />(3) #5's EA. WAY 1 1 <br />1 1 <br />1 1 <br />-------'i• <br />8" <br />SLAB PORCH SLAB SEEAk - <br />LEVEL FOUNDATION PLAN <br />(2) #5's CONT T&B w/ z <br />CONTRACTOR TO INSTALL SEE CUT N <br />MIN 3" x 3" WEEP HOLE SECTION FORWHEN DEPTH <br />#3 STIRRUPS AT 4'-0" '- <br />ALONG W/ PITCHING SLAB MORE INFO EXCEEDS 30" <br />TO DRAIN WATER <br />V-4" <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILLr16 <br />SCALE: N.T.S. <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL r7 <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY w/ <br />(3) ROWS OF 16d NAILS <br />AT 24" O.C. <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF Z PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d AND J/S6 FOR MORE INFO. <br />NAILS TO LEDGER VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE: 1/2" = 1'-0" <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />SIMPSONLSTAI8 __________ N <br />w/ (12) 10d NAILS SIMPSON HUC410 w/ (14) - I SEE PLAN <br />CENTERED AT I I I I I 'FOR CANT. y: <br />I I 16d INTO HEADER & (6) y: <br />SPLIT TO TIE 10d INTO BEAM -SEE I I RUSS/ <br />BEAMS TOGETHER I 1 I I I OP WAL <br />I I ROOF PLAN FOR MORE <br />I INFO I EE PLAN <br />I I <br />SEE FLOOR PLAN FOR I I I ' Y2" CDX PLYWOOD OR %s" O.S.B. MIN. (2) 2x8 #2 SYP <br />I i COLUMN SIZE & BASE I I I 7/16" OSB FLITCH PLATE SHEATHING REQ'D FROM BOTTOM HEADER. SEE Q/S4 FOR <br />SEE FLOOR PLAN i CONNECTION INFO I I REQ'D ONLY WHEN OF WALL TO ROOF SHEATHING <br />I I ___ ___ REQ'D CONNECTIONS <br />FOR COLUMN SIZE L I I I INDICATED ON BM. ABOVE W/ 8d NAILS @ 4" O.C. IN <br />& ADDITIONAL INFO. 7/16" OSB FLITCH PLATE L J SEE FLOOR PLAN OR SCHEDULE/PLAN FIELD, EDGES & BOUNDARIES <br />REQ'D ONLY WHEN COLUMN SIZE & BASE 2x4 #2 SPF STUDS @ <br />OPTION A SCHEDULDE/ON PLANM OPTION B CONNECTION INFO OPTION C <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />COMMON BM TO POST ATTACHMENT TOP <br />EXTERIOR SHEATHING A <br />ATTACHED PER SEE ROOF PLAN <br />NAILING SCHEDULE FOR BEAM SIZE & <br />CONNECTION INFO. <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE: N.T.S. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />CORNER I I� SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />1 <br />SIMPSON (2) <br />HTS20 w/ (14) <br />10d NAILS <br />TYP. U.N.O. <br />MIDDLE <br />BM. SPLICE OVER <br />CENTER OF POST <br />SEE PLAN MAX. <br />24" STEPS - <br />SEE PLAN FOR OPT <br />2x4 #2 SYP P.T. PLATE W/ <br />V8" EPDXY ANCHOR OR <br />J-BOLT OR Y2" TITEN HD <br />ANCHOR @ 24" O.C. W/ <br />MIN. 6" EMBEDMENT <br />STAIR INFO. IF "< A j <br />CONCRETE STAIRS f <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />q <br />a ^.I <br />e a. e <br />a, <br />a II <br />a <br />. ' I a ° . a d'_ <br />GARAGE OR CN <br />,- A • .a 8 <br />LOWER SLAB <br />SEE PLAN <br />a <br />MAIN HOUSE <br />SLAB <br />(2) #5's CONT. T&B <br />W/ #3 STIRRUPS AT <br />4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />SECTION GARAGE MONO 21 <br />SCALE: N.T.S. <br />O o <br />N -o - <br />i�� W <br />o <br />ci a e� o <br />Z c lO w N <br />a <br />a O — <br />04 <br />y <br />y d C <br />m d <br />C, t C <br />d�_a <br />L <br />16 y C7 i7 <br />J = 67 <br />c o <br />ate• <br />y E .n <br />c <br />o <br />d <br />0 <br />e•,ay�3�1�€4€l4tE iiPtllf/A�if` <br />o W1y <br />As C<\ <br />'. • ELo <br />�, Q ''••.....••''NPR, �� <br />O F E S S 10 ,\\\ <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />0 <br />W d <br />O M E <br />v <br />C 00 N or0 <br />W U)cr� <br />Q y'(h V zszs LL <br />C _1 5 LL <br />0 Ju_� 55 W a- <br />-vim a 2 <br />Z t.cf0. <br />N O O <br />W co m <br />Z LO co <br />co Z a J <br />Z OU 00 <br />_ W ❑❑ <br />a) Z N M <br />z CD <br />z <br />J <br />N <br />cn <br />N z <br />CD .9 Cz <br />a)4--J V) '1 <br />Q) V � <br />w g <br />to c "' <br />�N <br />- CD <br />U <br />w <br />�— — E <br />= L <br />U 0 • <br />c C/) 440— <br />ffl. <br />9 <br />o< <br />w <br />Z <br />M G <br />LL_E <br />Z <br />s? p wo z® <br />E lJ a a <br />9 (0 g� 00 <br />U <br />z �aoz <br />d f6 ao wz <br />o m <br />cn < O � <br />z C NS ZzF <br />m N � '< W <br />S J F� <br />zo <br />W 8 o� T. <br />C> <br />m .� <br />aLL <br />�_ J z �I <br />� a 0 <br />¢ <br />zla <br />a 3 <br />2 C)= <br />0 <br />E <br />> Lt7 <br />0 rn <br />T <br />c� <br />i� O <br />co Lo <br />�\ T LO <br />Cr co 1� <br />2 N a 0 _ <br />m _ L0 <br />CO N <br />LO C)Ln <br />T Q LOCD <br />LO <br />T <br />M T_ o <br />f0 j O y Z <br />Z E N <br />E <br />„ :? C <br />a. 0 ¢ o <br />JOB NO: 23-06122 <br />SCALE: AS NOTED <br />SHEET NO. <br />D 1 <br />T. FILLED CELL VERTICAL EACH <br />SPAN MAX 6'-8" CORNER FILLEDAk 1 1(r <br />MAX 3 SOLID. SEE ELEV. j j <br />COURSE FOR BASE SIZE <br />(3) #5's EA. WAY 1 1 <br />1 1 <br />1 1 <br />-------'i• <br />8" <br />SLAB PORCH SLAB SEEAk - <br />LEVEL FOUNDATION PLAN <br />(2) #5's CONT T&B w/ z <br />CONTRACTOR TO INSTALL SEE CUT N <br />MIN 3" x 3" WEEP HOLE SECTION FORWHEN DEPTH <br />#3 STIRRUPS AT 4'-0" '- <br />ALONG W/ PITCHING SLAB MORE INFO EXCEEDS 30" <br />TO DRAIN WATER <br />V-4" <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILLr16 <br />SCALE: N.T.S. <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL r7 <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY w/ <br />(3) ROWS OF 16d NAILS <br />AT 24" O.C. <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF Z PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d AND J/S6 FOR MORE INFO. <br />NAILS TO LEDGER VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE: 1/2" = 1'-0" <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />SIMPSONLSTAI8 __________ N <br />w/ (12) 10d NAILS SIMPSON HUC410 w/ (14) - I SEE PLAN <br />CENTERED AT I I I I I 'FOR CANT. y: <br />I I 16d INTO HEADER & (6) y: <br />SPLIT TO TIE 10d INTO BEAM -SEE I I RUSS/ <br />BEAMS TOGETHER I 1 I I I OP WAL <br />I I ROOF PLAN FOR MORE <br />I INFO I EE PLAN <br />I I <br />SEE FLOOR PLAN FOR I I I ' Y2" CDX PLYWOOD OR %s" O.S.B. MIN. (2) 2x8 #2 SYP <br />I i COLUMN SIZE & BASE I I I 7/16" OSB FLITCH PLATE SHEATHING REQ'D FROM BOTTOM HEADER. SEE Q/S4 FOR <br />SEE FLOOR PLAN i CONNECTION INFO I I REQ'D ONLY WHEN OF WALL TO ROOF SHEATHING <br />I I ___ ___ REQ'D CONNECTIONS <br />FOR COLUMN SIZE L I I I INDICATED ON BM. ABOVE W/ 8d NAILS @ 4" O.C. IN <br />& ADDITIONAL INFO. 7/16" OSB FLITCH PLATE L J SEE FLOOR PLAN OR SCHEDULE/PLAN FIELD, EDGES & BOUNDARIES <br />REQ'D ONLY WHEN COLUMN SIZE & BASE 2x4 #2 SPF STUDS @ <br />OPTION A SCHEDULDE/ON PLANM OPTION B CONNECTION INFO OPTION C <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />COMMON BM TO POST ATTACHMENT TOP <br />EXTERIOR SHEATHING A <br />ATTACHED PER SEE ROOF PLAN <br />NAILING SCHEDULE FOR BEAM SIZE & <br />CONNECTION INFO. <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE: N.T.S. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />CORNER I I� SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />1 <br />SIMPSON (2) <br />HTS20 w/ (14) <br />10d NAILS <br />TYP. U.N.O. <br />MIDDLE <br />BM. SPLICE OVER <br />CENTER OF POST <br />SEE PLAN MAX. <br />24" STEPS - <br />SEE PLAN FOR OPT <br />2x4 #2 SYP P.T. PLATE W/ <br />V8" EPDXY ANCHOR OR <br />J-BOLT OR Y2" TITEN HD <br />ANCHOR @ 24" O.C. W/ <br />MIN. 6" EMBEDMENT <br />STAIR INFO. IF "< A j <br />CONCRETE STAIRS f <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />q <br />a ^.I <br />e a. e <br />a, <br />a II <br />a <br />. ' I a ° . a d'_ <br />GARAGE OR CN <br />,- A • .a 8 <br />LOWER SLAB <br />SEE PLAN <br />a <br />MAIN HOUSE <br />SLAB <br />(2) #5's CONT. T&B <br />W/ #3 STIRRUPS AT <br />4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />SECTION GARAGE MONO 21 <br />SCALE: N.T.S. <br />O o <br />N -o - <br />i�� W <br />o <br />ci a e� o <br />Z c lO w N <br />a <br />a O — <br />04 <br />y <br />y d C <br />m d <br />C, t C <br />d�_a <br />L <br />16 y C7 i7 <br />J = 67 <br />c o <br />ate• <br />y E .n <br />c <br />o <br />d <br />0 <br />e•,ay�3�1�€4€l4tE iiPtllf/A�if` <br />o W1y <br />As C<\ <br />'. • ELo <br />�, Q ''••.....••''NPR, �� <br />O F E S S 10 ,\\\ <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />0 <br />W d <br />O M E <br />v <br />C 00 N or0 <br />W U)cr� <br />Q y'(h V zszs LL <br />C _1 5 LL <br />0 Ju_� 55 W a- <br />-vim a 2 <br />Z t.cf0. <br />N O O <br />W co m <br />Z LO co <br />co Z a J <br />Z OU 00 <br />_ W ❑❑ <br />a) Z N M <br />z CD <br />z <br />J <br />N <br />cn <br />N z <br />CD .9 Cz <br />a)4--J V) '1 <br />Q) V � <br />w g <br />to c "' <br />�N <br />- CD <br />U <br />w <br />�— — E <br />= L <br />U 0 • <br />c C/) 440— <br />ffl. <br />9 <br />o< <br />w <br />Z <br />M G <br />LL_E <br />Z <br />s? p wo z® <br />E lJ a a <br />9 (0 g� 00 <br />U <br />z �aoz <br />d f6 ao wz <br />o m <br />cn < O � <br />z C NS ZzF <br />m N � '< W <br />S J F� <br />zo <br />W 8 o� T. <br />C> <br />m .� <br />aLL <br />�_ J z �I <br />� a 0 <br />¢ <br />zla <br />a 3 <br />2 C)= <br />0 <br />E <br />> Lt7 <br />0 rn <br />T <br />c� <br />i� O <br />co Lo <br />�\ T LO <br />Cr co 1� <br />2 N a 0 _ <br />m _ L0 <br />CO N <br />LO C)Ln <br />T Q LOCD <br />LO <br />T <br />M T_ o <br />f0 j O y Z <br />Z E N <br />E <br />„ :? C <br />a. 0 ¢ o <br />JOB NO: 23-06122 <br />SCALE: AS NOTED <br />SHEET NO. <br />D 1 <br />CONTRACTOR TO INSTALL SEE CUT N <br />MIN 3" x 3" WEEP HOLE SECTION FORWHEN DEPTH <br />#3 STIRRUPS AT 4'-0" '- <br />ALONG W/ PITCHING SLAB MORE INFO EXCEEDS 30" <br />TO DRAIN WATER <br />V-4" <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILLr16 <br />SCALE: N.T.S. <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL r7 <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY w/ <br />(3) ROWS OF 16d NAILS <br />AT 24" O.C. <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF Z PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d AND J/S6 FOR MORE INFO. <br />NAILS TO LEDGER VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE: 1/2" = 1'-0" <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />SIMPSONLSTAI8 __________ N <br />w/ (12) 10d NAILS SIMPSON HUC410 w/ (14) - I SEE PLAN <br />CENTERED AT I I I I I 'FOR CANT. y: <br />I I 16d INTO HEADER & (6) y: <br />SPLIT TO TIE 10d INTO BEAM -SEE I I RUSS/ <br />BEAMS TOGETHER I 1 I I I OP WAL <br />I I ROOF PLAN FOR MORE <br />I INFO I EE PLAN <br />I I <br />SEE FLOOR PLAN FOR I I I ' Y2" CDX PLYWOOD OR %s" O.S.B. MIN. (2) 2x8 #2 SYP <br />I i COLUMN SIZE & BASE I I I 7/16" OSB FLITCH PLATE SHEATHING REQ'D FROM BOTTOM HEADER. SEE Q/S4 FOR <br />SEE FLOOR PLAN i CONNECTION INFO I I REQ'D ONLY WHEN OF WALL TO ROOF SHEATHING <br />I I ___ ___ REQ'D CONNECTIONS <br />FOR COLUMN SIZE L I I I INDICATED ON BM. ABOVE W/ 8d NAILS @ 4" O.C. IN <br />& ADDITIONAL INFO. 7/16" OSB FLITCH PLATE L J SEE FLOOR PLAN OR SCHEDULE/PLAN FIELD, EDGES & BOUNDARIES <br />REQ'D ONLY WHEN COLUMN SIZE & BASE 2x4 #2 SPF STUDS @ <br />OPTION A SCHEDULDE/ON PLANM OPTION B CONNECTION INFO OPTION C <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />COMMON BM TO POST ATTACHMENT TOP <br />EXTERIOR SHEATHING A <br />ATTACHED PER SEE ROOF PLAN <br />NAILING SCHEDULE FOR BEAM SIZE & <br />CONNECTION INFO. <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE: N.T.S. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />CORNER I I� SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />1 <br />SIMPSON (2) <br />HTS20 w/ (14) <br />10d NAILS <br />TYP. U.N.O. <br />MIDDLE <br />BM. SPLICE OVER <br />CENTER OF POST <br />SEE PLAN MAX. <br />24" STEPS - <br />SEE PLAN FOR OPT <br />2x4 #2 SYP P.T. PLATE W/ <br />V8" EPDXY ANCHOR OR <br />J-BOLT OR Y2" TITEN HD <br />ANCHOR @ 24" O.C. W/ <br />MIN. 6" EMBEDMENT <br />STAIR INFO. IF "< A j <br />CONCRETE STAIRS f <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />q <br />a ^.I <br />e a. e <br />a, <br />a II <br />a <br />. ' I a ° . a d'_ <br />GARAGE OR CN <br />,- A • .a 8 <br />LOWER SLAB <br />SEE PLAN <br />a <br />MAIN HOUSE <br />SLAB <br />(2) #5's CONT. T&B <br />W/ #3 STIRRUPS AT <br />4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />SECTION GARAGE MONO 21 <br />SCALE: N.T.S. <br />O o <br />N -o - <br />i�� W <br />o <br />ci a e� o <br />Z c lO w N <br />a <br />a O — <br />04 <br />y <br />y d C <br />m d <br />C, t C <br />d�_a <br />L <br />16 y C7 i7 <br />J = 67 <br />c o <br />ate• <br />y E .n <br />c <br />o <br />d <br />0 <br />e•,ay�3�1�€4€l4tE iiPtllf/A�if` <br />o W1y <br />As C<\ <br />'. • ELo <br />�, Q ''••.....••''NPR, �� <br />O F E S S 10 ,\\\ <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />0 <br />W d <br />O M E <br />v <br />C 00 N or0 <br />W U)cr� <br />Q y'(h V zszs LL <br />C _1 5 LL <br />0 Ju_� 55 W a- <br />-vim a 2 <br />Z t.cf0. <br />N O O <br />W co m <br />Z LO co <br />co Z a J <br />Z OU 00 <br />_ W ❑❑ <br />a) Z N M <br />z CD <br />z <br />J <br />N <br />cn <br />N z <br />CD .9 Cz <br />a)4--J V) '1 <br />Q) V � <br />w g <br />to c "' <br />�N <br />- CD <br />U <br />w <br />�— — E <br />= L <br />U 0 • <br />c C/) 440— <br />ffl. <br />9 <br />o< <br />w <br />Z <br />M G <br />LL_E <br />Z <br />s? p wo z® <br />E lJ a a <br />9 (0 g� 00 <br />U <br />z �aoz <br />d f6 ao wz <br />o m <br />cn < O � <br />z C NS ZzF <br />m N � '< W <br />S J F� <br />zo <br />W 8 o� T. <br />C> <br />m .� <br />aLL <br />�_ J z �I <br />� a 0 <br />¢ <br />zla <br />a 3 <br />2 C)= <br />0 <br />E <br />> Lt7 <br />0 rn <br />T <br />c� <br />i� O <br />co Lo <br />�\ T LO <br />Cr co 1� <br />2 N a 0 _ <br />m _ L0 <br />CO N <br />LO C)Ln <br />T Q LOCD <br />LO <br />T <br />M T_ o <br />f0 j O y Z <br />Z E N <br />E <br />„ :? C <br />a. 0 ¢ o <br />JOB NO: 23-06122 <br />SCALE: AS NOTED <br />SHEET NO. <br />D 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.