My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6259 Back Forty Loop
Zephyrhills
>
Building Department
>
Building Plans
>
6259 Back Forty Loop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 6:45:37 PM
Creation date
2/27/2025 11:20:11 AM
Metadata
Fields
Template:
Building Plans
Street #
6259
Location
Back Forty Loop
Contractor
Lennar Homes
Building Plans - Permit #
5969
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSULATION <br />BAFFLE <br />INSULATION PER — <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PI FCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />PRE ENGINEERED <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROOF <br />—SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />J w PLYWOOD SHEATHING <br />J <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />w <br />LU <br />16" O.C. 2X S.P.F. STUDS <br />o = <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />0 <br />718" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2) 1 Od @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 1Gd <br />= w <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />LL = <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA <_ 1000 <br />rBY R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALS <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />ER PLAN <br />0 <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & V 0/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />STD. 90 fiOOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />CM <br />U-LU <br />0 4"x4" INSPECTION PORT AT <br />= Q- EACH FILL CELL TYPICAL <br />uLI cn <br />1x WD FURRING @ 24" O.C. a o- AT GARAGE CONTRACTOR <br />BASEBOARD TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER NOTE: EXTEND DECO FINISH <br />MUNICIPALITY 411to 6" BELOW GRADE <br />c <br />E d .a• <br />Q FINISH GRADE 00 <br />r °d <br />M ' I-KPP, <br />I 1=1 11=1 I _I __ <br />IIII—III—III III _ _ _ _ co <br />6x6 w1.4xw1.4 =W=L=I I I I< a I I EEI 11—I I I —I I I- _ �- <br />WWF OR FIBERMESH I II I II II I I III I I IIIII I I I I I 1111'I III 11111- <br />ae <br />(3) # 5 REBAR ON 3" CHAIR — I ! „1I1„I 1-I 1—I 11——STD. 90 `HOOK <br />(SEE DETAIL) <br />W/3" MIN, CLEARANCE 4" 1'-8" <br />TYP 2-STORY WALL SECTION <br />SCALE:3/4"=1'-0" S6 <br />SIMPSON LSTA24 STRAP w/ (8) 1Od x 1 1/2" NAILS TO <br />ST.._ <br />2nd FL00 <br />BEAM/GIR <br />2ND FLOOR FRAME CONNECTION <br />SEE J/3-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD ftl / <br />2nd FLOOR WALL <br />BAND JOIST <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL <br />SIMPSON LSTA24 STRAP wl (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />'END SHEATHING TO <br />IF BEAM OR GIRDER <br />,TE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN • INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />0/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)1Odx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=T-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1"' ^ ^ <br />2"x BOT. PLATE <br />(2) 10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSEE <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W14-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 W/ (8) 1Odx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" <br />FOR ADDITIONAL INFORMATION, <br />RIBBONS <br />DETAIL FLOOR TRUSS o <br />SCALE: 1 1/2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SECTION C/S3 FOR <br />ADDITIONAL INFORMATION <br />(1) ROW OF 2x BLOCKING @ MID <br />HGT. FOR WALL HGT. 5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />PTS FOR WALL HGT. > 8'-6" <br />SIMPSON SP1 w/ (10) 10d <br />NAILS AT EA. STUD <br />2 x STUDS @ 16" O.C. <br />2X P.T. PLATE <br />SEE SHEATHING <br />SPECS ON FLOOR <br />-1/2" GYP. W.B. MIN. @ <br />GARAGE SIDE IF APPLICABLE <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ <br />2"DIA.X 3/16" PLATE WASHER <br />(MIN. SHEAR 3500#. MIN. <br />TYPICAL TENSION 2600#.) <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />a'. <br />CD <br />(3) #5 CONT. ON 3" <br />8 1 1'-8 ! 8 ` CLEARANCEMIN. <br />INTERIOR 2-STORY FRAME SECTION rS <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />/� (2)- 2x TOP PLATE <br />.l BEYOND I <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />w <br />o SECTION X-X IF <br />� NOT F ILL <br />F HEIGHT SHEET- <br />o <br />) <br />CO <br />O <br />- <br />G` FLOOR SYST M <br />2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM 1AIA1 1 r; r\/ATI/lA1 n1AnnAAA <br />15/32" OSB <br />la-EXPOSUREI <br />F <br />F <br />SHEATHING w <br />x <br />SOLID 2x <br />C <br />BLOCKING @ ALL <br />G <br />SHEATHING <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />0 U <br />C <br />x <br />w <br />x <br />E <br />2x STUDS w <br />BEYOND. U) <br />SEE PLAN o <br />O <br />U) <br />3/8" "S" = NAIL <br />SPACING <br />S 3/4" <br />1/2" <br />SINGLE NAIL EDGE SPACING DOUI <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7116" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCKING <br />SECTION X-X <br />sFFA�po� <br />N <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />S <br />S <br />1/2" <br />" <br />1/2 <br />SPACING <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM)/8" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />o <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />-j <br />PENETRATE SURFACE MORE THAN X". <br />to <br />? <br />A� NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />C7 <br />@ NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />z <br />u. _ <br />C� NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMC <br />0 w <br />OD NAIL INTERIOR AT 6" O.G. w/ 8d COMMON NAIL. <br />c=n <br />@ STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />o <br />w/ 8d COMMON NAIL <br />J <br />LL F O <br />@PLYWOOD SPLICES @HEADER -NAIL SHEATHING TO HEADER <br />F <br />> ¢ F O U <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />IrFOOtn <br />W OF F m L'L <br />O (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />z N w p O~ <br />MEMBER IF GABLE END <br />NOTE: <br />8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 2 1/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />1 <br />(2) 2x HEADER SEE PLAN <br />S4 <br />INTERIOR HEADER: <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 10d x 1 1/2" EACH SIDE <br />2x STUDS TYP, <br />P.T. BOT. PLATE <br />ppxTFR7 FLOOR TRUSS / <br />FNiy� R BEAM <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "Y' BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />a. <br />T .III —III —III— I .. - <br />M <br />'d .. a. <br />III—III=III <br />a <br />I— <br />(3) # 5 REBAR ON 3" CHAIR 4 I I 1 _g <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4 <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />T4 <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16, <br />(3) <br />(3) <br />(2) <br />(3) <br />(2) LSTA30 <br />- PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />-2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />- APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS MAR 2 5 2023 <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 1Od NAILS <br />- AT EA. STUD <br />-2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />Virtual Review Assist, Inc. <br />00 Plans Review completed and appr d <br />FINISH GRADE for compliance with the 2020 FBC 7th Edition <br />00 <br />by Debra Anne Klahr PX2300 <br />I IIIII i I <br />W/Y MIN. CLEARANCE <br />ALTERNATE FOOTING V <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" 6 <br />ADDITIONAL INFORMATION. SS <br />i <br />N <br />N <br />0 <br />N <br />N <br />W <br />' <br />z <br />° <br />� + <br />= ° <br />�J <br />w <br />2 <br />y i <br />0 <br />Uj <br />z <br />Q <br />/L/) <br />> CD o <br />W <br />L = "o U <br />N Oi <br />`' JNor <br />to 7 <br />V 7C) <br />_ <br />A� -L C `m <br />W 0 U O <br />LM <br />p O <br />LL O O Q <br />i U�� <br />W <br />L 0O E <br />000 0 <br />0. <br />LLI <br />W <br />oLIJL ' wOI- <br />w~ Q J Z z <br />0 <br />Q U <br />QO--1 U)U-UO1J- <br />�OxQ z0 � —1°tea~ <br />= I— H <br />C� <br />ULU Uj—Z LU —Q Ix Q J <br />EL Z1 0Zzw0woo_ <br />Cl) 0 z <br /><1-- <br />eLLJ <br />UHF gwpMU°¢ <br />0x -0 = o¢ZU <br />,La 0 eau_ <br />O <br />O <br />z N <br />OLU <br />D ti <br />0 M O <br />2C�LL� <br />L`— cM <br />Z U <br />Wz� <br />W <br />� <br />O <br />CD <br />N <br />N <br />O <br />N <br />N <br />T <br />O <br />O <br />00 <br />(0 <br />00 <br />O <br />O <br />O <br />O <br />r <br />O <br />O <br />O <br />N <br />CD <br />N <br />C) <br />N <br />O <br />CV <br />O <br />CV <br />N <br />N <br />M <br />N <br />00 <br />O <br />,. LO <br />r <br />00 <br />O <br />M <br />CV <br />O <br />M <br />C)O <br />� <br />r <br />C)O <br />CA .:' <br />O <br />c- <br />O <br />' <br />0 <br />CO <br />0 <br />1 <br />NN <br />�i / <br />0 <br />> <br />0 <br />0 <br />0 <br />0 <br />--t <br />0 <br />CD <br />0 <br />N <br />Ch <br />L6 <br />(0 <br />I-� <br />0 <br />z z <br />O <br />oLU0 <br />C)W <br />L <br />O <br />V��a <br />0�W� <br />-0 <br />Q <br />z <br />Q <br />=co0Z <br />j J <br />N <br />z <br />w <br />> <br />Z <br />M <br />�ZZU- <br />w N <br />OJ<z <br />O <br />VU) <br />LU <br />CL z`� <br />z <br />?Q0 <br />.. <br />Z <br />U <br />U <br />a <br />00 <br />W <br />� <br />Q <br />z <br />S6O <br />z <br />z <br />w <br />J <br />W <br />N <br />N <br />0 <br />O <br />LAST PLOT DATE <br />Dec. 14, 22 <br />z <br />O <br />STRUCTURAL <br />— <br />I <br />DETAILS —MONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.