Laserfiche WebLink
ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOF TRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />6 SOFFIT DETAIL <br />pia _ 1 1-ni, <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOF TRUSS <br />MTL DRIP EDGE <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL S1701 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />17 SOFFIT DETAIL <br />pia _ _n <br />N <br />o <br />� P <br />fV N <br />CV <br />" <br />2" 2" <br />8 �FA�LS�EAM LOUVER DETAIL TYP <br />C COLUMN DETAIL <br />_--PROVIDE <br />FILLED SOLID <br />CMU ABOVE LINTEL TO <br />TIE BEAM <br />FLASHING <br />CASING BEAD WITH WEEP HOLES <br />PT 2X8 LEDGER ATTACHED TO <br />WALL W/ 3/8" X 5" TITEN HD AT <br />12" O.C. STAGGERED <br />(S) H 10A-2 <br />ROOF FINISH PER ELEVATION <br />UNDERLAYMENT <br />ELEV AT 8'-0" <br />12 <br />T.O.M. <br />5 <br />ROOF SHEATHING <br />(S)A23 <br />E---MTL <br />DRIP EDGE <br />2X4 SUB -FASCIA <br />•°> <br />2'-0" <br />ALUMINUM WRAP <br />��(S) A23 <br />ALUMINUM SOFFIT <br />_PT 2X4 LEDGER ATTACHED TO <br />WALL W/ 3/16" TAPCONS W/ <br />MIN 2-1/2" EMBEDMENT <br />6" O.C. <br />BTM AT 7'-6" <br />SOFFIT DETAIL <br />10 <br />11 <br />-*AA _1_n <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />STAGGERED <br />7L o 0 0 <br />I o I o I <br />� 8" � V-0" � V-0" <br />11 LEDGER DETAIL <br />pia _ _n <br />1'-0" I. 1'-0" <br />1'-0"- <br />4" STUCCO <br />BAND <br />6" STUCCO <br />BAND <br />WEEP <br />SCREED — <br />C7 <br />CD W <br />CV = <br />z_ <br />4" STUCCO <br />BAND <br />5/8" <br />STUCCO <br />OVER <br />MASONRY- <br />8 <br />A5 <br />7/8" <br />STUCCO <br />OVER <br />FRAME <br />4" SCORED <br />STUCCO ` I <br />BAND <br />- — - — - — - --- <br />CASING BEAD 5� <br />WITH WEEP <br />HOLES OVER <br />FLASHING <br />INININININININ11 <br />INININININININI <br />ININININININININI <br />iElmimilmimimiml <br />FRONT ELEVATION A <br />1 /411 = 1'-011 <br />A <br />12 b <br />A5 <br />ELEV AT 18'-0" <br />- - _ - - - - - - T.O.P. <br />O �-7/8" STUCCO 1'-0" <br />N = M OVER FRAME% ELEV AT 10'-0" <br />z 2ND FLOOR FF <br />- - - CONTROL JOINT - <br />ELEV AT 8'-8" <br />T.O.M. <br />A/C UNIT MID WALL <br />AND PAD WEEP SCREED <br />c4 5/8" STUCCO <br />® OVER <br />- - - MASONRY <br />ELEV <br />1ST FLOOR FF <br />GRADE LINE <br />3 REAR ELEVATION A <br />1 /8 — 1 -0 <br />SHINGLE <br />ROOF <br />A5 <br />2 <br />M <br />ti <br />A5 <br />ELEV AT 18'-0" <br />T.O.P. <br />CASING BEAD <br />WITH WEEP HOLES <br />OVER FLASHING <br />ELEV AT 10'-0" i <br />2ND FLOOR FF <br />ELEV AT 8'-8" <br />T.O.M. <br />� 9 <br />ELEV AT 0'-0" ilk <br />1ST FLOOR FF <br />MAR 2 ; mra <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />* EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />Virtual Review Assist, Inc. ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />Plans Review completed and ap ved CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />for compliance with the 2020 FBC 7th Editi 5nFOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />by Debra Anne Klahr PX2300 <br />6" <br />15'-9" <br />it <br />7'4' 6-11" <br />11 <br />le <br />12 6 0 <br />6" <br />A5 <br />o <br />N <br />m <br />— — — — — <br />— — — <br />— <br />— — — — — — — — <br />SLOPE <br />- - - - - - - - --- <br />ELEV AT 18'-0" <br />5:12 <br />- <br />- <br />- <br />- <br />T. 0. P. <br />16-8" <br />18'-8" 16'-8" <br />I w = M <br />iv 7/8" STUCCO <br />11-01, <br />0'-0" <br />ELEV AT 1T <br />SLOPE <br />Sz ~ OVER FRAME1 <br />CONTROL JOINT ` CONTROL JOINT <br />2ND FLOOR FF <br />5:12 <br />- - <br />- <br />ELEV AT 8'-8" <br />T.O.M. <br />1'-0" <br />%/8" STUCCO <br />OVER MID WALL <br />2'-0" A/C UNIT <br />MASONRY% WEEP SCREED `�° <br />® AND PAD <br />ELEV AT 0'-0" <br />17'-0" <br />RIDGE <br />1 ST FLOOR FF <br />VENT <br />� <br />GRADE LINE <br />SLOPE <br />�2 <br />SLOPE <br />5:12� <br />C <br />RIGHT ELEVATION A <br />4 <br />1/811- 1 1-011 <br />i <br />o <br />6 <br />iv <br />— — — — — <br />— — — — <br />— <br />— — <br />A5 <br />12 <br />5 <br />W <br />ELEV AT 18'-0" <br />� <br />- - - 13'-4" 12'-0" - - - - <br />- - - <br />T.O.P. <br />W NLOPE <br />SLOPE <br />�' <br />12'-0" <br />a - <br />5.12 5:12 <br />N <br />W <br />7/8" STUCCO <br />ELEV AT 10'4' <br />OJ Lo <br />z <br />F OVER FRAME <br />2ND FLOOR FF <br />RIDGE <br />cn <br />VENT <br />CONTROL JOINT <br />- <br />o <br />_� <br />- <br />ELEV AT 8'-8" <br />— — — <br />5 <br />- - <br />- - - - - - - <br />T.O.M. <br />APE <br />SLOPE <br />-0' <br />2'-0" <br />5:12 <br />5:12 <br />8'-1 5/8" <br />C° <br />A/C UNIT <br />AND PAD <br />2-0 <br />® <br />® <br />i� <br />r <br />� 5/8" STUCCO 1'-0" <br />OVER MID WALL <br />MASONRY % WEEP SCREED <br />1'_pii <br />ELEV AT 0'-0" <br />q <br />- <br />- <br />— — _� <br />— — — <br />, <br />J <br />SLOPE 6"_ <br />' <br />_ <br />5:12 <br />_ _ <br />_ _ _ <br />1ST FLOOR FF <br />3'-0" <br />16'-6" <br />3'-0" <br />GRADE LINE <br />5 LEFT ELEVATION A <br />1 /8 = 1 -0 <br />1 ROOF PLAN A-1 <br />1 /8 = 1 -011 <br />ROOF GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />HOOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />I f IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 6TH EDITION (2017) FBC, SECTION R806 <br />FORMULA = S.F. 1300 (1/300) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA 1 = 1268 SQ FT <br />VENTILATION REQUIRED = 609 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 306 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =1204 SQ IN <br />ATTIC AREA 2 = 466 SQ FT <br />VENTILATION REQUIRED = 224 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 126 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =399 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET (MEASURE <br />VERTICALLY) BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />" OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />"SOFFIT VENTS 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />LOMANCO DECK -AIR - 9 SQ, IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACEABILITY TO MANUFACTURER AND PRODUCT <br />N <br />N <br />O <br />N <br />� <br />v <br />T <br />N <br />r £g <br />r <br />Lo <br />o <br />Lo <br />T <br />B <br />-rN 6 0 <br />n <br />y <br />y <br />n <br />�< <br />V� <br />W <br />z <br />L^n`` N LO <br />CCD <br />W L 'D U <br />(y) <br />N � 0 <br />mom M <br />V m 11>1 <br />= o <br />} 2 Oo 2 0 <br />O LL <br />1 Q <br />s U <br />0_: <br />•^V`i f , LU QN c <br />W L 0O �CO <br />a ) <br />W <br />W 0 W <br />y <br />0 �j Uj W 0 H <br />Wes¢ �WQm�YZ� Z <br />��g,dOdW¢t�iUO�JO <br />Q U <br />Q I— <br /><u' XJZLLLL0zm0C1LL <br />( U)o,,�OZOE200mZZ U <br />o OLLILLI <br />U) Z <br />(Da�ZOZLL00CYZWo0a <br />W <br /><F-F¢ <br />lid 0 dtL <br />O <br />O <br />Z W <br />OF_ <br />D 5 ti <br />O <br />0 1_�- M <br />Q Co�S <br />J <br />U) L.L <br />_M <br />� a' � <br />M <br />Z V <br />�Wz <br />J0 <br />O <br />mi <br />IT <br />N <br />O <br />N <br />i <br />ti <br />N <br />0 <br />0 <br />06 <br />co <br />aD <br />o <br />0 <br />0 <br />0 <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />N <br />O <br />6 <br />00 <br />A <br />1 <br />O <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />N L <br />; <br />CD <br />o <br />N <br />c <br />M, <br />o <br />'It <br />0 <br />LO <br />0 <br />(fl <br />0 <br />ti <br />' n <br />V / <br />� <br />M <br />00 0 <br />Z <br />z O_ <br />oWC0 <br />Uo�o <br />rn <br />v� <br />W g <br />Lo � <br />ZW~a <br />X <br />Q <br />=co0Z <br />�z�w <br />w <br />Z Ix <br />M <br />ZzLL <br />QD <br />W N <br />Og2Z <br />0 <br />a <br />ULzz <br />Z <br />�QO <br />ry <br />Z <br />U <br />U <br />� <br />O O <br />of <br />Q <br />Z <br />Z <br />z <br />W <br />J <br />N <br />W <br />Q <br />0 <br />LAST PLOT DATE <br />Dec. 14, 22 <br />z 0 <br />EXTERIOR <br />® <br />ELEVATIONS A & <br />ROOF PLAN <br />