Laserfiche WebLink
SIMPSON HGAM1( <br />W/ <br />(4)1/4"xl 1/2"SDS <br />SCREWS <br />TO BLOCKING & <br />114")r2 3/4" <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSHI - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) <br />MAX. 9" <br />TOENAIL w/ UNSUPPORTED, <br />SEE STRUCTURAL NOTES AND NAILING <br />(2) 16d NAILS 7 IF >9" SEE 1 O/S6 <br />SCHEDULE FOR SHEATHING DETAIL-7 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />MAX. 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 10/S6 <br />BACKNAIL wl (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL _�\ <br />45*± <br />45*± <br />Z <br />45* <br />SEESTRUCTURAL <br />NOTES AND NAILINGV <br />2x4 CROI <br />BRACE <br />SCHEDULEFOR <br />APPROX. 8" FROM <br />SHEATHING DETAIL <br />KERN <br />2x4 KICKER <br />2x8 SYP#2 "L" BRACE TO <br />RIDGE FASTENED AT <br />@4,Kl <br />@ 8'_011 O/C. <br />8 _O�O/C <br />EXTEND AT LEAST 90% OF <br />EACHJOINTW/(3) 10d <br />"L" BRACE TO EXTEND <br />2x4CROSSBRACE <br />WEB LENGTH & NOTCH AT <br />& (2)10d TOE NAILS @ <br />AT LEAST 90% OF WEB <br />APPROX. 8" FROM <br />BOTTOM CHORD (SEE TABLE) <br />EA. END @ 48" O.C. <br />LENGTH (SEE TABLE) <br />RIDGE FASTENED AT <br />SIMPSON H2.5A w/ (10) 8d <br />2x8 P.T. <br />E TRUSS <br />EACH JOINT w/ (3) 1 Od & <br />FROM LEDGER TO <br />SILL <br />1/2" CDX PLYWOOD OR <br />(2)10d TOE NAILS @ EA. <br />BLOCKING <br />7/16" OSB SHEATHING <br />F <br />END <br />I IN" <br />ATTACHED W/ 10d <br />,NAILS <br />GYPSUM WALLBOARD <br />GABLE TRUSS <br />ly. <br />@ 6" O.C. EDGES <br />2"x4" PANEL BLOCKING @ 48"O.C. FOR THE FIRST <br />112" CDX PLYWOOD OR 7/16" <br />AND 12" O.C. FIELD <br />(4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM <br />OSB SHEATHING ATTACHED <br />l " @ T' O/C <br />OcIX3 <br />CORD ATTACHED W/ (2) 16d TOENAILS <br />w/ 10d NAILS @ 6" O.C. <br />THROUGH CHORD <br />2"x4" LEDGER (MATCH BOTTOM CHORD <br />EDGES AND 12" O.C. FIELD <br />INTO 2" 6" P T PLATE <br />SLOPE OF ADJACENT SCISSOR TRUSS) <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />DOUBLE TOP PLATE <br />2x4 CROSS BRACE APPROX. 8" <br />FROM RIDGE FASTENED AT <br />EACH JOINT w/ (3) 10d & (2) 10d <br />TOE NAILS @ EA. END <br />2x FRAME WALL (SEE WALL <br />SECTION FOR SIZE & SPACING) <br />,,-1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 10d NAILS @ 6' O.C. EDGES <br />- - - AND 12"O.C. FIELD <br />(2) 16d NAILS <br />x <br />. <br />. <br />_E <br />2x4"r ON TOP OF PANEL BLOCKING�l 2"x6" P.T. SILL 2x4 PANEL BLOCKING @ 48"O.C. FOR 2x BLOCKING <br />NOTCH "L" BRACE HERE <br />FASTEN WITH 10dx3" @ 4" O/C SPACED WEEP SCREED 1/2" x 8" "J" BOLT @ 48" O.0 THE FIRST (4) ROWS OF TRUSSES 2x4 "T"ON TOP OF PANEL <br />@ 48' O.C. INSTALLED PER MANUF. WEEPSCREED FROM EA. END TYP. TOP & BOTTOM BLOCKING, FASTEN WITH <br />MOISTURE BARRIER SIMPSON META12 w/ (7) 10dxl 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2) 16d TOENAILS 1 Odx3" <br />4" O/C <br />1/2"x 8""J" BOLT @ 32" O.C. MINIMUM 6" FROM <br />O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - <br />MOISTURE BARRIER <br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER <br />SIMPSON META12 w/ (7) <br />ALTERNATE SIMPSON MSTAM24 wl (7) 1 Od NAILS <br />NOTE: IF EMBEDDED <br />10dxl 1/2" NAILS AT EA. <br />& (4) 1/4"x2 1/4"TITEN @ 4'-O"O/C ALIGNED WITH <br />STRAP MISSED VERTICAL <br />SECTION <br />TRUSS VERTICAL WEB (24,, <br />GABLE WEB SECTION r2 <br />WEB, USE MSTAM36 wl (7) <br />O.C. MAX) w/ MIN. 4" <br />10d NAILS & (4) 1/4"X2 1/4- <br />SCALE: N.T.S. <br />EMBEDMENT IN KO BLOCK <br />SCALE: N.T.S. <br />1_1�1� <br />TITEN ON OUTSIDE _j <br />I <br />2x4 #2 SYP BLK'G @ 16" O.C. wl (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSHI - ON FRAMING SHEET FOR SHEATHING <br />-REFER TO DETAIL J <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />ON SHEET S5 FOR <br />X-BRACING, AND TOP <br />SEE STRUCTURAL— <br />CHORD BLOCKING <br />cq <br />;0 <br />;0 <br />NOTES AND NAILING <br />x <br />INFORMATION <br />SCHEDULEFOR <br />_111 <br />S � <br />SHEATHING DETAIL <br />BACKNAIL WI-J <br />2 <br />(2) 16d NAILS <br />-WOOD TRUSSES <br />60 <br />;0 <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />-2x4 RAT RUN BRACING <br />RIDGE FASTENED AT <br />AT 24" O.C. ON TOP OF <br />EACH JOINT w/ (3) <br />It <br />BOTT. CHORD FOR 4 <br />10d & (2) 10d TOE <br />TRUSS SPANS <br />NAILS @ EA. END <br />ATTACHED W/ 2 - 16d <br />AT EA. TRUSS JOINT <br />(2) 2"x 4" LAMINATIONS W1 (1) ROW <br />(3) 2"x 4" LAMINATIONS W/ (1) ROW (3) 2" x 6" LAMINATIONS W/ (2) ROWS OF <br />2x4 PANEL BLOCKING <br />OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS <br />@ 48" O/C FOR THE <br />(2) 16d NAILS <br />2x4 BLOCKING @ 24" <br />(D = 0.148", L = 3") OR EQUAL <br />(D = 0.207", L = 4 1/2") OR EQUAL (D = 0.207", L = 4 1/2") OR EQUAL <br />FIRST (4) ROWS OF <br />O/C w/ (2) 16d <br />TRUSSES FROM EA. <br />TOENAILS @ EA. END <br />NOTES: <br />END TYP. TOP & <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 5 1/2" LAG SCREWS OR EQUAL <br />BOTTOM ATTACHED <br />MASONRY WALL <br />OF THE COLUMN <br />(SPACE AS SHOWN FOR 3-PLY) <br />w/ (2) 16d TOENAILS <br />- - - - <br />-ARCHITECTURAL FINISH <br />2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />OF THE LAST LAMINATION <br />(SPACE AS SHOWN FOR 3-PLY) <br />2x4'7" ON TOP OF PANIE-1 <br />BLOCKING, FASTEN WITH <br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2) 16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION <br />EXT. WALL CONN. 10dx3" @ 4" O/C <br />NON - LOAD BEARI COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF <br />PG LOCATION rD B.U.C., SAME NUMBER OF ROWS, SAME SPACING) <br />SECTION <br />SEE TYP. WALL SECTION FOR SCALE: 3/4' 1 �4' , �5 TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS r8 SCALE: N.T.S. <br />ADDITIONAL INFORMATION. SCALE: N.T.S. <br />S5 <br />IINIMUM 2x <br />'ROSS BRACING <br />SEE PLAN FOR <br />OCATIONS) TOENAIL 1 <br />(2) 16d NA <br />(2) 16d PER <br />JOINT <br />2"x4" MIN. SEE M/S5 <br />CROSS BRACING DETAIL <br />SCALE: N.T.S. <br />S5 <br />12" <br />2H SCHEDULE <br />krTACHMENT <br />2 SYP BLK'G @ 16" O.C. <br />J x 0.131" <br />AILS EA. SIDE <br />. 2x4 #2 SYP w/ 1 Od <br />XO.131- @ 8" O.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL <br />SCALE: N.T.S. <br />�, �5 <br />GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0"- SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES <br />-MINIMUM (2) 16d PER JOINT \-MINIMUM 2x4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL <br />SCALE: N.T.S. <br />6" OVERLAP <br />M <br />S5 <br />-L" BRACE W/ 1 Od @ 4- O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />-2x4 LEDGER (MATCH BOTTOM CHORD <br />SLOPE OF ADJACENT TRUSS) <br />r3 <br />SECTION <br />SCALE: N.T.S. <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />1" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLETRUSS <br />-1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />W/ 1 Od NAILS @ 6" O.C. <br />E - SAND 12" O.C. FIELD <br />104�]JACK TRUSS <br />SEE PLAN FOR <br />C(ONNECTION <br />(2) 12d TOENAILS <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSHI - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND <br />NAILING SCHEDULE FOR SHEATHING <br />DETAIL <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />EACH JOINT w/ (3) <br />10d & (2) 10d TOE <br />NAILS @ EA. END <br />2x4 PANEL BLOCKING <br />@ 48" O/C FOR THE <br />FIRST (4) ROWS OF <br />TRUSSES FROM EA. <br />END TYP. TOP & <br />BOTTOM ATTACHED <br />W/ (2) 16d TOENAILS <br />(2) 16d <br />NAILS - <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1 O/S6 <br />*L" BRACE TO EXTEND <br />AT LEAST 90% OF WEB <br />LENGTH (SEE TABLE) <br />-GABLE TRUSS <br />-1/2" CDX PLYWOOD OR <br />7/16"OSB SHEATHING <br />ATTACHED w/ 1 Od NAILS <br />@ 6' O.C. EDGES AND 12" <br />O.C. FIELD <br />-2x4'T'ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />1 Odx3" @ 4" OIC <br />SIMPSON HGAl OKT w/ (4) 1/4"xl 1/2" SDS SCREWS TO <br />TRUSS & (4) 1/4"x3' SIDS SCREWS TO PLATES AT 24" O.C. <br />DBL. TOP PLATE SIMPSON SP2 w/ (12) 1 Od <br />NAILS AT EACH STUD <br />STUD WALL (SEE TYP. SEC.) <br />SECTION <br />SCALE: N.T.S. <br />8d @ 6"O/C <br />WOOD TRUSSES <br />SIMPSON HGAM1 OKTA w/ (4) <br />1/4"xl 1/2" SDS SCREWS TO <br />BLOCKING & (4) 1/4"x2 3/4' <br />TITEN TO CMU <br />EXT. WALL CONN. @ NON LOAD <br />BEARING LOCATION (UNEVEN CLG.) <br />SEE TYP. WALL SECTION FOR SCALE: N.T.S. rE <br />5 <br />ADDITIONAL INFORMATION. �'S <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U.N.O.) <br />"L" BRACE <br />2"x6" (U.N.O.) <br />"L" BRACE <br />24" <br />0'0" - T-O" <br />T-O" - 6'-0' <br />6'-0"& GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 10dx3" NAILS @ 4" O/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGA10KTw/(4)1/4"xl 1/2"SDS <br />SCREWS TO TRUSS & (4) 1/4"x3"SDS SCREWS <br />TO PLATES (TYP.) <br />L—CONT. BEARING <br />GABLE END BRACING DETAIL SCALE: 3/4"=V-0" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SIMPSON SP2 w/ (12) <br />1 Od NAILS AT EACH <br />STUD <br />HIP FRAMING REFERENCE PLAN <br />2x4 BLOCKING-,,,"" --2x4"r'BLOCKING <br />@ 48" O.C. 16d NAIL <br />CE <br />"L" BRA <br />ATTACHED W/ <br />1 Od NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE 1" BRACING DETAIL <br />SCALE: N.T.S. S5 <br />W <br />j) 4� <br />x4"T"BLOCKN <br />x <br />48" O.C. 16d NAIL <br />"L" BRACE ATTACHED - <br />W/ 1 Od NAILS @ 4" 0. <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL�-_6 <br />SCALE: N.T.S. \,,,S5 <br />DIAPHRAGM <br />-4 <br />BLOCKING <br />. O/C @ <br />48' <br />IT54 ;,--GABLE TRUSS <br />TRUSS VERTICAL <br />(2) 2"x8" 'L" BRACE <br />FASTENED WITH (3) <br />16d PER SIDE <br />SCISSOR GABLE "T" BRACE /"'-7 <br />AS PER HIB 91 SCALE: N.T.S. <br />\1�1� <br />20'-0" MAX 20'-0" MAX <br />-X' BRACE SEE DET. J/S5 CONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />Ll <br />p- <br />m <br />1116 <br />2 x 4 BLOCKING w/ (2) 1 Od <br />24- O/C (TYP) <br />TOE NAILS AT EACH END @ <br />z <br />w <br />a: <br />\-BRACING w/ (3) 1 Od x 3" AT <br />EACH CONN. @ 24' O/C <br />MOISTURE BARRIER <br />-BOND BEAM <br />MASONRY WALL <br />ARCHITECTURAL FINISH NOTE: ZTOP CHORD 2x4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING @ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING BAYS <br />THAT MY BE REQUIRED /BOTTOM CHORD GABLE END BRACING <br />2) "T' BRACING MAY BE USED IN PLACE OF PERMANENT @ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN L <br />AS PER BCSI SCALE: N.T.S. c- r- <br />SCISSOR TRUSS <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />SCISSOR TRUSS <br />W/ DROP CEILING BRACING DETAIL <br />MEAN ROOF HEIGHT UP TO 30'-0" SCALE:NTS <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SEP 0 8 2022 <br />'E S-"7 <br />VIRTU,�L Rz <br />, . S, ' -, , <br />e: f IASI., <br />a ;rove( <br />Plar�s ic' a <br />F 7tt <br />for ClCrI "� k '�;L; . , <br />Edition by Debfa "',,-�hr PX2300 <br />2X4LEDGER <br />---SIMPSON LSTA18 <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0"- SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />@ 16- O.C. <br />0 Fk <br />� �e"l <br />04 <br />04 <br />04 <br />A Ir <br />% <br />co, 'Do, 'Y <br />to <br />0 <br />00 <br />LO <br />AR60', <br />< <br />w <br />o P, "S.'f <br />0 <br />z <br />< <br />(D LO <br />> 0" 0 <br />Lm 140 '1 <br />>1 CO C4 <br />-+-- <br />C) C-5 c) <br />U -0 C-) <br />c: <br />4) E -c- 12) <br />0 u <br />75 M: 8 R < <br />r* <br />c) < <br />ul- <br />ci <br />Lu 0_!;� <br />u CC) co <br />C�o �To <br />CL <br />w w <br />(6 w 0 <br />W W _j w 0 <br />F- < W w zw <br />w 2 � w< <br />z <br />W 0 <br />w <br />0 <br />w On 410 3: w U) U- 0 0 <br /><05<--lom 0 moll�-�P: <br />za'u)0,90zu'-0Fxz00m-0zz <br />'0 _j 0 <br />0 <br />Cy <br />0 <br />W w V5 w Fn W_ <br />Lu W <br />(9 (L > Z y a F- Z LL <br />0 <br />0 _j <br />a. <br />U) 0 <br />Z <br />_j < ow_) <br />_,<<Ow _Zwz,,,( <br />< I- �_,n <br />0 CL <br />< <br />LL <br />0 Lu w <br />0 W <br />0 <br />U- U- <br />C) <br />C) <br />N <br />Z LLJ <br />0 <br />U5 5 r'. <br />> p <br />CD 0 <br />m a <br />U) CV) I"- <br />u� <br />C/) _j <br />'it <br />C,) LL. <br />r�_ <br />z <br />< Lu <If LO <br />w CL cyi <br />< <br />00 <br />z <br />z <br />w <br />w <br />_j 0 <br />. . <br />. <br />qr� <br />CD <br />CV <br />0 <br />CN. <br />Cl <br />cq <br />C14 <br />C) <br />Q <br />C) <br />_N <br />C) <br />Q <br />C> <br />!�! <br />rl- <br />!R <br />C-4 <br />04 <br />2 <br />C) <br />Q <br />00 <br />C> <br />z <br />0 <br />Lo <br />Lnu <br />CD <br />CD <br />C) <br />c� <br />c4i <br />4 <br />cr <br />0c) <br />U) <br />>_ <br />Z <br />C) <br />-6-1 <br />Lu <br />�u) <br />zz <br />000 <br />0 <br />0 <br />00Fn <br />-0 <br />pz> <br />LO <br />-0 <br />0 <br />0 LLI <br />0 <br />Z <br />w z?. 2 <br />w—< <br />uj <br />0-'0 <br />zr)m <br />w <br />C\j <br />0 <br />Zafo <br />0 <br />:5 LLJ Ix <br />Z LL <br />z <br />Z <br />z <br />0 <br />< <br />0 <br />0 <br />z <br />< <br />z <br />z <br />uj <br />ui <br />C) <br />> <br />T_ <br />LAST PLOT DATE <br />Z <br />0 <br />STRUCTURAL <br />.j <br />DETAILS <br />