Laserfiche WebLink
METAL !LATH <br />WALL .SHEATHING <br />I 11 <br />I II <br />Ll <br />t <br />I I�-•��. <br />I. <br />�1) I I <br />160A3. V,2" LONG (34!-1' CROWN) <br />STAPLES � 6"' O.C, w'1ERT BETIA/EE (af1 <br />i w <br />l l 1 I <br />1SGaAx1-1iZ" L0NG 13 4'fi"1fi <br />S °LDS (NOTED 1-1Lt .,...i =OFFSET <br />CROWN G T a�Pi S � 66" <br />fERT <br />STAPLES IEETINEiEIN STUNS AS SHOWN <br />.. <br />IN70 STUDS <br />f NOTED THUS,. - <br />ETAL <br />II C E T <br />T L <br />RED'. 013 24L1 <br />SCALE: 304" - 1'. „ <br />"DETAIL FzACEEDS THE <br />REQUIREMENTS FOR FSOR 703,71 LATH' <br />"ONLY APPLIES TO LENNAR TPA[.aA -* <br />LATHING ACCESSORIES: <br />ATTACHMENTS SHALL BE OF CORROSION -RESISTANT MATERIALS. <br />WOOD APPLICATION: 16 GA. x 1-1/2" LONG (3/4"-1" CROWN) STAPLES @ 6" O.C. <br />VERTICALLY/HORIZONTALLY INTO FRAMING MEMBERS. <br />MASONRY APPLICATION: CONCRETE STUB NAIL, 3/8" (10 MM) HEAD DIA. MIN. @ <br />6" O.C. VERTICALLY/HORIZONTALLY OR COMPATIBLE ADHESIVES, EXTERIOR <br />GUN -GRADE, CONSTRUCTION ADHESIVE WITH 1" DABS @ 6" O.C. OR IN A <br />SEMI -CONTINUOUS BEAD BETWEEN THE SOLID PLASTER BASE AND THE SOLID <br />PORTION OF THE KEY ATTACHMENT FLANGE. <br />CONTROL JOINTS: INSTALL CONTROL JOINT LATHING ACCESSORIES IN <br />CONFORMANCE WITH C1063. LATH SHALL NOT BE CONTINUOUS THROUGH <br />CONTROL JOINTS, BUT SHALL BE STOPPED AND TIED AT EACH SIDE. <br />ALL ACCESSORIES SHALL BE IN ACCORDANCE WITH THE LATEST ASTM C1063 & <br />ASTM C 1861. <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />5'-0" <br />STUB -OUT FOR ' <br />GAS METER O <br />0 <br />N <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />7-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16-5" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />F-6" <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2) 16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />15'-4" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />01,1 <br />15/32" CDX <br />QPLYWOOD <br />OR <br />O <br />7/16" OSB <br />+ + X <br />+ <br />RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE <br />140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS <br />8d RING SHANK NAILS @ 6" O.C. EDGES & <br />8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />+ + 0.113 INCH NOMINAL SHANK DIAMETER <br />0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH <br />16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH <br />2-3/8 INCH NAIL LENGTH <br />NOTE: * FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ <br />+ + <br />+ + <br />+ + + + + + <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />4'-0" <br />tt <br />4'-0" <br />Zd++ <br />+ + <br />++++ <br />+++ <br />++ <br />+++ <br />+++++++++ <br />+ <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />3/4" <br />5000s 1.8/1.7 <br />p nel <br />wood panels <br />Two 3/4" wood panels or 2 x <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2x — + 5/8" or 3/4" wood panel <br />902.0 <br />2x _ lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />r <br />Filler blocking <br />1/8" gap ° x <br />FILL CELLS STD. 900 HOOK BOND BEAM <br />U) <br />W <br />.. <br />............ .. ..... .... ...... <br />Q STD. 90° <br />]� <br />CONT. #5 <br />CONT. #5 HOOK <br />BAR <br />BAR <br />OOC <br />.. <br />....... .... <br />45 CONT. <br />FROM <br />ETOUHIGHESOT <br />BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />SEE PLAN FOR REQ'D <br />PLYWOOD FLOOR <br />COLUMN AND <br />SHEATHING PER PLAN <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @ INT. BRG. WALL <br />N.T.S. <br />1/8" min. Small 2" min. <br />2" ) gap <br />max. � 4 max. <br />Clinch na <br />when <br />possible <br />ils <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4) Place joists together and nail from each side with 2 rows of 1 Od nails 2x4/Plywood/OSB web stiffener 2" min. <br />required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING t/$' GAP @TOP sides by 6". - Hangers with sides not containing t. WEB STIFFENER <br />DOUBLE JOIST CONNECTION top flangeuthcuts. <br />- Birdsmouth cuts. N.T.S. <br />- Under 2nd floor coil imn w/ marls <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />code for appropriate <br />1/16 <br />details in <br />One 10d box <br />areas=20 of high <br />or--20 sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block / <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam O <br />NO HOLES (EXCEPT <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES —� <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />I NP 3" 110d1 nails at 6" n c_ <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below. <br />'-�, Provide adequate bearing <br />for each lapped joist. Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />Od nails require additional consideration. <br />SECTION @ INT. BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />o <br />CD <br />6 A 1 z" ROUND HOLE MAY 6,6a DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1Y" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1�" <br />Round Hole Diameter (if) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />B <br />&875 <br />10 <br />111 <br />1z <br />13. <br />tR otan2ular Hole Side (In) <br />2 <br />3 <br />5 <br />6 <br />8 <br />i 0 <br />Any 16°" joist <br />Span (11) <br />3 <br />12 <br />1,-0., <br />1" 0"' <br />1 <br />1 1'" <br />1 -2" <br />V-2W <br />1" `�° <br />1'_3`. <br />V-3", <br />1 - " <br />1 -g"" <br />1 7 <br />2 <br />14 <br />2!-! 1"' <br />., <br />�. �," <br />" <br />4-�"' <br />4' � <br />.1. <br />5 <br />16 <br />1-D"' <br />1'_1" <br />1.2` <br />1-2, <br />.E 7. <br />T-5- <br />T-21" <br />3-10"° <br />"'-9" <br />-T' <br />64" <br />7`-2- <br />20 <br />1'-0"' <br />1'-1 " <br />1'-2"° <br />1'-?" <br />2'-0 <br />3" <br />D,< <br />4 1 .< <br />° 1 1 ", <br />6' 1 1'" <br />7"-1 1. <br />8`-11=" <br />4 <br />--0" <br />1 1" <br />1.-aa <br />1, 3,r <br />f-5", <br />3'-7' <br />y- <br />,^' 10` <br />7a-2," <br />Sa-, Rd <br />_i, <br />1 . <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1%" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE %" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series Depth End Intermediate <br />0 <br />BCI5000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />BCI6000s® <br />BCI6500sw <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90s® <br />11-7/8" <br />3-16d <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPS( <br />w/ (22) <br />NAILS 1 <br />5/8" 0 <br />THRU <br />BOLT <br />SIMPS( <br />w/ (22) <br />NAILS 1 <br />R TRUSS <br />'OP PLATE <br />I.0 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULEFOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing HETAL20 INSTALLATION <br />Joist <br />When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S <br />Backer block (12" wic:j min.) <br />Nail with 10-1 Od nails. <br />\Install tight to_top flange. <br />Jc <br />\ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4"-2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4%2" gap at top of bottom 1/4"-2" gap at bottom of top <br />flange. flange. <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />depth <br />-JOISTS BUCKETS <br />N.T.S. <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />o LOCATION OF <br />SECOND H10A <br />03 <br />SIMPSON H10A (WHEN <br />w/ (18) 10d x 1 1/2" ° REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE PVC OR SCH40 SLEEVE <br />A/C CHASE 4" PVC PENETRATION <br />SLEEVE THRU STEM <br />WALL d <br />I U, 9 <br />=1 1-1 11-1 1=1 1=1 d d. I I• a": I-i 1=1 1=1 I I-1 I I <br />A. d I —I I I —I 11- 1 <br />41 ° e � ''I ;III= �. .• i i' . —III,; <br />1=1 i 1=1 11=1 1=1 I I(=I FINI GRADEI- <br />I I —I 11—I I I —I 11—I I I— <br />—III—III-1 11=1 I I —III III—M1111 <br />III—I I —I I —I I —I 1-1 <br />11=1 11=1 11=1 11=1 11= 11=1 I I I=1 I I —III III —III —III V � <br />SLEEVE THRU STEM—/ ° <br />SEE PLAN FOR--'°• a . • • ° <br />FOUNDATION INFO ° d <br />STEM FOUNDATION <br />GRADE <br />REINF. SEE PLAN <br />rv%, �,nrxx,+ rv%, <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />Illy L----� <br />SEE FND. PLN. <br />SIZE & REINF. <br />BELOW <br />GRADE PIPE VERTICAL THRU FND. <br />G <br />PVC OR SCH40 SLEEVE <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />a d d <br />- ° d <br />------------- - - - - - - - - <br />- <br />d <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />° ° .d <br />------� . a --.-- — °°. c�" na <br />,III—;1I1=1I1=1I `� :` a ,a I1=1I1=1I <br />I F <br />-1I1=1I1=1 a <br />d. a �i �I l l <br />.�� <br />------ <br />SEE FND. PLN. <br />SIZE & REINF. <br />OCT 2 0 2022 <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />N <br />N <br />O <br />N <br />- <br />F <br />LO <br />�'' <br />m� � o <br />00 <br />LO <br />C " <br />e <br />Q <br />za <br />y� <br />iA <br />W <br />O <br />� <br />z <br />9 <br />Q <br />^N �O^ o <br />04 <br />N V -6- 2 MI),w. <br />E .E o om <br />W � O u o0 <br />_ <br />rnrn <br />VJ O o m Q <br />t U <br />*N UJ QC' <br />N. L o Eco P) <br />t� O @ <br />W <br />0 <br />W <br />❑ LLI Uj <br />WI— o!2� <br />0— 0� <br />w <br />O 0 <br />W�Yzc� z <br />it< LL V 0 0w J O <br />Q <br />(i <br />Q <br />Qa <br />00O <br />DnO<OLpEoomoF <br />JOa�Z <br />z <br />ZzLL0'QO CL <br />(n 0 <br />z <br />¢�WOg��-gwo2 <br />o- <br />0� <br />w4 O <br />E2z<Q <br />i-au <br />0 <br />0 <br />c <br />Z V <br />0� <br />U)Zti <br />[] � (D <br />Q U) CM Lf� <br />GNt <br />(J) L L ti <br />W Lq <br />I—olf0-C') <br />Wo-2ET_ <br />QD <br />Z U <br />Z 3z <br />W <br />JQ <br />0 <br />N <br />N <br />O <br />N <br />ti <br />N <br />0 <br />O <br />06 <br />cm <br />CO <br />o <br />N <br />O <br />N <br />O <br />N <br />r- <br />(N <br />N <br />O <br />C:) <br />N <br />C) <br />N <br />C) <br />N <br />C:) <br />N <br />C:) <br />(14 <br />C) <br />N <br />CD <br />N <br />6 <br />L6 <br />o0 <br />A <br />1 <br />N <br />O <br />N <br />t <br />0 <br />O <br />0 <br />0')O <br />0 <br />O <br />0 <br />G� <br />0 <br />t� <br />s= <br />N <br />Lo <br />W <br />> <br />C) <br />C) <br />N <br />C) <br />C+) <br />C) <br />4 <br />C:) <br />6 <br />C:) <br />O <br />C)V, <br />ti <br />i <br />u) <br />Z z <br />O <br />O <br />_ <br />� <br />WU <br />0 UJ U) <br />W <br />~ <br />0 <br />Uo5o <br />JV <br />O=W <br />HZcl�F <br />Zm0 <br />oOtzW <br />1­Q� z <br />IN <br />z <br />11�}�� <br />}.�z� <br />-ZZLL. <br />CV <br />LLI IN <br />O <br />< z <br />U°->_W <br />r <br />z <br />QO <br />z <br />-se <br />U <br />J <br />0 <br />_o <br />W <br />IY <br />Q <br />z <br />z <br />W <br />J <br />UJ <br />N <br />N <br />0 <br />LAST PLOT <br />DATE <br />Jul. 21, 2 <br />z <br />O <br />STRUCTURAL <br />— <br />_I <br />DETAILS <br />