Laserfiche WebLink
I I. L1_I' I I Igl1 a "j, II' I II'I <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />12 PRE ENGINEERED <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROOF <br />ISHINGLE ROOF <br />NSULATIO <br />BAFFLE 15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING 2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C SEE SOFFIT SHEET <br />CEILING & 8" 0/C WALLS I �- ATTACHED WALL SHEATHING TO <br />1/2" GYP WB (2) TOP PLATE W/ 8d @ 4" <br />DOUBLE 2x S.P.F. TOP PLATE O.C., 2 ROWS <br />—1x2 NAILER <br />w PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT FOR MORE INFO <br />w <br />16" O.C. 2X S.P.F. STUDS o = <br />W/ (4) 16d TOENAILS TO TOP PLATE O `o 7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2) 1 Od @ 6" O.C. METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />J F- <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d Z) w LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD LL = INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C lu, <br />rBARRIER <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEAL E <br />SPACE INTO APPROX. EQUAL AREAS. Dz <br />FLOOR SYSTEM <br />ER PLAN O <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS STD. 901100K (SEE DETAIL) <br />1/2" GYP WB 8"x8"X16" CONC. KNOCKOUT <br />INSTALLATION PER BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />Cl) <br />v 4"x4" INSPECTION PORT AT <br />W a EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. o_ a AT GARAGE CONTRACTOR <br />BASEBOARD M TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER NOTE: EXTEND DECO FINISH <br />MUNICIPALITY 411to 6" BELOW GRADE <br />C ^ . -'a d ` ' FINISH GRADE 00 <br />4 <br />M --xm <br />II—I I I III _ _OP <br />6x6 w1.4xw1.4 II=I I—.. I I=1 I I I °' - o III —I � _I I I —I I- _ <br />WWF OR FIBERMESH I. II I II I r I IP�EI I II I I I II I ° I I II I II I �I I I[EEI I V r <br />II .III III III a. III—III— <br />(3) # 5 REBAR ON 3"CHAIR -I I i t I I " I IT I �I 11� \--STD. 90'HOOK <br />— (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" V-8" <br />TYP 2-STORY WALL SECTION i <br />SCALE:3/4"=V-0" S6 <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD A / <br />2nd FLOOR WALL------ <br />BAND JOIST I� <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL — <br />SIMPSON LSTA24 STRAP w/ (8) 1Od x 1 1/2 <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1 ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />'END SHEATHING TO <br />)F BEAM OR GIRDER <br />ITE W/ <br />' O.C. <br />10R TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. �S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING <br />ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />—FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS <br />SEE FRAMING WEEP SCREED <br />PLAN • INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8)1Odxl 112" <br />O/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1"" ^ <br />2"x BOT. PLATE <br />(2) 10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS: <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 1Odx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />FLOOR CONNECTION B <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=1'-0" �"S6 <br />FOR ADDITIONAL INFORMATION. <br />TRU <br />RIBBONS <br />DETAIL FLOOR TRUSS) 0 <br />SCALE: 1 1/2"=1'-0" "6,,-) <br />NOTE: SEE TYPICAL WALL SEE SHEATHING <br />SECTION C/S3 FOR SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT.15 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd 5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10) 10d 2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD (MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. TYPICAL TENSION 2600#.) <br />2X P.T. PLATE 6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />.- c �a.° °°. - <br />. I <br />I —III =..° °. I —I I I—III7 <br />—III III— I —III <br />F <br />T,I l l l l i l l 11=111 111111111 (3) #5 CONT. ON 3" <br />8" 1'-8" 811 CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rs <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=1'-O" <br />ADDITIONAL SLAB INFORMATION. <br />W <br />W <br />x <br />a <br />O <br />co <br />,--rB). <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />x <br />X <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />D <br />o SECTION X-X IF <br />W NOT FULL <br />F HEIGHT SHEET <br />C <br />z <br />z <br />G <br />FLOOR <br />SYST M <br />(2)- 2x TOP PLATE <br />I �C BEYOND I <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING W <br />x <br />SOLID 2x rn <br />C <br />BLOCKING @ ALL <br />C <br />SHEATHING 0� <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />w <br />a0 <br />C <br />x <br />� w <br />X <br />E <br />W <br />2x STUDS <br />BEYOND. X <br />SEE PLAN o <br />O <br />\-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />3/8" "S" = NAIL 318" <br />SPACING <br />1/2" <br />S 1/2„ <br />S 1/2" <br />GLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2)12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCKING <br />SECTION X-X <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM Y" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />w <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THANy". <br />H <br />z <br />(Z) NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />0 <br />@ NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />z <br />LL = <br />© NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMI <br />O w <br />OD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />ai <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />o <br />w/ 8d COMMON NAIL <br />J <br />w - 0 <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />L LL ¢ r O rn <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />¢ crFOOv) <br />0U)M-,=) <br />¢ <br />z <br />© (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />LL <br />cv W O <br />MEMBER IF GABLE END <br />'� LL <br />NOTE: <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />L <br />AILS FOR WALL SHEATHING MUST BE MIN.131" X 21/2" <br />NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />FACE MORE THAN 1/8". <br />Tom/ <br />SFF'O<gNl'L <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" 0/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2x CRIPPLES @ <br />2"x10" OR GREATER HEADER <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />1 <br />(2) 2x HEADER SEE PLAN <br />S4 <br />NAILS @ <br />INTERIOR HEADER: <br />81, O/C TYP. <br />8" <br />BOX HEADER (1) 2x SILL PLATE W/ (2) <br />ONLY 12d TOENAILS <br />DOUBLE 2x <br />• EXTERIOR HEADERS: <br />CRIPPLE STUD <br />(1) 2x SILL PLATE W/ (2) <br />TYPICAL (U.N.O.) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1 Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />oxT ?/ FLOOR TRUSS / <br />FNi,,,_OR �RFAM <br />SEE PLAN FOR REQUIRED' <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3116" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />E ° <br />M <br />a- Q' <br />-I IIIIII�IIIIIIIII ,. . <br />�a <br />III III-111=I <br />(3) # 5 REBAR ON 3" CHAIR 4" 1'-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />1'-4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />T-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3) <br />1 (2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" 0/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 118" THICK. <br />SIMPSON SP1 W/ (10) 1 Od NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />00 <br />FINISH GRADE <br />171777 <br />-I CO <br />o z <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-O" <br />ADDITIONAL INFORMATION. <br />OCT 2 8 2022 <br />Virtual Review Assist, Inc. <br />Plans Review completed and appro <br />for compliance with the 2620 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />y <br />N <br />N <br />O <br />N <br />C) <br />co <br />LO <br />D 5 tar <br />z <br />w <br />pv3 <br />1scJ <br />O <br />LU <br />a <br />E <br />(I1 L = � O <br />Q Co� <br />V) V Q v m <br />AA,, '� t o <br />W 0 U o <br />OLLC' �Q <br />r U�� <br />} <br />•V�`% j W D_ rn <br />cCO) <br />E� <br />70 }VLF� <br />V V 0�0 0 <br />w <br />oL U) wol- <br />w�Q 0 22 xgYOZof Z <br />Q(Jx-j <br />Q <br />Q E— <br />U <br />F__ <br />W�ou) 000��O <br />ZLLLL_z�_j F-Q <br />Ou�°��oZo�oomzZ 0 <br />w w— w <br />U) O <br />zz <br />w }— <br />Q?¢OwQNzwz���0 <br />LL <br />Ow 2HI- 2MM Q <br />LLQ O`' �QLL <br />O <br />O <br />z (N <br />0 <br />U) <br />O <br />0 CY) 00 <br /><CU)MD7 <br />LL <br />2 (1) ti <br />W <br />fy_ ICCC Z M <br />ILG T- <br />Z0 <br />Wz� <br />J 0 <br />J <br />Ict <br />N <br />N <br />O <br />N <br />I <br />ti <br />N <br />I <br />0 <br />0 <br />ao <br />LO <br />CO <br />r- <br />00 <br />— <br />O <br />N <br />O <br />N <br />O <br />N <br />c- <br />N <br />N <br />C) <br />C) <br />N <br />C)O <br />N <br />N <br />C:) <br />N <br />C) <br />N <br />C) <br />N <br />C) <br />N <br />CV <br />00 <br />O <br />Lf� <br />0p <br />O <br />A <br />r <br />N <br />O <br />CO <br />N <br />0 <br />r <br />0 <br />O <br />C) <br />O <br />O <br />r' <br />0 <br />CO <br />0 <br />t� <br />N <br />NLo <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />U <br />i� <br />Z <br />z O <br />z <br />Ip}' <br />W <br />W W W <br />o0 <br />LW-3 <br />V1 <br />ZW <br />F-� <br />Lr�of <br />=m0z <br />N <br />(^ <br />v <br />O j J <br />z> <br />00 <br />Iz}0�2 <br />>-2z0f <br />M <br />_ZzLL <br />N <br />w fV <br />O_j2z <br />U <br />0-zv <br />z <br />�Qo <br />z <br />U <br />OU <br />O <br />a <br />Q <br />z <br />z <br />z <br />LU <br />W <br />N <br />N <br />LAST PLOT DATE <br />Jul. 21, 22 <br />O <br />STRUCTURAL <br />— <br />J <br />DETAILS -MONO <br />