Laserfiche WebLink
INSULATION — <br />BAFFLE <br />INSULATION PER - <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 318" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />PRE ENGINEERED WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROOF <br />-SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />J PLYWOOD SHEATHING <br />J <br />2X BLOCKING @ EA. WALL <br />D NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />to FOR MORE INFO <br />16" O.C. 2X S.P.F. STUDS <br />WI (4)16d TOENAILS TO TOP PLATE <br />W <br />o i <br />0 cn - 7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />2x BOT. PLATE W/ (2)1 Od @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />w LAYER 1/8" THICK. <br />u- = —INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />g R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM ETAL SEAT <br />ER PLAN 0 VOR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />O , <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 318" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS STD. 90 BOOK (SEE DETAIL) <br />1/2" GYP WB 8"x8"X16" CONC. KNOCKOUT <br />INSTALLATION PER BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />M <br />o 4"x4" INSPECTION PORT AT <br />cr a EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. a AT GARAGE CONTRACTOR <br />BASEBOARD M TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER NOTE: EXTEND DECO FINISH <br />MUNICIPALITY 4"to 6" BELOW GRADE <br />c <br />'d FINISH GRADE <br />e • o0 <br />�1� IIT•IIT1I TIIT1' <br />�1JJ.TT �111 a •° A' '. <br />6x6 W1.4xW1.4 <br />WWF OR FIBERMESH �I- I I a• �r I g <br />�TTT-I-iT-III as TT7L <br />"'11-'�1�7'LL-STD. (3) # 5 REBAR ON 3" CHAIR ' (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'-8" <br />TYP 2-STORY WALL SECTION ri <br />SCALE. 3/4 -1-0 S6 <br />SIMPSON LSTA24 STRAP w/ (8) 1Od x 1 1/2" NAILS TO <br />2nd FLO <br />BEAM/GI <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8)1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD e <br />/2nd FLOOR WALL----- <br />BAND JOIST <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />kTE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAN D <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />FLOOR TRUSS FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8)10dx1 1/2" <br />O/C FOR THE 1 ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. 41 <br />BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1— ^ <br />2"x BOT. PLATE <br />(2)10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS: <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 1Odx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=1'-0" <br />FOR ADDITIONAL INFORMATION. <br />TR <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=T-0" ��S6 <br />NOTE: SEE TYPICAL WALL <br />SECTION C/S3 FOR <br />ADDITIONAL INFORMATION <br />SEE SHEATHING <br />SPECS ON FLOOR <br />1/2" GYP, W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. 5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10) 10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />°. .� d.+. a ./° <br />4. . do' = jT'j- <br />- - <br />-d - - - - - <br />TI.I I=1 i I <br />r T (3) #5 CONT. ON 3" <br />8" 1'-8" 8" CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL SLAB INFORMATION. <br />ti <br />e <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />x <br />x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />D <br />p SECTION X-X IF <br />NOT FULL <br />HEIGHT SHEET <br />C <br />Z <br />LIL <br />G <br />FLOOR <br />SYST M <br />(2)- 2x TOP PLATE <br />BEYOND I <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING w <br />SOLID 2x <br />BLOCKING @ ALL <br />C <br />C <br />SHEATHING 0 <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />a U <br />C <br />x <br />w <br />xLU <br />E <br />N <br />2x STUDS w <br />BEYOND. <br />SEE PLAN p <br />O <br />\-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />3/8" "S" = NAIL 3/8" <br />SPACING <br />S 3/4" S 1/2„ <br />S vz„ <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2)12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />SECTION X-X <br />2x CRIPPLES @ — <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x — <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM y" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />o <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN Ya". <br />H <br />Z <br />C NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />_ <br />LL <br />© NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMM( <br />O <br />OD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />Cn <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />p <br />w/ 8d COMMON NAIL <br />LIJ <br />w O <br />n PLYWOOD SPLICES @HEADER -NAIL SHEATHING TO HEADER <br />> O <br />�J w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @TOP & BOTT. <br />a �f OOtn <br />U') OF O m LL it <br />OG (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N p <br />MEMBER IF GABLE END <br />LL LL <br />NOTE: <br />8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 2 112" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2'x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />-• INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />SEE PLAN FOR REQUIRED-'' \ <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />WVJF OR FIBERMESH <br />C .. a. e.. <br />•� d rid 4e <br />M III —III — <br />I —I I <br />IiI=1I II..4l llI1111 <br />" <br />° <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />V-4' <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />3 <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3 <br />(2) <br />(3) <br />(2) LSTA30 <br />JUL 21 2023 <br />i�aa Virtual Review ASSIST, In6�•/ <br />PLYWOOD SHEATHING NAILED PER NAILII G8in Review completed and approved <br />SCHEDULE SEE DETAIL C/S6 FOR M001146181pliance with the 2020 FBC 7th Editl <br />by Debra Anne Klahr PX2300 <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER, MANUF. <br />00 <br />FINISH GRADE <br />tb <br />. 111-1 I I=1 I I[ <br />(3) # 5 REBAR ON Y CHAIR 4" 1'-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING ry <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-0" <br />ADDITIONAL INFORMATION. S6 6 <br />M <br />0 <br />=� <br />LID <br />o <br />00 <br />�o <br />Q <br />F <br />Z <br />1131 <br />0 <br />i <br />0 <br />r <br />Q <br />C <br />W <br />L 0 q U <br />Cn C <br />U 00 <br />:) 0 S 8 <br />0 <br />-Ns <br />4) <br />WCl- <br />TN16= <br />V <br />o E 0 <br />a _0 <br />W <br />W U <br />W <br />W~Q W2J WQQYza Z <br />�8g��O�Oco �dLLUpU- J0 <br />Q <br />0(�0 oZtW00.0z¢a <br />(�0D_>0WWI—zU_2¢O�J <br />00 <br />p0Z ~wOwH�_WziUQ <br />0Q <br />I <br />O <br />CN <br />Z U, <br />O <br />U) 5 <br />O�--M0 <br />Q V7 <br />2 <br />( ti <br />z <br />4LO <br />..M <br />00 <br />Q- <br />- <br />ZU� <br />z� <br />W <br />JQ <br />CD <br />It <br />N <br />N'N <br />N <br />N <br />N <br />ti+� <br />C:) <br />04 <br />C), <br />CV <br />C:) <br />O <br />O <br />0 <br />00 <br />C) <br />(0 <br />00 <br />N <br />O <br />O <br />0 <br />e- <br />0 <br />O <br />O <br />CV <br />O'O <br />CV <br />;CV <br />0 <br />CV <br />0 <br />CV <br />N <br />CV <br />0) <br />CV <br />00 <br />O <br />LO <br />- <br />00 <br />O <br />cM <br />, <br />O <br />M <br />NO <br />4 <br />, <br />O <br />M <br />CD <br />0 <br />0 <br />0 <br />(D <br />0 <br />.7 <br />N Lo <br />L <br />� <br />rr/V <br />COW <br />Z Z <br />—Z O <br />_ <br />O}� <br />W a) <br />O <br />Vora <br />�O-3.a <br />,,^^ <br />V J <br />O <br />W H a <br />Q <br />Z��� <br />'Q <br />:�. <br />y <br />m = Z <br />N <br />�Z <br />w <br />QO <br />�2Zw <br />0 <br />M <br />C0 <br />W N <br />�_32Z <br />N <br />a <br />vul <br />(nZ� <br />. <br />z <br />Z <br />� Q 0 <br />U <br />a <br />OU <br />o <br />W <br />z <br />s <br />z <br />z <br />J <br />W <br />C.0 <br />Q <br />LAST PLOT DATE <br />May. 9, 23 <br />Z O <br />STRUCTURAL <br />— _I <br />DETAILS -MONO <br />