<br />1. SCREENED LINES INDICATE EXISTING CONSTRUCTION TO REMAIN OR NEW CONSTRUCTION COVERED IN ANOTHER DIVISION. HEAVY DASHED LINES INDICATE WALLS AND ITEMS TO BE
<br />REMOVED.
<br />2. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE TO MINIMIZE DISRUPTION WITH NORMAL DAILY FUNCTIONING OF THE
<br />OWNER'S OCCUPIED AREAS.
<br />GENERAL NOTES
<br />3. NOISE DURING DEMOLITION SHALL BE KEPT TO A MINIMUM. ANY WORK REQUIRED AFTER NORMAL WORKING HOURS 7:OOAM-5:OOPM SHALL BE COORDINATED WITH THE OWNER'S 0.061 remove existing cabinets/casework
<br />REPRESENTATIVE. 0.081 remove existing door and frame
<br />0.091 remove existing partitions
<br />4. THE CONTRACTOR SHALL, AT ALL TIMES, INSURE UNINTERRUPTED HEATING, COOLING, PLUMBING, ELECTRICAL AND COMMUNICATIONS SERVICES CONTAINED WITHIN THE PROJECT WHICH 0.092 remove existing ceiling
<br />SERVE PARTS OF THE FACILITY REMAINING IN SERVICE. ANY REQUIRED INTERRUPTION OF SERVICE SHALL BE COORDINATED WITH OWNER'S REPRESENTATIVE TO ALLOW MINIMUM 0.094 remove existing floor finish
<br />INTERFERENCE WITH OWNER'S OPERATIONS.
<br />0.401 remove existing plumbing fixture
<br />11 A 1 B 0.802 patch as required to match existing
<br />t 1 D 1 E° F' 5. THE OWNER SHALL RETAIN ALL SALVAGE RIGHTS OVER BUILDING MATERIALS THAT ARE OF VALUE AS DESIGNATED BY THE OWNER'S REPRESENTATIVE. THE OWNER'S REPRESENTATIVE Q.902 provide visible construction work
<br />t SHALL DIRECT THE CONTRACTOR TO THE LOCATIONS OF STORAGE AREAS FOR VARIOUS SALVAGE ITEMS. THE STORAGE AREAS MAY BE OFF -SITE BUT WILL BE LOCATED WITHIN THE
<br />I GENERAL METROPOLITAN AREA. signage located on finished side of
<br />temporary work
<br />,j 1 temporary door and frame
<br />6. FOR INTERIOR AREAS, PROVIDE TEMPORARY PARTITIONS AND TEMPORARY BARRIERS AS REQUIRED BY THE OWNER AND CONSTRUCTION PHASING. 0.90.981 temporary partition
<br />j
<br />( } 7. TEMPORARY PARTITIONS AND TEMPORARY BARRIERS SHALL BE INSTALLED TO PREVENT DUST POLLUTION OF SURROUNDING AREAS. PARTITIONS MUST BE INSTALLED IN ACCORDANCE
<br />WITH FIRE PROTECTION AND EGRESS REQUIREMENTS. COORDINATE WITH OWNER'S REPRESENTATIVE. A MANOMETER IS REQUIRED TO BE PROVIDED TO MONITOR THE NEGATIVE
<br />PRESSURE.
<br />i7
<br />j 8. TEMPORARY PARTITIONS AND TEMPORARY BARRIERS ARE NOT TO BE REMOVED UNTIL ALL FINISH WORK IS COMPLETED OR APPROVAL IS GRANTED BY OWNER'S REPRESENTATIVE
<br />it
<br />AND/OR AHCA.
<br />`+' 9. UPON REMOVAL OF TEMPORARY PARTITIONS AND TEMPORARY BARRIERS, CONTRACTOR SHALL BE RESPONSIBLE TO PATCH TO MATCH ADJACENT CONSTRUCTION.
<br />( 10. ALL OPENINGS AND VOIDS LEFT BY THE REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, PIPING, ETC. SHALL BE PROPERLY PATCHED TO MAINTAIN FIRE BARRIER, SMOKE BARRIER OR
<br />ii SMOKE PARTITION OF SURROUNDING WALL.
<br />I
<br />1
<br />11. ALL AREAS TO BE DEMOLISHED OR DISTURBED BY ANY DEMOLITION ARE TO BE PATCHED AND PAINTED, OR PREPARED FOR NEW FINISHES. IF PAINTING IS REQUIRED, THE ENTIRE WALL
<br />j SHALL RECEIVE PAINT TO AVOID MISMATCH OF COLOR.
<br />r� 12. ALL FINISHED AREAS WHICH ARE DAMAGED DURING DEMOLITION BY THE CONTRACTOR SHALL BE PATCHED AND VERIFIED TO MATCH EXISTING FINISHES, THE CONTRACTOR IS
<br />f
<br />RESPONSIBLE FOR PROVIDING NEW FINISHES, CEILING, FLOORING, ETC. TO DAMAGED AREAS.
<br />13, EXISTING ITEMS, SUCH AS EQUIPMENT, PLUMBING FIXTURES, ETC. TO REMAIN IN PLACE SHALL BE PROTECTED FROM DIRT AND DAMAGE DURING DEMOLITION AND CONSTRUCTION.
<br />j I i 14. WHERE REMOVAL OF A PORTION OF FLOOR COVERINGS IS REQUIRED, REMOVE ONLY THOSE MATERIALS TO THE EXTENT SHOWN WITHIN THE ROOMS OR CORRIDORS. DEMOLITION
<br />,
<br />INCLUDES REMOVAL OF ADHESIVES, GROUTING BEDS, ANCHORING DEVICES AND REQUIRES REMAINING SURFACES TO BE PREPARED FOR NEW CONSTRUCTION.
<br />—_ --�_
<br />� NN
<br />ENGINEERING I0 %` - --- -_, __ I 1G 1H 1J 1K -� !
<br />II !
<br />MEN
<br />TOOLS
<br />1 EIR _- --- - - y -- —
<br />i \ 5 I I tttittitti-aR its®aatttieitA®t�t�./tip ;
<br />—T— i
<br />II i J MECHANICALh CONSTRUCTION I PROJECT PHASE 1 � (� stir f
<br />- - - - - - ACCESSJ
<br />( I �1
<br />X =�= - - - 1 l --- SOfl
<br />t- i ( M.5
<br />J r, i �.. ._.-- - - , I __. _ , _i _ � _ � � $8 @ 9 i i 9S Yt ' R# b$--6 @ @5 6i M..■
<br />�Xa.
<br />0. 92 ! I
<br />I 11 I I I I STO11
<br />RAGE
<br />OE 1 OFFICE 11 .,I OFFICE i 0. 94
<br />r
<br />i
<br />SUPPLIES -�
<br />i
<br />I -_______,I II ,
<br />OR A I C-
<br />-JL 91 0.991 11
<br />�v� i - BASS.«
<br />( j
<br />O AI LR;e 1r ��. I Fr
<br />OFFICE
<br />BREEZEWAY --- -. -- - - i �= I �l``� EL 11 11 �i 11 j '
<br />— — — I 1 I 11 „ STORAGE ELECTRICAL rE
<br />I i t t t L1 I I OFFI E ,1 - - -- -- - -- --
<br />-1
<br />_ A ,E Y = =
<br />®mot
<br />i ,t ---- I� �7HOUSEKEEPING
<br />I r \, I I I LOA ING
<br />------
<br />I � - 1
<br />PAss. 1 ' LL
<br />( ! -- ---- ( �T�fr
<br />I l r-- I I OFFICE
<br />LOCEI 11 " „ FILE
<br />11
<br />`. i 11 11 STORAGE '
<br />CORR.
<br />i G --- OFFICE I I 'n OFFI E
<br />r I
<br />�
<br />_____—_ "PASS11
<br />I ! ,
<br />OFFICE a
<br />--------�' II „ 11� I 1 iG SEAL
<br />--R- - CA ` ��__ -- -=J Irk �r--- �s= 0.98
<br />--� -- ---T-�--�,T-- VET - -- - - -- - -� �( ����
<br />PROOF i
<br />00 DICE il� �F 0.991
<br />1 I 11
<br />i _
<br />I DRYII IT
<br />y,. " �I OFFICE ;; P
<br />2 0.401 ET TOILE !
<br />-- — ---- 1 4 y
<br />1 PUF #HASING I 4 - AR 5 4-
<br />Ly
<br />I
<br />0.061 i r OFFICE
<br />E AI 'I �j j (i I
<br />.� �, ' � � � WAITING i ' � � REC. �" VOLUNTEER I j � y EEIA
<br />E ZEA OR Al 1 i x 1 1 1 ■ OFFICE ; ARASH AHANI KAMANGAR, AIA AR95990
<br />099
<br />,
<br />i
<br />AW
<br />— — — — 1 — I_i_ _
<br />i
<br />—1 ? '.4 € 1
<br />k h r
<br />G.0 -- -- I ,I _ 1
<br />ELECTRICAL a, ill F I
<br />15REAKI)OWNDRY
<br />�! p
<br />STORAGE
<br />� AREA j
<br />i
<br />w) i fI
<br />0 * i COVERED
<br />0.991 �I AL
<br />1 ' - -----
<br />DEMO��
<br />EXISTING t MECHANICAL
<br />' LOUVER
<br />—7— Z,
<br />REFRIGERATOR
<br />11 { - I I et j geezer ! Freezer !D i' �-
<br />—_E�s€
<br />' I
<br />Al DEMOLITION FLOOR PLAN 1 ST LEVEL - AREA 1
<br />1181, = 1'-011
<br />TRENCHING FOR UTILITY ROUTING
<br />i
<br />PHASE 3
<br />PHASE 2
<br />ELECT.
<br />STORAGE
<br />1 ■ 2 ■ 3 ■ 4 ■ 5 ■ 6 ■ 7 ■ 8 ■ 9 ■ 10 ■ 11 ■ 12 ■ 13 IN 14 ■ 15
<br />AH
<br />n RET
<br />I I I
<br />�L
<br />CHAPEL I r
<br />DISCHARGE
<br />--�-
<br />HH
<br />i►,►aveni nealin
<br />ZEPHYRHILLS
<br />GENERATOR ADDITION
<br />unton•
<br />ARC1—I I T E C T S
<br />DATE SUBMISSION NO
<br />12.17.21 CONSTRUCTION DOCUMENTS
<br />DEMOLITION PLAN -1 ST LEVEL - AREA 2
<br />PROJ. NO. H-20232.00 SHEET