Laserfiche WebLink
SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />➢A TRUSS <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w, <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM 0 RAISED ENTRY <br />CROSS BRACING DETAIL (TYP.)/e"'1 HIP/RIDGE BLOCKING DETAIL 2 MASONRY WALL 4 KNEEWALL ENTRY FRONT WALL r6 <br />SCALE: NTS�"—j SCALE: NTS N"j SCALE: NTS SCALE: NTS <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSIITPl-2014 B FRAMED RIDGE <br />MAY <br />TRUSS PLATE INSTITUTE NOTE THAT THE CONAILED <br />( ) COMBINED WIND AREA IS GREATER MAY w/ MINN.. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. Dg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />-EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />U <br />TB <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX &EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />A. <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. —� <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />SIMPSON LSTA18 <br />w/ (12) 10d NAILS SIMPSON HUC410 w/ <br />CENTERED AT 16d INTO HEADER & <br />(14 SEE PLAN L. <br />) FOR CANT. <br />(6) <br />10d TOP & BOTTOM <br />SPLIT TO TIE <br />10d INTO BEAM -SEE <br />OR SIMPSON H2.5A w/ <br />BEAMS TOGETHER <br />ROOF PLAN FOR MORE <br />(10) 8d NAILS <br />INFO <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE —7116" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SC EDULDE/PLANM OPTION B CONNECTION INFO OPTION C <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />COMMON BM. TO POST ATTACHMENT <br />—� SCALE: 3/4"=1'-0" <br />A � A <br />SEE PLAN FOR <br />./ BM. SPLICE OVER <br />�� CENTER OF POST <br />2x4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3)16d AT <br />EACH STUD -TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />w/ (3) 10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />w/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />DIAGONALN <br />AT 8'-0" <br />2x8 #2 SPF RIDGE BEAM <br />WOOD � <br />SIMPSON MTS18 <br />SIMPSON LUS26 w/ (8)10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />MAX <br />TRUSS �C �C 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />w/ (14) <br />SEE FLOOR FRAMING PLAN <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />10d NAILS TYP. U.N.O. <br />SEE PLAN FOR SIMPSON <br />LUS26-2 w/ (8) 16d NAILS TO <br />THAN 4FT @ 2'-0"0.C. MAX. w/ (3) 10d <br />CANTILEVER IF MTS18 <br />w/ (14) <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />COMMON TOENAILS TO TIE BEAM <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & <br />INDICATED 10d <br />TYP. <br />NAILS <br />U.N.O. <br />2X10 #2 SYP CONT. LEDGER wl 3 <br />() <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />2X4 CONT. AT <br />CONC. MASONRY <br />ADDITIONAL INFO. <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH <br />( IF PARALLEL SEE 2/D2 FOR <br />T & B CHORD <br />STEEL OR WOOD <br />(WOOD COLUMN SHOWN) <br />MIDDLE <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />BLOCKING INFO) <br />BEARING SUPPORT <br />o. ° <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />° <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />A -A ALTERNATE BLOCKING <br />CORNER <br />SECTION AT <br />LOW ROOF 9 <br />SEE <br />L <br />FOUNDATION <br />L Y. <br />DETAIL a@ INTERIOR BEARING <br />, PLAN FOR MORE INFO <br />" <br />SCALE: NTS <br />3 <br />, <br />SCALE: NTS <br />COMMON B M . ATTACHMENT 18 <br />WOOD TRUSS <br />A <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SCALE: NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />STANDARD HEEL HEIGHT <br />SCALE: NTS <br />VARIES <br />2x STUDS @ 16" O.C. <br />ROOF SHEATHING <br />SEE 1/S5 FOR <br />SEE PLAN FOR <br />w/ SIMPSON SP1 w/ 10 1 d <br />( ) <br />ATTACHED PER <br />ADDITIONAL <br />8d NAILS AT VALLEY TRUSS <br />NAILS AT BASE & SIMPSON <br />SP2 w/ 12 1 <br />( ) Od NAILS AT TOP <br />2x4 #2 SPF BRACING @ <br />NAILING SCHEDULE <br />EXTERIOR SHEATHING <br />OUTLOOKER <br />INFO. <br />4" O C INFO. <br />16" O.C. W/ (4) 12d <br />COMMON TRUSSES. <br />ATTACHED PER <br />2x BLOCKING BETWEEN STUDS <br />TOENAILS TO TOP <br />SEE TRUSS PLAN <br />2x4 STUDS w/ SIMPSON NAILING SCHEDULE <br />� <br />TO TRUSS W/ (2) 12d TOENAILS <br />STRUCTURAL SHEATHING <br />PLATE & (2) 12d END <br />NAILS TO TRUSS <br />MIN. (2) 2x4 FOR CONNECTION <br />SPF TOP INFORMATION. <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />ATTACHED PER NAILING <br />BOTTOM CHORD <br />PLATE <br />MORE INFO. <br />GABL <br />TRUSS <br />LOW ROOF/WALL <br />STUD) <br />SCHEDULE <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />VARIES W/ <br />VARIES SEE PLAN <br />FOR WALL LOCATION <br />2x4 BASE PLATE W/ <br />1/2" PLYWOOD <br />NAILS @ 16" O.C. ALONG W/ <br />ROOF SLOPE <br />SIMPSON LSTA30 w/ <br />SIMPSON MTS12 w/ (14) 10d x <br />(22) 10d NAILS OR <br />(2) 16d NAILS TO <br />1 1/2" NAILS TO BLOCKING <br />WOOD WALL <br />SIMPSON MTS12 w/ <br />EACH COMMON <br />TRUSS/ FRAMING <br />BELOW @ 16" O.C. <br />OR TRUSS. 2X4 CONT. W/ 2 <br />() <br />MIN. 2x4 #2 SPF STUDS @ <br />(14) 10d x 1 1/2" NAILS <br />TYP TOP & BOTTOM <br />SEE PLAN 16d COMMONS <br />16" O.C. W/ EXTERIOR <br />TO FLOOR GIRDER <br />NAILS EACH <br />SHEATHING ATTACHED <br />BELOW @ 16" O.C. <br />STUD TYP. T&B <br />PER NAILING SCHEDULE & <br />• MASONRY WALL BELOW: SIMPSON <br />PLYWOOD <br />(3) 12d TOENAILS TO <br />a.. HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />FLOORING <br />TRUSS OR <br />SEE PLAN FORA <br />PLATE BELOW <br />MASONRY WALL <br />e 4'-0" O.C. TO GABLE TRUSS <br />ROOF SYSTEM <br />TOP OF WALL <br />OR BEAM <br />. BEAM BELOW: SIMPSON HTS20 w/ <br />MIN. 2x4 #2 SYP P.T. PLATE <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE TRUSS PLAN <br />a (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />°W/ <br />1/2"X8" EPDXY ANCHOR <br />SEE PLAN FOR SEE PLAN FOR <br />aTO GABLE TRUSS <br />LOW ROOF TRUSS W/ <br />(2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE@ <br />3" FROM EACH END & <br />DIRECTION CONNECTION <br />QCOMMON TRUSS <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />PLAN FOR MORE16" <br />O.C. MAX. <br />SEE ROOF PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />SHEAR TRANSFER <br />INFO. <br />SECTION aC� FLOOR <br />FOR CONNECTION <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />EXTERIOR. WALL <br />SECTION <br />ENTRY g <br />CONNECTION 22 <br />SECTION <br />AT HIP GABLE 12 <br />SECTION @ BUMP OUT �39 <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />SCALE: NTS <br />DETAILS <br />& SECTIONS <br />fff01 P/�,lf <br />���;\14O! <br />�111 <br />r�lb <br />01 <br />U �O <br />°RO <br />F E S S\O�\ NON <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2017 Florida Building Code - <br />Residential 6th Edition. Engineer's signature and seal is only for <br />the structural engineering portions <br />of the drawing pages bearing <br />Engineer's signature and seal. <br />� N <br />O O p� <br />O <br />rp J <br />04 <br />0)J 'O —, * 11A <br />dJ <br />in <br />.�.. <br />9 LL U. � a <br />M <br />n <br />I W fn <br />Z <br />0 <br />c: 0 � o <br />�a>o 000 <br />C ` m <br />W <br />N <br />,, <br />'2 E °' �' o a <br />Z <br />ILW <br />0)N 0 X <br />N Q M Z V J <br />Z <br />V ❑❑❑ <br />z N <br />o <br />'o <br />� QQN <br />¢ c) <br />o <br />N <br />n, <br />VJ <br />_ L <br />(Q <br />.0 <br />Y <br />w i; <br />�N <br />LUO <br />w� <br />C <br />U m <br />w � <br />m E <br />$ <br />Oall <br />I <br />= <br />z19 <br />ci o <br />10 <br />¢ a 0 <br />• <br />®o <br />�m <br />o <br />C.0 <br />w <br />co <br />¢ <br />zz <br />o <br />Z <br />J <br />U- <br />Q E <br />o <br />E <br />zo <br />E <br />>N <br />Z® <br />uco <br /><_ <br />F-- N <br />— E <br />R <br />&� <br />0 o <br />°Q <br />O <br />N <br />Q z <br />o <br />Q <br />Wz <br />W <br />L <br />(d <br />CY <br />O <br />in O <br />Oz <br />O <br />o <br />° <br />a <br />�w <br />O <br />F <br />O <br />M <br />V <br />W <br />ala <br />a x <br />°O <br />°2 <br />N <br />CU <br />c9 <br />.� <br />c <br />00 <br />� <br />M <br />C U <br />C) <br />CL <br />n' 0 <br />vi <br />r <br />p <br />.� <br />Z N <br />T <br />I <br />MO <br />T <br />r 00 <br />N <br />ai <br />3 NO <br />M *— <br />o <br />z <br />z <br />Eca <br />a <br />U <br />Q p <br />JOB <br />NO: <br />20-2747 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />D 1 <br />