My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
3060 Nubbin Ridge Ln
Zephyrhills
>
Building Department
>
Building Plans
>
3060 Nubbin Ridge Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 2:20:14 PM
Creation date
2/19/2025 8:51:15 AM
Metadata
Fields
Template:
Building Plans
Street #
3060
Location
Nubbin Ridge Ln
Contractor
Lennar Homes LLC
Building Plans - Permit #
130
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINUOUS LATERAL BRACING - <br />NAIL OVER X-BRACE AS SHOWN - <br />INSTALL BLKG. AT TRUSS WEBS <br />FOR NAILING <br />CROSS BRACING DETAIL (TYP.) <br />SCALE:NTS <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST T LAND G. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. Cg <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. pg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />X-BRACING - 2x4 SPF OR SYP <br />w/ 2-16d @ EACH TRUSS WEB <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />TB <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />MAX & EACH END ALTERNATE A CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />�L WOOD TRUSS J <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />OL VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />—TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL r7 <br />SCALE:NTS <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />2X4 CONT. AT <br />T & B CHORD <br />TRUSS <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE — <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Ck OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�A TRUSS <br />K <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE:NTS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"0.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />CONC. MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />VARIES <br />ROOF SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 #2 SPF BRACING @ <br />16" O.C. W/ (4) 12d <br />COMMON TRUSSES. <br />TOENAILS TO TOP <br />SEE TRUSS PLAN <br />PLATE & (2) 12d END <br />NAILS TO TRUSS <br />MIN. (2) 2x4 <br />FPLATEPFFTP <br />FOR CONNECTION <br />INFORMATION. <br />BOTTOM CHORD <br />OILVARIES SEE PLAN <br />FOR WALL LOCATION <br />MIN. 2x4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />; <br />MIN. 2X4 #2 SYP P.T. PLATE <br />4 <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />16" O.C. MAX. <br />INFO. <br />SECTION <br />@ ENTRY <br />K8 <br />SCALE:NTS <br />SIMPSON LSTA18 <br />w/ (12) 1Od NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w <br />O.S.B. FLITCH PI <br />TOP @ TRUSS E <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />2 MASONRY WALL 4 <br />SCALE: NTS <br />3IMPSON HUC410 w/ (14) <br />6d INTO HEADER & (6) <br />Od INTO BEAM - SEE oo <br />1OOF PLAN FOR MORE <br />NFO oo <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE <br />CONNECTION INFO <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A INDICATED ON <br />SC EDULE/PLANM OPTION B CONNECTION INFO — <br />COMMON BM. TO POST ATTACHMENT � <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS18 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />CORNER <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />A A <br />SEE PLAN FOR <br />h <br />SCALE: 3/4"=1'-0" <br />SEE PLAN FOR SIMPSON <br />CANTILEVER IF MTS18 w/ (14) <br />INDICATED 10d NAILS <br />TYP. U.N.O. <br />SEE FOUNDATION <br />PLAN FOR MORE INFO <br />COMMON BM. ATTACHMENT 18 <br />SCALE: NTS <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE:NTS <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />TRU <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />SEE PLAN <br />FOR CANT. <br />—7/16" OSB FLITCH PLATE <br />REQ'D ONLY WHEN <br />INDICATED ON BM. <br />SCHEDULE/PLAN <br />OPTION C. <br />BM. SPLICE OVER <br />CENTER OF POST <br />MIDDLE <br />SEE PLAN FOR <br />8d NAILS AT VALLEY TRUSS <br />4" O.C. INFO. <br />• MASONRY WALL BELOW: SIMPSON <br />°.. HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM • BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN a,. (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />TO GABLE TRUSS <br />COMMON TRUSS <br />SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE <br />SCALE: NTS <br />EXTERIOR <br />ATTACHEDI <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE DETAIL 4/D1 <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL @ ENTRY FRONT WALL <br />SCALE:NTS <br />2x4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3)16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />W/ (3)10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SIMPSON LUS26 w/ (8)10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />ZSEE <br />LUS26-2 w/ (8)16d NAILS TO <br />FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />1/2" X 41/2" LAG SCREWS ATTACH <br />(IF PARALLEL SEE 2/D2 FOR <br />LAG SCREWS INTO END OF EACH <br />BLOCKING INFO) <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW <br />ROOF 9 <br />SCALE: NTS <br />LOW ROOFNVALL <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 w/ (10) 10d <br />NAILS AT BASE & SIMPSON <br />SP2 w/ (12) 10d NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 w/ (14) 10d x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />LOW ROOF TRUSS W/--" <br />Z- (2) 2x6 BLOCKING UNDER <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ <br />BUMP OUT 39 <br />SCALE:NTS <br />111_� <br />PLYWOOD <br />FLOORING <br />FLOOR G.T. <br />SEE PLAN <br />DETAILS &SECTIONS <br />a <br />0 <br />� <br />0 <br />�I <br />� <br />_� <br />4;� <br />- <br />F E S S <br />Nf ttt Ut1i <br />To the best of the Engineer's knowledge, information and belief, <br />Me structural plans and specifications contained wittin these <br />drawings comply with the 2017 <br />Florida Building Cade - <br />Residential Sth Edition. Engineer's signature and seal is only for <br />the structural engineering potions of the drawing pages bearing <br />Engineer's signature and seal. <br />s <br />a= Po <br />-,- <br />J <br />Q <br />5LL°'r�71 LL LLft C <br />to 'h W <br />Q. w <br />4 _g. <br />_ <br />LL a K <br />�rn z o <br />W <br />r C N m m <br />m o r� rO g <br />W <br />Z <br />co Elm o a <br />rn3No o:ov, <br />N Q Z M 0 j <br />Z <br />0000 <br />W <br />Z " 4 <br />Z <br />Z <br />J (+l <br />N <br />$_M <br />z <br />0 <br />+-J <br />N <br />W <br />0 <br />" W F <br />N <br />� <br />05 <br />M <br />as <br />= o <br />a <br />�Q <br />s� <br />o <br />M <br />2 <br />W <br />Z <br />1,zo <br />E <br />oS <br />�. <br />a° <br />g <br />Zr, <br />OV <br />I— 6 <br />�z <br /><o <br />XU <br />oa <br />W� <br />OU <br />zo <br />E <br />N <br />ao <br />�o <br />a <br />w� <br />(n C <br />.Y <br />v <br />Nm <br />oLL <br />Z <br />z <br />(� ai <br />CD JW <br />` <br />QW <br />LZ <br />W <br />0LL <br />�G <br />�� <br />°zlaT� <br />3 <br />�c <br />a� <br />^L <br />W <br />� <br />Z <br />CO <br />Q <br />Y <br />CD <br />o <br />O <br />a <br />m <br />oo <br />� <br />04 <br />Z o <br />N <br />= '� <br />o N <br />T_ <br />C <br />z <br />E O <br />C <br />a <br />E <br />0 <br />a o <br />JOB <br />NO: <br />20-1787 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />D1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.