Laserfiche WebLink
2x KNEE WALL OR PRE-ENG FLOOR <br />STRUCTURAL SHEATHING & <br />TRUSS. STUDS 4 QC. <br />ATTACHMENT PER PLAN, CONT <br />META1 6 @ 24' 1— N <br />C <br />T <br />THROUGH FLOOR SECTION <br />NOTE 214 VERTI��.IN!T_D TIGKT TO <br />'CAL' To <br />ZK FRAME WALL PER PLAN. <br />TOP AND BOTTOM <br />CONT 21 PLATE./ (2)16d <br />(3)8d TOENAP S AT <br />WHE EMBEDDED STRAPS <br />NALS 0 is- Qc� <br />AND END GABLE TRUSS <br />PANEL EDGE NAILING <br />VERTr_ALS MISAILIGNS <br />FLOOR SHEATHING & <br />ATTACHMENT PER GEN NOTES <br />TRUSS <br />PER PLAN <br />PANEL EDGE NAILING <br />SHEATHING PER PLAN <br />2.4 BRACING MIN. VV IN <br />Ir CMU WALL, BOND BEAM <br />LENGTH .1(3)10d NAILS END <br />& VERT. REINF. PER PLAN <br />GABLE & MIN* (3) FLOOR TRUSS, <br />BRACiNG SPACED MAX. 5'4Y OZ <br />TROMMASONRYWALL <br />L 1 <br />11/01 2023 <br />Z_f <br />LTM-010 <br />2x FRAME WALL PERPLAN CONT <br />STRUCTURAL SHEATHING & <br />Zx PLATE w/ (2)16d NAILS 0 ;6. Qc <br />0 C <br />ATTACHMENT PER PLAN, CONT <br />FLOOR SHEATH114G & ATTACHMENT <br />T11ROUGH FLOOR SECTION... <br />PER GENERAL NOTES <br />TRUSSIJOIST <br />PANEL EDGE NAILING <br />PER PLAN 7 <br />BEAM/GIRDER PER PLAN <br />PANEL EDGE NAILING <br />... NOTE: ILO CONT. WALL SHEATHING <br />SHEATHING PER INSTALL LSTAIS STRAP EA STUD, <br />PLAN CORNERS & FLANKING ALL OPENINGS. <br />CENTER STRAP AT TOP OF BEAMIGIRDER <br />MW MaMN AT BW <br />L1 <br />11/01/2023 <br />NQ�TO SCALE <br />LGG-070 <br />2.4 LEDGER OR TRUSS TOP <br />CHORD / (2)12d NAILS TO EA <br />STRUCTURAL SHEAI,-..G . WALL STUD (MAX. 16- O.C.) <br />, C.NT <br />ATTACHMENT PER PLAP, STRUCTURAL SHEATHING <br />THROUGH FLOOR SECTION & ATTACHMENT PER PLAN <br />2x FRAME WALL PER PLAN, CONT <br />2x PLATE wl (2) 16d NAILS 0 16' O.C. <br />FLOOR SHEATHING & ATTACHMENT <br />PER GENERAL NOTES <br />TR1JSS PER 7 \� PRE-ENG ROOF TRUSS PER <br />2x KNEE WAI OR MANUF.. STRAP PER PLAN <br />PRE�F LAN �T TOM C ORD OR ZK LEDGER <br />_NG TRUSS PER TRUSS BOT H <br />w CMU WALL BOND BEAM / 10d NAIL TO EA VERTICAL & To <br />, VERT. REINF. PER PLAN BOTTOM PLATE/CHORD @ 16* QC, <br />'-NOTE: <br />DETAIL LDI IS REQUIRED TO ACCOMPANY THIS DETAIL <br />2x FRAME WALL PER PLAN, CONT. 2x <br />STRUCTURAL SHEATHING & <br />PLATE w/ (2)16d NAILS 0 EA TRUSS <br />ATTACHMENT PER PLAN, CONT <br />FLOOR SHEATHING & A=HMIENT <br />T <br />THROUGH FLOOR SECTION <br />PER GE S <br />IN NOTES <br />PANEL EDGE NAILING <br />14) 1 8d NAILS RIBBON TO Ek <br />TRUSS. TYP TOP & BOTTOM <br />Od NAILS TO.C. WALL <br />SHEATHING TO EA. <br />TRUSS END LEG <br />�ER <br />PANEL EDGE NAILING <br />PLAN <br />TRUSS PER PLAN <br />P <br />ETA16ANCHOR <br />S,AHEATHINGY <br />3 <br />EA_ TRUSS <br />AN <br />PER PLAN <br />CMU WALL, BOND BEAM <br />& VERT. REINF. PER PLAN <br />WSONWWALL <br />(1-02 WMTREM <br />11/0112023 <br />\__/NOT TO SCALE <br />LTM_020 <br />P�R PLAN, <br />2x FRAME W AN <br />'4ER <br />STRUCTURAL SHEATHING & <br />P�� <br />CONT. 21 TE / (2)16 <br />(2)"d <br />K <br />ATTACHMEIrr PER PLAN, CONT <br />NAILS @ Is- D.C. <br />THROUGH FLOOR SECTION"' <br />FLOOR SHEATH114G & <br />ATTACHMENT PER <br />MENT PER <br />GENERAL NOTES <br />TRUSS/JO IST <br />PANEL EDGE NAILING <br />PER P LAN <br />BEAMIGIRDER PER PLAN <br />SHEATHING <br />PER PLAN <br />PANEL EDGE NAILING <br />NOTE: <br />ILO CONT. WALL SHEATHING INSTALL <br />A 5S <br />LST 1� TRAP EA STUD, CORNERS & <br />�F <br />_,,n. Tn <br />T CO.Nrr-nON <br />TR�SSNOIST CONNEC"TnION <br />FLANKING ALL OPENINGS. CENTER <br />BEAM PER MANUF. <br />STRAP AT TOP OF BEAM/G4RDER <br />MWECTO AT BW <br />(2-STOW <br />itli <br />11/01/2023 <br />SCALE <br />LGG-M <br />& FRAME WALL PER PLAN, CONT. <br />2x PLATE W/ (2) 16d NAILS 0 16- O.C. 2x RIBBON .1 (2) 10d NAILS @ EA <br />FLOOR SHEATHING & ATTACHMENT TRUSS <br />PER GENERAL NOTES COUPLING NUT, OR THREADED <br />A/� ROD CUT TO LENGTH <br />TRUSS PER PLAN / (2)10d I / <br />TOE NAIL TO TOP PLATE READ @ 32- <br />SHEATHING PER PLAN -J, o-c.—. zLL CORNERS AND <br />RJOOR TRUSS/w TO FRAME WALL 11/3012023 <br />MOD-RB(sv;�) <br />`� F <br />MNG SM TO BOND BFAM <br />2x FRAME WALL PER PLAN <br />HOLD DOWN CONNECTION PER PLAN <br />./ ANCHOR BOLTS OR EPDXY ANCHOR <br />./w MIN. EMBED. (EXPANSION BOLTS <br />ARE NOT ALLOWED) <br />2x BOTTOM PLATE PER PLAN <br />2x BLOCKING @ EA BRG. <br />STUD PER PLAN AS SHOWN <br />PRE-ENGINEERED <br />TRUSS/JOiST PER PLAN <br />8`CMU WALL, BOND BEAM <br />VERT. REINF. PER PLAN <br />ETAIL 2/2812022 <br />�Mo <br />210 LEDGER OR TRUSS TOP <br />STRUCTURAL SHEATHING CONT 2x4 BLOCKINC*IEDGER STRUCTURAL SHEATHING & CHORD / (2)12d NAILS TO EA <br />& / (3)1 Od @ <br />ATTACHMENT PER PLAN, CONT. NAILED TO EA TRUSS THROUGH FLOOR SECTION WALL STUD (MAX. 16' O.C) <br />THROUGH FLOOR SECTION STUI) & TOE ATTACHMENT PER PLAN, CONT. N STRUCTURAL SHEATHING <br />ZK FRAME WALL STRUCTURAL SHEATHING 2. FRAME WALL PER PLAN ATTACHMENT PER PLAN <br />PER GENERAL NOTES A A�l CONT. 2x, " M i <br />CONT. 2. PLAT 2)1�d <br />PER _'CONT & ATTACHMENT PER PLAN NAILS 0 [�;/TRUSS <br />2x PLATE wl (2)16d NAILS 9 IS- O.C� <br />FLOOR SHEATHING & ATTACHMENT 71 4 RIBBON <br />MFLOOR SHEATHING & <br />ATTACH ENT PER GEN. 140TES <br />TRUSS PER PLAN <br />TOP CHORD BEARING <br />ZK KNEE WALL OR <br />PRE-ENG ROOF TRUSS PER <br />PRE-ENG TRUSS PER PLAN <br />MANUF., STRAP PER PLAN <br />8'CMU WALL, BOND BEAM <br />(2) 2.6 LEDGER / 1/4'. 5' <br />& VERT. REINF. PER PLAN <br />SIDS SCREW TO EA TRUSS <br />VERTICAL & TO BOTTOM <br />PLATEICHORD @ 8- 0 C <br />" NOTE <br />DETAIL L01 IS REQUIRED TO ACCOMPANY THIS DETAIL <br />\� PREENG ROOF TRUSS PER <br />CTRUS6 PER PLAN MANUF., STRAP PER PLAN <br />ONT. 2x4 RIBBON TRUSS BOTTOM CHORD OR <br />8- CMU WALL, BOND BEAM 2x LEDGER w/ (2) 1 Od MAIL <br />&VERT REINIF PER PLAN TO CONT RIBBON q 16- 0 C <br />--NOTE <br />DETAIL L02 IS REGUIRED TO ACCOMPANY THIS DETAJL <br />&,_,-�NROOR TO MWIRY W&L @ WW PW w.. I ­\ �RTR TO MM11 W.AL@ WW �RW <br />R" TO MMRY Wa @ WW W Z/2812022 �12�11L—1 <br />rL13 <br />0�70 SCAM L;�i I o SNO'� TO SCALE �;�-120 \__/NOT TO SCALE LTM-130 <br />2x FRAME WALL PER PLAN, CONT. LSTA1 2 @ EA. TRUSS VERTICAL <br />2x PLATE w/ (2)16d NAILS @ Is- O.C, <br />FLOOR SHEATHING & ATTACHMENT <br />PER GENERAL NOTES BEND @ BOTTOM PLATE <br />FIELD FRAME 2X4 KNEE WALL <br />OR PRE-ENG FLOOR TRUSS. <br />STUDS @ 24. 0 C, TOE NAIL <br />BOTTOM PLATE/CHORD W <br />10d NAILS @ 6- O.C. <br />LSTAIS @ EA VERTICAL- BEND <br />TRUSS / JOIST PER PLAN <br />0 BOTTOM OF TOP PLATE <br />SHEATHING PER PLAN <br />Z� FRAME WALL PER PLAN <br />ROORTRMWMRWWALL 12/17r,021 <br />LGW-0210 <br />STRUCTURAL SHEATHING & <br />ATTACHMENT PER PLAN, CONT. <br />- <br />STRUCTURAL <br />2X4 BLOCKING BETWEEN EA <br />THROUGH FLOOR SECTION <br />V, <br />CONT. 2x4 BLOCKINGA-EDGER <br />TRUSS (OR CONTINUOUS AS <br />2x FRAME WALL PER <br />=00� EA STUD & TOE <br />C=NG <br />U S <br />TRUSS ALLOW) �/(3) 10d TOE <br />LAN. CONT. 2x PLATE w/ <br />NAILS 16* OC, <br />EA TRUSS <br />IL TO <br />(2)16d (9 <br />f- STRUCTURAL SHEATHING <br />BEAMIGIRDER PER PLAN <br />ATTACHMENT PER PLAN <br />CO <br />ED . GE NAILING PER <br />FLOOR SHEATHING & <br />-ING & <br />S7 <br />FA <br />PER PLAN <br />q <br />I <br />DETAILS <br />RUSSES <br />ATTACHM R <br />C HMENT PER <br />G RAL <br />ENE N S <br />NOTES <br />E.G I <br />E NA L <br />, EA <br />SH THING <br />SIE <br />4PERPLAN <br />Fieldstone <br />TRUS DIST <br />J <br />114 <br />EA TRUSS <br />TP PLAN <br />TRUSS/JOIST PER PLAN <br />PRE-ENG ROOF TRUSS MR <br />PIII PIN <br />��� <br />KrU26 OR <br />C.O.A.# ARCHITECURE: <br />MANUF., HTU OR HANGER SHEATHING <br />2U6. <br />PER PLAN <br />SHEATHING P PLAN <br />PER MAUNF., N, 0 <br />BEAM OR <br />HANGERPER <br />'NOTE: <br />AA26002802 <br />EDGE NAIL SHEATHING <br />FLOOR <br />TRUSS <br />WE <br />TO THE WMH114WG <br />C.O.E.# ENGINEERING. <br />No. 86 <br />GIRDER <br />BEING CONTINGUS TO THE <br />BEAMBELO ISTOUSELSTA12 <br />W <br />29349 <br />NOTE, <br />@ EA STUD ABOVE To BEAM <br />13 IBRAHEM ELAYEB, PE <br />ILO CONT WALL SHEATHING INSTALL LSTAI 5 STRAP <br />BELOW <br />EA STUD, CORNERS & FLANKING ALL OPENINGS <br />P.E.# 91476 <br />CENTER STRAP AT TOP OF BEAMIGIRDER <br />0 BENJAMIN NIESE, PE <br />0 Z' <br />COWEMATBN 8/18/2022 <br />2- MR CMEM AT FA W/ WW PW MOO (511W.221 <br />1�* <br />L16 <br />NOT TO SCALE <br />L18 <br />TO SCALE <br />P.E.# 86025 <br />-04ORIC N <br />.......... <br />LGG-160 <br />NOT <br />LOG 184(IE-450) <br />";11*1f01VA1. <br />05/24/2024 <br />Z�\ <br />DATE <br />I 1 1111110 <br />2 E <br />J1 - <br />Z <br />fE <br />j E <br />Michigan <br />3400 Aubum Rd <br />Suite 200 <br />Aubum Hills, Ml 48326 <br />+1 248.622.4035 <br />Florida <br />12906 Tampa Oaks Blvd. <br />Suite 150 <br />Tampa, FL 33637 <br />+1 813.466.3310 <br />www.fieldstoneae.com <br />110 <br />C <br />Z <br />Z <br />*_4 <br />W� <br />w <br />C) <br />— <br />tz <br />< <br />un <br />04 <br />_w, <br />n <br />U <br />w <br />0 <br />< <br />cr <br />< <br />T_ ITI <br />N <br />F <br />L <br />DRAWN BY: I =FAE <br />VERSION- 570 <br />SHEET NAME <br />DETAILS - <br />FLOOR <br />SHEET # <br />SA <br />43 <br />