Laserfiche WebLink
2x KNEE WALL OR PRE-ENG FLOOR <br />STRUCTURAL SHEATHING & <br />TRUSS. STUDS @ 24'O.0 / <br />ATTACHMENT PER PLAN, CONT. <br />META16 P 24' D.C. (MAX:)�� <br />THROUGH FLOOR SECTION <br />LED TTO <br />L Tr <br />NOTE: � VERT CN- INSTALLED TIGHT TO <br />'H4ER <br />2x FRAME WALL PER PLAN, <br />TOP AND BOTTOM CHORD �/ ' <br />CONIT 2x PLATE I (2)16d <br />_�Sl <br />(3)8d TOENAILS AT LOCATIONS <br />V44E EMBEDDED STRAPS <br />-.C:N. <br />AND END GABLE TRUSS <br />P"A.. EL NAI <br />VEFITICALS MISAIJGNS - - - - - - - - <br />FLOOR SHEATHING & <br />ATTACHMENT PER GEN NOTES <br />RUSS PER PLAN <br />T TRUSS P <br />PANEL EDGE NAILING <br />PER PL AN <br />SHEATHING PER = <br />2.4 BRACING MIN. e-W <br />U v NO M <br />8'CM WALL, BOND SEA <br />�PLAN <br />LEN GTH (3) Od NAILSNEN. <br />r <br />& VERT. REINF. PER <br />GABLE &VN.'(3) FLOOR TRUSS, <br />M <br />BRACING SPACED MAX. S-0` D.C. <br />R"TwT0MkQawwxL <br />M_ <br />1110112023 <br />-1 _Tw_ _T1 <br />LZ-010 <br />2x FRAME WALL PER PLAN, CONT <br />STRUCTURAL SHEATHING & <br />2x PLATE .1 (2) 1 6d NAILS @ 16- D.C. <br />16' 0 C <br />ATTACHMENT PER PLAN, CONT. <br />FLOOR SHEATHING & ATTACHMENT <br />THROUGH FLOOR SECTION... <br />PER GENERAL NOTES <br />TRUSSNOIST <br />PANEL EDGE NAILING <br />PER PLAN <br />BEAM/GIRDER PER PLAN <br />PANEL EDGE NAILING <br />ILO CONT. WALL SHEATHING <br />ZINOTE: <br />SHEATHING PER IN TALL LSTA1 5 STRAP EA STUD, <br />PLAN CORNERS & FLANKING ALL OPENINGS. <br />CENTER STRAP AT TOP OF BEAMIGIRDER <br />CONNECTION AT BEAM <br />1110112023 <br />(F�.�,y,'NSTOIW <br />NO;TO SCALE <br />L;n7O <br />ZK FRAME WALL PER PLAN, CONT. 2x <br />STRUCTURAL SHEATHING & <br />PLATE / (2)16d NAILS @ EA TRUSS <br />' CO <br />'NELS <br />FLOOR SHEATHING & ATTACHMENT <br />THROUGH FLOOR SECTION <br />R—IBBIGNTO <br />PER GENERAL NOTES <br />PANEL EDGE NAIU14G <br />(-4)16d EANT <br />TRUSS, TYP TOP & BOTTOM <br />8d NAILS T D.C. WALL <br />SHEATHING TO Ek <br />TRUSS END LEG <br />PANEL EDGE NAILING <br />TRUSS PER PLAN <br />META16ANCHOR <br />SHEATHING <br />'H <br />9 EA_ TRUSS <br />PER P=LA.Nj <br />Ir CMU WALL. BOND BEAM <br />& VERT. REINF. PER PLAN <br />- <br />r)FL�0RTWT0MWVWXL <br />11/0112023 <br />LO2 <br />\__/NOT TO SCALE <br />2x FRAME = 'ER <br />STRUCTURAL SHEATHING& <br />CONT. 21 T;T <br />/ (r <br />*' (2),6d <br />ATTACHMENT PER PLAN. CONT. <br />2,16, 0 C <br />NAILS @ 16- O.C. <br />THROUGH FLOOR SECTION ­ <br />FLOOR SHEATHING & <br />ATTACHMENT PER <br />ENT PER <br />AL TE <br />GENERAL NOTES <br />4PLAN <br />TRUSS / JOIST <br />PANEL EDGE NAILING <br />PER PLAN <br />GIRDER PER PLAN <br />SHEA�TH No <br />PER PLAN <br />PANEL E E NAILING <br />... NOTE: <br />' ILO CONT. WALL SHEATHING INSTALL <br />L. <br />LS, <br />LSTA .5 STRAP EA STUD. CORNERS & <br />TRUSSIJOIST CONNECT10N TO <br />FLANIK'ING ALL OPENINGS. CENTER <br />OF BEAWGIRDER <br />(L-0 <br />11101/2023 <br />,�2�TOIWCONNECTIONATBW <br />\__/NOT TO SCALE <br />LGG-080 <br />2x FRAME WALL PER PLAN, CONT. <br />2. PLATE .1 (2)16d NAILS @ 16- O.C. RIBBON .1 (2) 10d NAILS 9 EA. <br />FLOOR SHEATHING & ATTACHMENT TRUSS <br />PER GENERAL NOTES COUPLING NUT, OR THREADED <br />ROD CUT TO LENGTH <br />TRUSS PER PLAN./ (2)IOd -1 <br />TOE NAIL TO TOP PLATE j 17 A.LLZREAD @ 32- <br />SHEATHING PER PLAN 0 C CORNERS AND <br />RM TRUSSIM TO MOE WALL 11/30/2023 <br />MOD-RB(S,�—_) <br />2x FRAME WALL PER PLAN <br />HOLD DOWN CONNECTION PER PLAN <br />w/ ANCHOR BOLTS OR EPDXY ANCHOR <br />w/6' MIN. EMBED. (EXPANSION BOLTS <br />ARE NOT ALLOWED) <br />2x BOTTOM PLATE PER PLAN <br />2x BLOCKING @ EA_ BRG. <br />STUD PER PLAN AS SHOWN <br />PRE-ENGINEERED <br />TRUSS/JOIST PER PLAN <br />8'CMU WALL, BOND BEAM & <br />VERT. REINF. PER PLAN <br />NG STUDS TO BOND FEM DETAIL 2/2W2022 <br />� "�'260 <br />G <br />2X4 LEDGER OR TRUSS TOP <br />=- -ID(2)12d NAILS TO EA 2X4 LEDGER OR TRUSS TOP <br />STU (MAX. Is- O.C.) GONT 2X4 BLOCKINGILEDGER STRUCTURAL SHEATHING & V� CHORD W/ (2)12d NAILS TO EA <br />STRUCTURAL SHEATHING & -1 STRUCTURAL SHEATHING & ATTACHMENT PER PLAN, CONT. <br />TACHME (3)10d @ EA STUD & TOE WALL STUD MAX. Is- O.C) <br />CTURAL SHEATHING <br />ATTACHMENT PER PLAN, CONT, AT NT PER PLAN. CONT. D TO EA TRUSS THROUGH FLOOR SECTION <br />& ATTACHMENT PER PLAN THROUGH FLOOR SECTION STRUCTURAL SHEATHING <br />THROUGH FLOOR SECTION STRU C -A 6 SHEATHING 2x FRAME PLAN \1 9 ATTACHMENT PER PLAN <br />& FRAME WALL PER PLAN, W LL P�R <br />,TRUC <br />'TURAL <br />2� FRAME WALL PER PLAN, CONT S.ONT &ATTACHMENT PER PLAN CONT . M. 1 16 <br />Z, PLATE * (2)16d NAILS 9 I6'O.0 2xPLATEwi(2)I6dNAILS(91 Oz� NAILS (P EA TRUSS <br />A= C= 7 <br />PER GENERAL NOTES <br />PER GEN ONT. 2x4 RIBBON <br />FLOOR SHEATHING & FLOOR SHEATHING & ATTACHMENT F C SHEATHING & <br />ATTACHMENLOTOPRERGEN NOTES <br />w <br />TRUSS PER PLAN '/ -ENG ROOF TRUSS PER <br />3R �/ jLj \� PRE <br />ZK KNEE WALL ( MANUF., STRAP PER PLAN <br />PRE_ENG TRUSS PER PL TRUSS BOTTOM CHORD OR ZK LEDGER <br />8. CMU WALL BOND BEAN, / 10d MAIL TO EA VERTICAL & TO <br />& VERT. REINF. PER PLAN BOTTOM PLATEXHORD %W 16'O.C, <br />-NOTE: <br />DETAIL LOI IS REQUIRED TO ACCOMPANY THIS DETAIL <br />TRUSS PER PLAN <br />ZK KNEE WALL OR <br />TOP CHORD BEARING <br />PRE-ENG ROOF TRUSS PER <br />PRE-ENG TRUSS PER PLAN <br />MANUF., STRAP PER PLAN <br />8- CMU WALL, BOND BEAM <br />(2) ZK6 LEDGER wl 1/4x 5' <br />& VERT. REINF. PER PLAN <br />SDS SCREW TO EA TRUSS <br />VERTICAL & TO BOTTOM <br />PLATE/CHORD @ 8'O.C. <br />" NO <br />DETAIL L01 IS REQUIRED TO ACCOMPANY THIS DETAJL <br />P -ENG ROOF TRUSS PER <br />RE <br />TRUSS PER I MANUF., STRAP PER PLAN <br />CONT. 2x4 RIE TRUSS BOTTOM CHORD OR <br />8'CMU— BOND BEAM 2x LEDGER W/ (2) 1 Od MAIL <br />& VERT. REINF. PER PLAN TO CONT. RIBBON C& 16' O.C. <br />"NOTE <br />DETAIL L02 IS REQUIRED TO ACCOMPANY THIS DETAIL <br />&,_,�NIFW TO MMRY WAL @ WW RW PJ2812022 -,)lFWTOWSONRYW&L@LOWFW Z12a/2022 UM TO MASONRY WAi @ WW RW 12./17/2021 <br />:�_110 �T;7120 LTM-130 <br />O� TO SCALE &NO_� TO SCALE &.0; TO SCALE <br />STRUCTURAL SHEATHING & <br />ATTACHMENT PER PLAN. CONT. <br />STRUCTURAL <br />THROUGH FLOOR SECTION <br />CONT. Z14 BLOCKINCVIEDGER <br />SHEATHING <br />2x FRAME WALL PER <br />/ (3)1 Od (9 EA STUD & TOE <br />C ONTINUOUS <br />PLAN. CONT. 2x PLATE w/ <br />NAILED TO EA TRUSS <br />(2)16d NAILS @ is- D.C. <br />STRUCTURAL SHEATHING <br />A <br />BEAM/GIRDER PER PLAN <br />E. <br />& ATTACHMENT PER PLAN <br />.0 <br />FL <br />FLOOR SHEATHING & <br />PER PLAN <br />, NT PER <br />ATTA( 'HME <br />GENERAL NOTES <br />E E NNAIL <br />HEATHING <br />S SHEATH,�G <br />-Us. I JOIST <br />TRUSSIJOIST PER PLAN <br />IRE-ENG ROOF TRUSS PER <br />PER PLAN <br />MANUF., HTU26 OR HANGER SHEATHING PER PLAN <br />SHEATF41NG PER PLAN <br />PER MAUNF., U.N.O. <br />BEAM OR <br />EDGE MAIL SHEATHING <br />FLOO <br />TRUSS <br />GIRDER <br />... NOTE: <br />ILO CONT. WALL SHEATHING INSTALL LSTAI 5 STRAP <br />EA STUD, CORNERS & FLANKING ALL OPENINGS. <br />CENTER STRAP AT TOP OF BEAWGIRDER <br />CMNEM AT FA 8/lW2022 <br />L16 <br />NOT TO SCALE LGG-160 <br />7- 2114 BLOCKING BETWEEN EA <br />TRUSS (OR CONTINUOUS AS <br />TRUSS ALLOW) ./(3) 10d TOE <br />WNx IL TO <br />NNW <br />I � �EDGENAILINGPER <br />ET <br />DETAILS <br />dUSSES <br />H/4*x5* SDS @ <br />EA TRUSS <br />TU26 OR <br />HANGERIPER <br />-NOTE: WAPAP1111VE <br />TO THE H. <br />BEING CONTINOUS TO THE <br />BEAM BELOW IS TO USE LSTA12 <br />0 FA <br />_ STUD ABOVE TO BEAM <br />BELOW <br />2-9OffCONNECTMATBWW/WWW MOD (5110 <br />L18 — _f22) <br />OT TO SCALE LGG-164(IE-450) <br />2x FRAME WALL PER PLAN. CONT. <br />Z, PLATE / (2)1 6d NAILS LD 16* O.C. <br />FLOOR SHEATHING &ATTACHMENT <br />LBSTA1 2 @ E.A TRUSS VERTICAL <br />PER GENERAL NOTES <br />END 0 Bo rioM PLATE <br />FIELD FRAME 2.4 KNEE WALL <br />OR PRE-ENG FLOOR TRUSS, <br />STUDS 0 24- O.C., TOE NAIL <br />BOTTOM PLATE/CHORD w/ <br />1 Od NAILS @ 6. 0 C <br />LSTA15 @ EA. VERTICAL, BEND <br />TRUSS / JOIST PER PLAN J <br />0 BOTTOM OF TOP PLATE <br />SHEATH NG PER PLAN <br />I : .4; <br />Z, F.E WALL PER PLAN <br />(— �RL=TI1=WT0F%IEWAi <br />L03 <br />LGW-030 <br />a <br />%^;0 Fieldstone <br />C.O.A.# ARCHITECURE: <br />AA26002802 <br />C.O.E.# ENGINEERING: <br />29349 <br />0 IBRAHEM ELAYEB, PE- <br />P.E.# 91476 <br />N BENJAMIN NIESE, PE <br />P.E.# 86025 <br />05/30/2024 <br />DATE <br />4:= <br />.10 OF <br />4OR191" <br />C, <br />E 'E <br />E <br />Z <br />0 <br />L <br />Michigan <br />3400 Aubum Rd <br />Suite 200 <br />Aubum Hills, Ml 48326 <br />+ 1 248.622.4035 <br />Florida <br />12906 Tampa Oaks Blvd. <br />Suite 150 <br />Tampa, FL 33637 <br />+1 813.466.3310 <br />www.fieldstoneae.com <br />0 <br />0 <br />W_ <br />UJ <br />0 <br />C) <br />3,: <br />U <br />w <br />6 <br />Ln <br />cr <br />in Ix <br />0C <br />w <br />In <br />U) <br />01 <br />)RAWN BY: I FAE <br />VERSION: 5.0 <br />3HEET NAME <br />DETAILS - <br />FLOOR <br />3HEET # <br />S <br />_j <br />