Laserfiche WebLink
1X4 1/2" DRYWALL <br />"RYWALL DOOR JAMB (REFER <br />DOOR JAMB (REFERff <br />1 X 4 1/2" DRYWALL <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER <br />TO SHT. SDW2-K1 P.T. <br />TO SHT. SDW2-K1 <br />TO SHT. SDW2-K1FOR CONN. DETAILS <br />MAX <br />PROPER INSTALLATION <br />8„ <br />DO NOT DO THIS <br />2"x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />FOR CONN. DETAILS <br />FOR CONN. DETAILS <br />X 4 <br />1 X 4 <br />#5 REBAR (TYP,) <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />1 X 4 <br />„ <br />3-1/4 LONG X 3116 0 FURRING <br />�� �� <br />3/16 0 X 3 LONG " " <br />FURRING 3/16 0 X 3-1/2 LONG <br />TAPCONS <br />FURRING <br />#5 REBAR <br />(TYP,) <br />AND NAILED W/ $d COMMON @ <br />6' O.C. EDGES AND 12" O.C. FIELD <br />O. BOTTOM PLATE W/ 8d D 4" <br />O.C., 2 ROWS STAGGERED <br />TAPCON. INTO <br />TAPCONS STAGGERED <br />STAGGERED @ 16".. <br />2X8 <br />BLOCK@ SPACING <br />1 DETAIL <br />STAGGERED @ 16" O.C. <br />O.C. 2-ROWS INTO 2-ROWS INTO <br />1X8 <br />W/ FACE <br />PER MANUFACTURE <br />MASONRY THROUGH 1-1 /2" DETAIL MASONRY THROUGH tt <br />3 DETAIL <br />FILL SOLID <br />STD. 90" <br />D. 90° HOOK (TYP,) <br />2x BAND JOIST NAIL 1od <br />@ TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & 1x8 P.T. 1x8 P.T. & 2x8 P.T. <br />BOTH CELLS <br />HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />3/16" x 3 -1/2" <br />TAPCON @ 16" <br />METAL SEAT PLATE <br />O.C. & 4" FROM <br />1X4 P.T. <br />3/16" x 3 -1/2" DOOR JAMB (REFER <br />1/2" DRYWALL <br />1 X 4E11L <br />NOTE: <br />LAP SHEATHING TO <br />DOOR JAMB (REFER EACH END W/MIN. <br />DOOR JAMB REFER TAPCON TO SHT. SDW2-Ki FOR <br />(F7 <br />BOTTOM OF BAND <br />TO SHT. SDW2-K1 2" EDGE DIST. TO SHT. SDW2-K1 CONN. DETAILJ <br />JOIST TYPICAL <br />FOR CONN. DETAILS <br />FOR CONN. DETAILS 10d @ 12" O.C. <br />1 X 4 <br />FURRING <br />2X8 P.T. WITH 3/16"0 X 3" <br />+211 <br />LI <br />NOTC @ FIRST COURSE <br />USP HGAM10 12" O.C. w/4-SDS <br />@ <br />LONG TAPCONS <br />_ <br />1/4x1 1/2" SCREWS INTO BAND <br />2x P.T. AS REQ'D <br />2X8 P.T. STAGGERED @ 16" O.C. <br />2X <br />JOIST & (4) 3/16 x1 3/4 WEDGE <br />2x DETAIL <br />2 1/4" DETAIL 2-ROWS INTO MASONRY 3-1 /4LL DETAIL <br />NOTCH WEB AT THE <br />FIRST 2 COURSES <br />BOLTS INTO K.O. BLOCK <br />+5n <br />BUILDOUT @ OVER SIZE DOOR <br />-WINDOW ROUGH OPENINGS CC <br />LED CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION <br />H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. <br />SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. <br />INFO SCALE: N.T.S. <br />SCALE: N.T.S. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />SECTION <br />UPLIFT CAPACITY = 945 #FOR 1 STRAP <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />A -A <br />=1890 #FOR 2 STRAPS <br />FILL 1st4 COURSES <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />2'-0" <br />8" <br />1-PLY PRE-ENGINEERED TRUSS <br />.a SOLID W/GROUT <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. & BUCK <br />1/4" x 31/4" TAPCONS <br />USP RT16M W/ (8) NA11 NAILS & (6) 4" x 24" <br />BLOCK HEADER <br />TAPCONS <br />1/2" DRYWALL <br />' ` (IF TRUSS IS 2 PLY INSTALL USP HTWM16 W/ (6) <br />10d NAILS x 1�' NAILS AND <br />AT <br />8d NAILS 8 O.C. AT BUCK <br />n <br />2 x 8 45 DIAGONAL 4 10d NAILS INTO <br />O <br />—LEAVE A CUT OUT IN O.S.B. ON THE <br />E <br />(4) 4" X 12" WEDGE BOLTS [ (1) STRAP = 1225 <br />` <br />BRACE(S) 2 x BRA E/ BLKG. <br />8 C <br />INSIDE TO ALLOW FOR INSULATION <br />::?;,.._, >`,, .'; : ': '. <' :" ::. (2) STRAPS 2450#]) <br />7/16" OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />, „ . . IN PLACE BEAM <br />CONTACT ENGINEER I RECORD FOR <br />FURTHER INSTRUCTIONS. ' ". '. ' • a� %. .: <br />SCRIBE (NOTCH) <br />BACKSIDE TO FIT ARCH (4) 10d NAILS INTO 2 x 8 <br />FACE OF ARCH W/ (3)10d NAILS <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />- .a <br />OVERRAN '• •.b .•.• �,. <br />CONNECT W/ 8d NAILS BRACE/BLKG. <br />Y) <br />N.T.S. <br />INSTALL WDW. SCREW ANCHOR�Tl\\_2x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 PROVIDE TAPCON WITHIN <br />-A, <br />RETROFIT WALL OVERHANG DETAIL <br />NTS ) <br />INTO ARCH BLKG. PER <br />A <br />4" MIN. OF BRACE <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />- <br />INSTALLATION DETAILS -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />TRUSS AS SHOWN FOR O.H. UP TO Z-6" <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF <br />ARCH <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />START OF ARC <br />IF TRUSSES USED) W/ (3) #6 X 4Yi' WOOD <br />NOTE; FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REO'D. <br />4 MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />k 0 (2)10d NAILS @ 8" O.C. <br />�FRygN <br />ARCH DETAIL <br />J <br />WALL USE (3) 1/4" X 31/2" TAPCONS AT 16" <br />TO TRUSS TOP CHORD <br />SCALE: N.T.S. <br />SS <br />O.C. 12 <br />+ + tGr PLYWOOD SHEATHING <br />N <br />'I 1'-011 51 <br />-011 <br />JACK TRUSS PROVIDED BY SEE <br />+ + <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />+ + <br />+ <br />OlLf INISH FLO <br />2 <br />x 8 BUCK - CONNECT TO BLOCK <br />SECTION <br />+ + BLOCKING AS <br />° <br />WITH <br />1/4" x 31/4" TAPCON (11/4' MIN. <br />B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />" <br />/4" MAX EMBEDMENT INTO K.) <br />2 8 <br />PER NAILING SCHEDULE ALL <br />+ TO SUPPORT <br />TRUSS SOFFIT <br />° • ° > a ; ' . >.• <br />n <br />#5 BAR <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />-0 <br />(5) -12d NAILS <br />+ + <br />. D. ° <br />p 1OIr ° b ° : <br />9 <br />CENTERED W/ g <br />1 X 4 FURRING <br />BLKG. & BUCK <br />2X6 TO 2X4 USP RT3A <br />2X4 SYP r ®s <br />o • . ° <br />' <br />IN TOP o <br />KNOCKOUT / N <br />EACH TRUSS <br />o •' <br />CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />PROVIDE 2 x 8 DIAG. BRACE B <br />2 x 8 VERT. W/ (2) 10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ <br />s' <br />CONNECTOR <br />y• <br />MONO FOOTING _ •a e, . . > ° <br />(3) <br />SIZE AND REINF. PER PLAN <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />SEE LINTEL <br />AND SECTION DETAILS -' <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BYor <br />--/ <br />SCHED. <br />- <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL .> A. '. <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />ENTER SO IT <br />DIRT <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />4'-0" MAX SEE PLAN <br />LINTEL <br />STANDARDPRECAST <br />°• � <br />SCRIBE NOTCH BACKSIDE <br />(NOTCH) <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />a T99 <br />#5 BAR IN <br />HOOK cv <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4%" WOOD <br />FOR OVER HANG <br />FILLED CELL - <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />4' MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />. . � . <br />• r ►- v s • <br />`� <br />INSTALL WDW, SCREW <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL <br />WALL USE 2 1/4" X 3 1/2" TAPCONS AT 16" <br />() <br />►% <br />r " Ve " <br />ANCHOR INTO ARCH BLKG. <br />THRU OSB INTO 2 x 8 <br />O.C. <br />PER INSTALLATION DETAILS <br />B-g <br />ARCH DETAIL K <br />SECTION @ENTRY L <br />SECTION @ ROOF EXTENSION M <br />STEMWALL FOOTING SIZE AND <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. SS <br />SCALE: 3/4" =1'-0" SS <br />SCALE: 3/4" =1'-0" SS <br />SECTION DETAILS <br />SCALE: 3/4" = 1'-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: <br />IF RETROFIT FILLED CELL CONDITIONS <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />EXCEED <br />(3) PER PROJECT, CONTACT ENGINEER OF RECORD <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />FOR ADDITIONAL <br />INSTRUCTION. <br />EXTENDS TO SILL. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />EXISTING BOND BEAM. <br />REINFORCING. PROVIDE LOWER <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />HOOKED DOWEL <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />DRILL 3/4"X6" MIN. HOLE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />SET BAR IN EPDXY <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />HTT16 W/ (18) -16d NAILS TO <br />CAP TO PREVENT LEAKAGE <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.M. AT PERIMETER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />STUDS & (1) - 5/8" DIA. ALL <br />#5X6' EMBEDDED INTO <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL PER ANCHOR) <br />(1) #5 BARS CONT. OCCURS <br />TOP WITH MIN. 3" <br />THREAD ROD EPDXIED W/ <br />SIMPSON "SET' EPDXY MIN. <br />Z <br />EXISTING BOND BEAM <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. THE SAME SPACING <br />( <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT AND HEADS IN OF CHANNEL <br />REINFORCING <br />COVER 6'-0" <br />5" EMBEDMENT & 3" MIN. <br />O <br />JAMBS LIEU <br />(EVERY OTHER <br />F.F. <br />—I <br />EDGE DISTANCE <br />Q <br />FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) EXPANSION STRIP <br />v <br />NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />° <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />o p <br />v a <br />A <br />REINFORCING AS FOLLOWS: <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />< ': SEALANT <br />_ _- <br />* PRESS PANEL REINFORCING INTO PLACE. <br />I I <br />� <br />v Z <br />5X6'EMBEDDEDINTO <br />6" MIN. LAP SPLICE W/ <br />' I=lll" <br />T <br />g <br />EXISTING FOOTING <br />2- X6' IN CONC. <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />REINFORCING PANEL <br />"' <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />.'.° <br />° _ I <br />n o 1 I �I <br />LL <br />DRILL 3/4"X6"MIN. HOLE <br />F PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />j <br />;'':......::..:::. :•.:::.,:..,..;;_` ,`"' <br />GRADE • o. .• • oI I =;�I <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />6" MIN. LAP <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE NOTE: <br />M <br />REMAIN FREE OF MORTAR. <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />iv g <br />• o <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />, ° <br />;4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />\ ' (2) #5 REBAR. MIN. 3" <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. 00, COVER EA. WAY <br />A SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />1 SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />DF SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT <br />FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAYBE INSTALLED IN ANY OPENING. <br />SS SCALE: 3/4" =1'-0" <br />SCALE: 3/4" =1'-0" <br />FOR WIND SPEEDS UP TO 110 MPH", PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />CD LO <br />Zo <br />Z <br />Q <br />O <br />a <br />' z <br />IDM v� <br />0 <br />U — <br />LU <br />0 <br />M <br />~' <br />E <br />Vi <br />o 0 <br />U <br />W E <br />f— <br />N M <br />CI f6 M <br />N` C N <br />— U <br />O O <br />L_ LL CO <br />U� <br />Nfl-o <br />< 00) <br />A <br />B <br />� <br />®® <br />N C B D-C <br />�X <br />� <br />CN <br />�•®aa o" •sN.�•p <br />�• E • <br />P <br />N <br />co <br />i c. <br />�J <br />LLZ <br />Q <br />WU <br />SO <br />5%G�`'� <br />To the best of the s En ineer'knowledge, information, and <br />g g <br />belief, the structural plans and specifications contained <br />within these drawings comply with the Florida Building <br />Code 5th Edition (2014) Residential. Engineer's signature <br />and seal is only for the structural engineering portions of <br />the drawing pages bearing Engineer's signature and seal. <br />i <br />O <br />Z N <br />o(1)N <br />L/—I-I M G <br />M <br />Q M Ln <br />(A <br />i2 <br />Q U_ <br />U C: ()0 <br />Q <br />WJ <br />Z <br />�O <br />d' <br />Oz <br />WZ�o a <br />cwL 0 UW) 0 <br />Oz>-z<O <br />z > Q UU g Q <br />a <br />_ �wl'-Z <br />�gubd_. <br />nj <br />OaU3Oo <br />) E— W <br />Uxo�w N <br />O <br />~0.0zOo <br />O <br />N <br />/'1 <br />Ll') <br />J <br />� W 3 <br />tU0o� <br />roZ�2 <br />2 <br />Z <br />—'G <br />Waoo0o <br />o <br />J <br />N <br />$��oj�Saa�a� <br />C) <br />1�WOLLzQ <br />:325 <br />N <br />I..i') <br />a <br />`n9o'z <br />0 <br />O <br />U.IL <br />Z <br />.. <br />Z <br />a <br />SCALE : AS NOTED <br />PLOT DATE: 12/7/2012 <br />TECH: FFLORES <br />VERSION NO. <br />5all <br />JOB NO: 17-4139 <br />SHEET NO. <br />