My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6648 Paden Wheel St
Zephyrhills
>
Building Department
>
Building Plans
>
6648 Paden Wheel St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 12:41:41 PM
Creation date
2/19/2025 9:04:21 AM
Metadata
Fields
Template:
Building Plans
Street #
6648
Location
Paden Wheel St
Contractor
Lennar Homes
Building Plans - Permit #
19247
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOOR JAMB REFER 1X4 1/2" DRYWALL <br />( <br />1/2" DRYWALL DOOR JAMB REFER <br />DOOR JAMB (REFER 1 X 4 ( <br />1 X 4 1/2" DRYWALL <br />MAx. <br />UNACCEPTABLE INSTALLTION <br />8 <br />TO SHT. SDW2-K1 P.T. <br />TO SHT. SDW2-K1 TO SHT. SDW2-K1 <br />FOR CONN. DETAILS <br />PROPER INSTALLATION <br />DO NOT DO THIS <br />2"x BOT. PLATE W/ (2) 10d @ 6" o.C. <br />FOR CONN. DETAILS <br />FOR CONN. DETAILS <br />1 X 4 <br />1 X 4 <br />#5 REBAR (TYP,) <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />1 X 4 <br />3-1/4" LONG X 3/16" 0 FURRING <br />3/16" 0 X 3" LONG FURRING 3/16" Q X 3-1/2" LONG <br />FURRING <br />#5 REBAR <br />AND NAILED W/ 8d COMMON @ <br />6" O.C. EDGES AND 12" O.C. FIELD <br />2X BOTTOM PLATE W/ 8d @ 4" <br />O.C., 2 ROWS STAGGERED <br />TAPCON. INTO <br />TAPCONS TAPCONS STAGGERED <br />STAGGERED @ 16" <br />2X8 <br />(TYP,) <br />BLOCK@ SPACING 1 „ DETAIL <br />1X8 P.T. STAGGERED @ 16" O.C. <br />O.C. 2-ROWS INTO <br />2-ROWS INTO <br />1X8 <br />W/ FACE NAIL <br />PER MANUFACTURE <br />MASONRY THROUGH 1-1 /211 DETAIL MASONRY THROUGH <br />3 <br />�� <br />DETAIL <br />STD. 90A <br />TD. 90° HOOK (TYP.) <br />2x BAND JOIST 10d <br />TOP & JOIST <br />CHORD, AND 8 <br />@ ( ) <br />1x4 P.T. & 1x8 P.T. 1x8 P.T. & 2x8 P.T. <br />FILL SOLID <br />BOTH CELLS <br />HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />3/16" x 3 -1/2" <br />TAPCON @ 16" <br />METAL SEAT PLATE <br />O.C. & 4 FROM <br />1 X4 P.T. <br />3/16 x 3 -1/2 DOOR JAMB (REFER <br />1 X 4 1/2" DRYWALL <br />NOTE: <br />LAP SHEATHING TO <br />DOOR JAMB (REFER EACH END W/ MIN <br />DOOR JAMB REFER TAPCON TO SHT. SDW2-K1 FOR <br />( <br />D <br />BOTTOM OF BAND <br />TO SHT. SDW2-K1 2" EDGE DIST. <br />TO SHT. SDW2-K1 CONN. DETAILS <br />JOIST TYPICAL <br />FOR CONN. DETAILS <br />FOR CONN. DETAILS 10d @ 12" O.C. <br />1 X 4 <br />FURRING <br />2X8 P.T. WITH 3/16" 0 X 3' <br />+2" <br />NOTC @ FIRST COURSE <br />USP HGAM10 @ 12" O.C. w/4-SDS <br />LONG TAPCONS <br />- <br />1/4x1 1/2" SCREWS INTO BAND <br />2x P.T. AS REQ'D <br />2X8 P.T. STAGGERED @ 16" O.C. <br />2X8 <br />JOIST & (4) 3/16"x1-3/4" WEDGE <br />2x DETAIL <br />2 1/4" DETAIL 2-ROWS INTO MASONRY 3-1/4" DETAIL <br />NOTCH WEB AT <br />BOLTS INTO K.O. BLOCK <br />+5A <br />FIRST2COURSESE <br />BUILDOUT @ OVER SIZE DOOR <br />-WINDOW ROUGH OPENINGS rcC <br />LED CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION <br />K'H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S, <br />SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. <br />INFO SCALE: N.T.S. <br />SCALE: N.T.S. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />SECTION <br />UPLIFT CAPACITY = # FOR 1 STRAP <br />W/ 1/4" x 31/4" TAPCON " <br />( 1 1/4MIN. <br />A -A <br />890 <br />= 190 #FOR 2 STRAPS <br />FILL 1st4 COURSES <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />SOLID w/GRouT <br />8' <br />1-PLY PRE-ENGINEERED TRUSS <br />a <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. &BUCK <br />1/4" x 3 1/4" TAPCONS <br />USP RT16M W/ (8) NA11 NAILS & (6)1" x 2a' <br />' <br />BLOCK HEADER <br />TAPCONS <br />1/2" DRYWALL * <br />(IF TRUSS IS 2 PLY INSTALL USP HTWM16 W/ (6) <br />10d NAILS x 12' NAILS AND <br />8d NAILS AT 8" O.C. AT BUCK <br />(4) a' X 1' WEDGE BOLTS [ (1) STRAP = 1225 # <br />2 x 8 45^ DIAGONAL (4)10d NAILS <br />LEAVE A CUT OUT IN O.S.B. ON THE <br />, <br />(2) STRAPS 2450#]) <br />BRACE(S) 2 x 8 BRACE/ <br />INSIDE TO ALLOW FOR INSULATION <br />7/16" OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />BUILT UP PLWD. BUCK NARCH PANEL CUT HB. FOR <br />POLYS AREA <br />7LL <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />IN PLACE BEAM <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. ' ° •' <br />SCRIBE (NOTCH) <br />BACKSIDE TO FIT ARCHIT (4INTO 2 x 8 <br />FACE OF ARCH W/ (3) 10d NAILSOVERRAN�<` <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />CONNECT W/ 8d NAILS B.N.T.S.INSTALL <br />WDW. SCREW ANCHOR 2 x4 SOLID BLKG. (FULL ALL) BTWN. OSB <br />INTO ARCH BLKG. PER ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 <br />PROVIDE TAPCON WITHIN <br />RETROFIT WALL OVERHANG DETAIL <br />(NTS) <br />4" MIN. OF BRACE <br />A <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />INSTALLATION DETAILS -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF <br />ARCH <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />* DOUBLE 2x4 SCAB FOR 2-6" TO 4'-0" O.H. <br />START OF ARC <br />IF TRUSSES USED) W/ (3) #6 X 4%" WOOD <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REO'D. <br />4' MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY / <br />NAILS @ 8" O.C. <br />x0TO <br />� TRUSS TOP CHORD <br />FRygN TO TRUSS <br />ARCH DETAIL <br />WALL USE (3) 1/4" X 3 1/2" TAPCONS AT 16" <br />O.C. <br />+ �FNGTN <br />+ <br />11-011 5'-011 <br />SCALE: N.T.S. <br />SS <br />12 <br />+ PLYWOOD SHEATHING <br />JACK TRUSS PROVIDED BY <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24 O.C. <br />+ + <br />I N I S H FLO <br />2 <br />x 8 BUCK - CONNECT TO BLOCK <br />SECTION <br />+ + BLOCKING AS <br />° <br />`� <br />WITH <br />1/4" x 31/4" TAPCON (1 1/4" MIN. <br />B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />>.6 ' : � •� <br />EMBEDMENT INTO K.) <br />1/4" MAX <br />PER NAILING SCHEDULE ALL <br />TO SUPPORT <br />TRUSS + SOFFIT <br />° o. <br />° a <br />° <br />#5 BAR <br />2-0 8' <br />+ + <br />°D, 101, <br />CENTERED W/ <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5) -12d NAILS <br />+ <br />° . <br />°P 9 H <br />IN TOP <br />1 X 4 FURRING <br />BLKG. &BUCK <br />2X6 TO 2X4 USP RT3A <br />2X4 SYP r ®s <br />o ° <br />' <br />o <br />KNOCKOUT / N <br />EACH TRUSS <br />o d .' <br />CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />_ <br />PROVIDE 2 x 8 DIAG. BRACE B <br />2 x 8 VERT. W/ (2) 10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ (3) <br />CONNECTOR <br />p <br />MONO FOOTING •, e. p ° <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />SEE LINTEL <br />SIZE AND REINF. PER PLAN <br />AND SECTION DETAILS -I <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY <br />SCHED. <br />- - <br />..o <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL A. ° <br />2 x 8 VERT. BRACE S) <br />( <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />ENTER SO IT <br />DIRT � � ' <br />z_ <br />TO BE INSTALLED <br />2 <br />BUILT UP PLWD. BUCK - <br />4'-0" MAX SEE PLAN <br />PRECAST LINTEL% <br />° STANDARD o <br />° .zlo <br />SCRIBE NOTCH BACKSIDE <br />(NOTCH) <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />o 90 <br />r <br />#5 BAR IN • <br />HOOK iv <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4'Y2" WOOD <br />FOR OVER HANG <br />FILLED CELL • -, • -,, , -,, , <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />. ,, • , N • ,, . • ,, <br />INSTALL WDW, SCREW <br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL EQUAL <br />4' MAX. RAD. <br />WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16" <br />_, <br />►: <br />.- .• �.- s• • �.- e• •.- s• �.- s• <br />ANCHOR INTO ARCH BLKG. <br />THRU OSB INTO 2 x 8 <br />O.C. <br />PER INSTALLATION DETAILS <br />B-g <br />ARCH DETAIL K <br />SECTION @ENTRY L <br />SECTION @ROOF EXTENSION M <br />STEMWALL FOOTING SIZE AND <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. SS <br />SCALE: 3/4" =1'-0" SS <br />SCALE: 3/4" = V-0" SS <br />SECTION DETAILS <br />SCALE: 3/4" = 1'-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: <br />IF RETROFIT FILLED CELL CONDITIONS <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />(3) PER PROJECT, CONTACT ENGINEER OF RECORD <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. AT <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />FOR ADDITIONAL <br />INSTRUCTION. <br />EXTENDS TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />� <br />REINFORCING. PROVIDE LOWER <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />HOOKED DOWEL <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />DRILL 3/4"X6"MIN. HOLE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />SET BAR IN EPDXY <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />HTT16 W/ (18) -16d NAILS TO <br />CAP TO PREVENT LEAKAGE <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />"SQUEEZED" <br />W.W.M. AT PERIMETER <br />() STUDS & 1 - 5/8" DIA. ALL <br />COURSES TO PREVENT THE MORTAR FROM BEING OUT. <br />1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />y <br />#5X6' EMBEDDED INTO <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL PER ANCHOR) <br />(1) #5 (BARS CONT. OCCURS <br />TOP WITH MIN. 3" <br />THREAD ROD EPDXIED W/ <br />SIMPSON "SET" EPDXY MIN. <br />zo <br />EXISTING BOND BEAM <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />REINFORCING <br />COVER 6'-0" <br />5" EMBEDMENT & 3" MIN. <br />Cn <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />F.F. <br />EDGE DISTANCE <br />FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) EXPANSION STRIP <br />LL <br />NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />° <br />O <br />A <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />u u u <br />w c- <br />REINFORCING AS FOLLOWS: <br />- <br />—I <br />v <br />1 <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />SEALANT <br />I=I I—i I —I I —III I- <br />' ° I=I I I=I I I=I I -I I I I I-' <br />#5X6 EMBEDDED INTO <br />* PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W/ <br />o ° III —III —III- <br />0z <br />EXISTING FOOTING <br />2-#5X6' IN CONC. <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />REINFORCING PANEL <br />I=I I —I I= <br />Q - <br />CO N <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />, ' . III —III —I <br />I—III=� I <br />DRILL 3/4"X6" MIN. HOLE <br />F PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE II II � I I- <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />6 MIN. LAP <br />° <br />«: El <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />`N ° <br />REMAIN FREE OF MORTAR. <br />NOTE: <br />"' z_ <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION <br />NOTES. <br />�+ <br />r • <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />° ° <br />;4" SAW CUT <br />( SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />#5 REBAR. MIN. 3 „ <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />C <br />16" MIN. COVER EA. WAY <br />00, <br />A SECTION <br />I) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />1 SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />rDF SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT <br />FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SS SCALE: 3/4" =1'-0" <br />SCALE: 3/4" = 1'-0" <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />Z M <br />0 <br />CD <br />Z <br />Q <br />a. <br />(nv) <br />C� <br />w <br />p <br />- <br />'U0 LU <br />F <br />o <br />(A <br />V) <br />0 <br />U <br />LU <br />1-- <br />a) Cl <br />C f0 M <br />2 -O M <br />No <br />® Co) <br />aim <br />O O <br />T N <br />a) <br />r LL CO <br />:5 6 �� <br />O Y <br />N <br />Y <br />N O- O <br />Lr)O V <br />`Q 0 <br />CL <br />� Q O <br />A1 <br />B D. <br />NCBDC <br />XV <br />i'i,iC)�Zo <br />�CV <br />�. <br />q_-__F� <br />0 R <br />UL .,,C <br />FLi <br />ff .q. <br />us <br />W.(y, py��. c <br />'M k l: �eI , <br />❑ ❑ <br />To the best of the Engineer's knowledge, information, and <br />belief, the structural plans and specifications contained <br />within these drawings comply with the Florida Building <br />Code 5th Edition (2014) Residential. Engineer's signature <br />and seal is only for the structural engineering portions of <br />the drawing pages bearing Engineer's signature and seal. <br />i <br />O <br />Z 0 <br />0 � r-, <br />>��o <br />M <br />Q � Ln <br />a. cn•Ld' <br />LL <br />CL <br />cl� U ClOC) <br />Q <br />E — <br />Z <br />WJo� <br />;�O <br />oZ <br />wLLo <br />LgZzI.— d <br />w <br />UH�No0 <br />r- z}z¢U <br />zQavOQQ <br />Z ? Z. Z <br />gpLLJ a W <br />U <br />OV)DCeo <br />OLU 04 <br />O <br />F aOz up <br />M <br />J <br />��"' <br />O <br />Lf) <br />(V <br />Lf� <br />L0 <br />Q <br />J <br />LU <br />LU Boa <br />azvo <br />0 <br />LU <br />o�,m2 <br />WC <br />Z <br />Z <br />l- <br />z �o� oz Z <br />U-i0 w O z 0 0 <br />J <br />U <br />o0wQ6 <br />N <br />O2 98 <br />Vww0u-za <br />O <br /><o_w20 <br />< Qoo <br />>- <br />Lr)0 <br />ao <br />�oZa <br />0 <br />re) <br />LU <br />aQ�� <br />O <br />LL <br />LL <br />Z <br />> <br />p <br />:5 <br />z <br />J <br />a <br />SCALE : AS NOTED <br />PLOT DATE: 12/7/2012 <br />TECH: FFLORES <br />VERSION NO. <br />100 <br />JOB NO: 17-5174 <br />SHEET NO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.