Laserfiche WebLink
TEMPORARY TAPE <br />'FLAP' TO HOLE) FLAP <br />HOUSE <br />WRAP <br />a SH A LNG <br />9' <br />ROUGH <br />OPENING <br />HOUSE <br />WRAP <br />SHEATHING <br />WINDOW FLASHING METHOD 'A -I' <br />A A WINDOW INSTALLER WILL CUT THE BUILDING PAPER AT A 45• ANGLE TO A POINT 9' UP AND 9' OUT <br />cl) FROM THE UPPER CORNERS OF THE ROUGH OPENING. <br />B. THIS WILL MAKE A 'FLAP' THAT WILL BE USED TO COVER THE HEAD FLASHING IN STEP 6. <br />TEMPORARY TAPE <br />'FLAP' <br />TO HOLD FLAP <br />�NOUSE <br />WRAP 7 <br />5HEATHING <br />ROUGH <br />OPENING <br />4' <br />SILL WRAP <br />SILL FLASHING <br />HOUSE <br />WRAP INSTALL FLEXIBLE <br />FLASHING <br />SHEATHING CORNERS AT <br />WINDOW SILL <br />WINDOW FLASHING METHOD 'A-1- <br />3-STEP PROCESS: <br />C2) A INSTALL SILL FLASHING (EXTENDING 4' BEYOND THE ROUGH OPENING ON EACH SIDE) <br />B. INSTALL CORNER SHIELD FLASHING (FASTEN WITH MOISTOP SEALANT OR EQUAL) <br />C. INSTALL SILL WRAP (MUST COMPLETELY COVER ROUGH OPENING SILL (INCLUDING CORNER SHIELDS) <br />METAL- FLASHING <br />DOUBLE LAYER SPLINE APPLIED <br />VERTICALLY (IF USING FELT, SPLIT <br />3b' - WIDE SHEET IN HALF) <br />2' TO 4' LAP AT <br />HORIZONTAL JOINT <br />2' TO 4' LAP AT <br />HORIZONTAL JOINT <br />SHEATHING <br />I <br />I . <br />BUILDING PAPER <br />HOUSEWRAP <br />I -CUT <br />WINDOW I �� <br />, <br />OPENINGS <br />SHEATHING <br />(BUILDING PAPER <br />, •`� <br />OR HOUSEWRAP) <br />, , <br />CARRIED I' TO 2' <br />BELOW BOTTOM <br />OF SHEATHING <br />4' TO b' LAP AT <br />VERTICAL JOINT <br />' <br />9' (b' MIN.) BEYOND <br />COINER BOARD <br />SHEATHING <br />WRAP DETAIL <br />SCALE: N.T.5. <br />TEMPORARY TAPE <br />'FLAP' TO HOLD FLAP <br />ZHOUSE <br />WRAP 7 <br />SHEATHING <br />CAULK BEHIND <br />WINDOW FLANGE <br />BEFORE <br />INSTALLATION. <br />WINDOW FLANGE - <br />—SILL FLASHING <br />HOUSE <br />WRAP <br />SHEATHING <br />i <br />WINDOW FLASHING METHOD 'A -I' <br />C3) A. APPLY A CONTINUOUS BEAD OF CAULKING: ON THE BACK SIDE OF THE WINDOW FLANGE. <br />B. INSTALL THE WINDOW ACCORDING TO THE MANUFACTURERS SPECIFICATIONS, <br />TEMPORARY TAPE <br />'FLAP' <br />TO HOLD FLAP <br />HOUSE <br />WRAP <br />HEAD FLASHING <br />JAM FLASHING <br />WINDOW FLANGE <br />HOUSE <br />WRAP <br />SILL FLASHING <br />SHEATHING <br />WINDOW FLASHING METHOD 'A-1' <br />OA INSTALL HEAD FLASHING OVER THE WINDOW FLANGE. <br />B. EXTEND THE HEAD FLASHING 8' BEYOND THE ROUGH OPENING ON EACH 51DE. <br />TO ALLOW MOISTURE TO BE DIVERTED TO THE OUTSIDE SURFACE <br />TEMPORARY TAPE <br />'FLAP'— TO HOLD FLAP <br />�NOUSE <br />WRAP <br />SHEATHING <br />JAM FLASHING <br />WINDOW FLANGE <br />HOUSE <br />WRAP <br />SILL FLASHING <br />SHEATHING <br />WINDOW FLASHING METHOD 'A-1' <br />4 A INSTALL JAMB FLASHING OVER THE WINDOW FLANGE ON EACH SIDE. <br />B. EXTEND THE JAMB FLASHING 4' ABOVE THE ROUGH OPENING AND 8' BELOW THE ROUGH OPENING, <br />C. INSTALL THE WINDOW ACCORDING TO THE MANUFACTURERS SPECIFICATIONS. <br />HOUSE <br />'FLAP' WRAP <br />----------------------------- 7 <br />EAD FLASHING <br />JAM FLASHING <br />HOUSE <br />WRAP <br />SILL FLASHING <br />--SHEATHING WINDOW FLANGE <br />WINDOW FLASHING METHOD 'A4 <br />A ALLOW THE BUILDING PAPER 'FLAP' TO DRAPE OVER THE HEAD FLASHING. <br />'FLAP' <br />WEATHER RESISTANT <br />CONSTRUCTION TAPE <br />HOUSE <br />WRAP <br />SILL FLASHING <br />FLANGE <br />LASE <br />WRAP <br />FLASHING <br />JAM FLASHING <br />WINDOW FLASHING METHOD 'A -I' <br />7) A APPLY WEATHER RESISTANT TAPE OVER THE 45• ANGLE CUT ON THE BUILDINGS PAPER <br />B. ON INSIDE PERIMETER OF WINDOW APPLY CONTINUOUS BEAD OF SEALANT OR EXPANDABLE FOAM <br />CV <br />O <br />CV <br />