My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
35960 Saddle Palm Way
Zephyrhills
>
Building Department
>
Building Plans
>
35960 Saddle Palm Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 1:17:13 PM
Creation date
2/19/2025 8:43:45 AM
Metadata
Fields
Template:
Building Plans
Street #
35960
Location
Saddle Palm Way
Contractor
Lennar Homes LLC
Building Plans - Permit #
20894
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L 11 �_.. <br />441 _ 1 1 '1 III I_ II I..._.. <br />- - - - - - - - - - - - - <br />I I <br />I I <br />— — — — — — — — — — — — — — - <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />EMBEDMENT INTO BLK.) <br />1 X4 FURRING <br />BLOCK HEADER <br />1/2" DRYWALL <br />2 x 8 45" DIAGONAL <br />BRACE(S) <br />BUILT UP PLWD. BUCK <br />SCRIBE (NOTCH) <br />BACKSIDE TO FIT ARCH <br />CONNECT W/ 8d NAILS <br />INSTALL WDW. SCREW ANCHOR - <br />INTO ARCH BLKG. PER <br />INSTALLATION DETAILS <br />BLOCK HEADER <br />1 X 4 FURRING <br />8d NAILS @ 8" O.C. AT BUCK <br />PROVIDE 2 x 8 DIAG. BRACE BT <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />2 x 8 VERT. BRACE(S) <br />BUILT UP PLWD. BUCK - <br />SCRIBE (NOTCH) BACKSIDE <br />TO FIT ARCH CONNECT W/ <br />8d NAILS <br />INSTALL WDW, SCREW---' <br />ANCHOR INTO ARCH BLKG. <br />PER INSTALLATION DETAILS <br />DOOR JAMB (REFER 1X4 1/2" DRYWALL <br />"RYWALL <br />DOOR JAMB (REFER <br />DOOR JAMB (REFER <br />1 X 4 <br />1/2" DRYWALL <br />TO SHT. SDW2-K1 <br />P.T. <br />TO SHT. SDW2-K1 <br />TO SHT. SDW2-K1 <br />CONN. DETAILS1X <br />FOR CONN. DETAILS <br />FOR CONN. DETAILSX 4FOR <br />ff <br />4 <br />LONG X 3/16"� <br />X 4 <br />FURRING <br />3/16"0 X 3" LONG FURRING <br />TAPCONS <br />3/16.0 X 3-1/2" LONG3-1/4" <br />FURRING <br />INTO <br />STAGGERED @ 16"BLOCK@ <br />TAPCONS STAGGERED <br />yC8TAPCON. <br />SPACING <br />1" <br />DETAIL <br />.. <br />O.C. 2-ROWS INTO <br />STAGGERED @ 16" O.C. <br />2-ROWS INTO <br />1X8 <br />PER MANUFACTURE <br />MASONRY THROUGH 1-1 /2„ DETAIL <br />MASONRY THROUGH <br />�� <br />3 DETAIL <br />1x4 P.T. & 1x8 P.T. <br />1x8 P.T. & 2x8 P.T. <br />"" <br />16" <br />OM <br />1X4 P.T. <br />3/16" x 3 -1/2" <br />DOOR JAMB (REFER <br />1 X 4 <br />1/2" DRYWALL <br />DOOR JAMB (REFER <br />W/ MIN <br />DOOR JAMB (REFER TAPCON <br />TO SHT. SDW2-K1 FOR <br />TO SHT. SDW2-K1 <br />T. <br />6EH <br />TO SHT. SDW2-K1 <br />CONN. ;DETAILS <br />FOR CONN. DETAILS <br />FOR CONN. DETAILS <br />10d @ 12" O.C. <br />1 X 4 <br />FURRING <br />2X8 P.T. WITH 3/16"fd X 3" <br />..Q'D <br />2X8 P.T. <br />LONG TAPCONS <br />STAGGERED @ 16" O.C. <br />2X8 <br />2x DETAIL <br />2 1/4" DETAIL <br />2-ROWS INTO MASONRY <br />3-1/4" <br />DETAIL <br />BUILDOUT @ OVER SIZE DOOR -WINDOW ROUGH OPENINGS <br />SCALE: N.T.S. <br />1/4" MAX 2'-0 <br />SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. & BUCK <br />8d NAILS AT 8" O.C. AT BUCK <br />(4) 10d NAILS INTO , <br />2 x 8 BRACE/ BLKG. <br />7/16" OSB> \" <br />ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA <br />(4) 10d NAILS INTO 2 x 8 <br />BRACE/ BLKG. <br />M\\\-2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 <br />A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU ---, <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />ARCH DETAIL J <br />SCALE: N.T.S. SS <br />um <br />2 x 8 BUCK - CONNECT TO BLOCK <br />VITH 114" x 31/4" TAPCON (1 1/4' MIN. <br />1/4" MAX EMBEDMENT INTO <br />SOLID BLKG. AT TOP BTWN. ARCH <br />BLKG. & BUCK <br />2 x 8 VERT. W/ (2)10d <br />NAILS AT EA. END <br />LEAVE A CUT OUT IN O.S.B. ON T <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />7/16" OSB ARCH PANEL <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL <br />THRU OSB INTO 2 x 8 <br />ARCH DETAIL rK <br />SCALE: N.T.S. SS <br />SECTION <br />A -A <br />8" <br />2'-0" <br />1/4" x 31/4" TAPCONS <br />—LEAVE A CUTOUT IN O.S.B. ON THE <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />FACE OF ARCH W/ (3) 10d NAILS <br />AT EA. END <br />PROVIDE TAPCON WITHIN <br />4" MIN. OF BRACE <br />START OF ARC <br />4' MAX. RAD. <br />SECTION <br />B-B <br />8" <br />PROVIDE 2x <br />PROVIDE (2) MIN. CONT. W/ (3) <br />TAPCON AT EA. SIDE 12d NAILS <br />BUCK - (1) WITHIN 4" <br />MIN. OF START OF <br />ARCH <br />START OF ARC <br />EQUAL 4' MAX. RAD. <br />PROPER INSTALLATION MAX. 8 <br />FILL SOLID <br />BOTH CELLSVIL, <br />#5 REB: <br />(TYP,) <br />STD. 90' <br />HOOK (1 <br />±5A <br />NOTCH WEB AT <br />FIRST 2 COURSI <br />UPLIFT CAPACITY = 805 # FOR 1 STRAP <br />=1610 # FOR 2 STRAPS <br />1-PLY PRE-ENGINEERED TRUSS <br />w SIMPSON HM9KT w/ (4) 1/4"x1 1/2"SDS <br />s f SCREWS & (5) 1/4" x 21/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16) 16d <br />SINKERS AND (7) 1/4"X21/4" TITEN = 2150 #) <br />BOND BEAM OR CAST <br />IN PLACE BEAM <br />RETROFIT TRUSS DETAIL <br />N.T.S. <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (3) #6 X 4%' WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />WALL USE (3)1/4" X 31/2" TAPCONS AT 16" <br />O.C. 12 <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2X6 #2 SYP @ 24" O.C. <br />ROOF SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />(5)12d NAILS SIMPSON <br />2X6 TO 2X4 H2.5A w/ (10) — <br />8d NAILS <br />JACK TRUSS PROVIDED BY—/ <br />TRUSS COMPANY OR 2x4 <br />#2 SYP @ 24" O.C. <br />4'-0" MAX SEE PLAN <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (2) #6 X 4'/" WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />WALL USE (2) 1/4' X 31/2" TAPCONS AT 16" <br />O.C. <br />SECTION @ ENTRY L <br />SCALE: 3/4" = V-0" SS <br />GLASS BLOCK INSTALLATION NOTES <br />A) <br />COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) <br />ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />C) <br />SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />D) <br />SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />1/4" EXPANSION BOLT (2 <br />E) <br />INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL PER ANCHOR) <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />REINFORCING <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) EXPANSION STRIP <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />REINFORCING AS FOLLOWS: <br />' PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />SEALANT <br />PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W/ <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />REINFORCING PANEL <br />SMOOTH. DO NO FURROW. <br />F) <br />PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />6" MIN. LAP <br />G) <br />SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />REMAIN FREE OF MORTAR. <br />NOTE: <br />H) <br />STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) <br />GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R16C <br />1) <br />AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />J) <br />APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />K) <br />A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />INSTALLATION OF GLASS BLOCK. <br />MASONRY WALL. SEE PLAN FOR <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />W.W.M. AT PERIMETER <br />(1) #5 BARS CONT. WHERE THIS CONDITION <br />TOP WITH MIN. 3" OCCURS <br />COVER 6'-011 F.F. <br />• D <br />.•. p .. o. I I I I_I I I_I I I_I I I —I <br />g . I-1 II_- <br />-1 <br />—III—III— <br />�. p ° •� I I WIT_I �I <br />—III T <br />GRADEI- <br />° <br />M p <br />z <br />r 01, " <br />p (2) #5 REBAR. MIN. 3" <br />16" MIN. COVER EA. WAY <br />SECTION AT DEEP MONO FOUNDATION <br />SCALE: 3/4" =1'-01, <br />FILLED CELL PER <br />FOUNDATION PLAN <br />+ <br />+ <br />UNACCEPTABLE INSTALLTION <br />DO NOT DO THIS <br />�, <br />kR <br />YP.) <br />♦� t2" <br />THE , <br />:S ,♦ <br />FILLED CELL INSTALLATION <br />X <br />TRUSS <br />2X4 SYP <br />EACH TRUSS <br />CONNECTOR <br />SEE LINTEL <br />SCHED. <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />' DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />(2) 1 Od NAILS @ 8" O.C. <br />TO TRUSS TOP CHORD <br />'Th PLYWOOD SHEATHING <br />BLOCKING AS <br />REQUIRED <br />TO SUPPORT <br />+ SOFFIT <br />+ + <br />+ <br />CENTER SOFFIT <br />PRECAST LINTEL <br />SEE ELEVATION <br />FOR OVER HANG <br />(MAX. 4'-011) <br />SECTION @ ROOF EXTENSION M <br />SCALE: 3/4" = V-0" SS <br />SIMPSON HTT4 w/ (18)10d x 1 <br />1/2" NAILS TO STUDS & (1) - <br />5/8" DIA. ALL THREAD ROD <br />EPDXIED w/ SIMPSON "SET" <br />EPDXY MIN. 6" EMBEDMENT & <br />3" MIN. EDGE DISTANCE <br />95 REBAR (TYP) <br />�0 <br />-*STD - HOOK (TYP.) <br />�- NOTCH'#;@ FIRST COURSE <br />SCALE: N.T.S. <br />QPP cur -PT n2 AND <br />FOR <br />RETROFIT FOR MISSING MSTAM STRAP <br />SCALE: 3/4" = V-0" <br />w <br />z <br />0 <br />u_ <br />O <br />w <br />U <br />2"x BOT. PLATE W/ (2)10d @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />AND NAILED W/ 8d COMMON @ <br />2X BOTTOM PLATE W/ 8d @ 4" <br />6" O.C. EDGES AND 12" O.C. FIELD <br />O.C., 2 ROWS STAGGERED <br />2x BAND JOIST W/ FACE NAIL 10d <br />@ TOP & BTTM CHORD, AND (8) <br />FACE NAILS 1 Od @ TRUSS VERT. <br />WEB <br />METAL SEAT PLATE <br />1 <br />NOTE: <br />LAP SHEATHING TO <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />SIMPSON HGAM10KTA @ 12" O.C. <br />w/ (4)1/4x1 1/2" SIDS SCREWS <br />INTO BAND JOIST & (4)1/4"x2 3/4" <br />TITEN INTO K.O. BLOCK <br />RETROFIT FOR MISSING EMBEDDED STRAP <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO <br />+= I I FILL 4 COURSES <br />SOLID <br />W/GROUT <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />OVERHAN <br />- jj. <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />1'-011 5'-0" <br />SCALE: N.T.S. <br />INISH FLO <br />° ° p #5 BAR <br />a p . :p . p• 101: e p ° <br />CENTERED W/ g <br />p ° 9 H IN TOP o <br />KNOCKOUT / N <br />° CHAIR BLOCK <br />MONO FOOTING p p A <br />SIZE AND REINF. PER PLAN 0 °. <br />AND SECTION DETAILS -I ° <br />CLEAN FILL <br />DIRT z <br />°• ° STANDARD c <br />0 90' HOOK N <br />#5 BAR IN <br />FILLED CELL <br />STEMWALL FOOTING SIZE AND <br />MONO TO STEMWALL FOOTING REINF. PERLAN AND STEMWALL <br />SECTION DETAILS <br />SCALE: 3/4" = V-0" <br />)TE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJEC <br />)NTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />EXISTING BOND BEAM. <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />EPDXY CAP TO PREVENT LEAKAGE <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY t 2") <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM <br />FILL CELL FULL HEIGHT W/ <br />NON SHRINK GROUT. <br />#5x6' EMBEDDED INTO <br />EXISTING FOOTING <br />DRILL 3/4"x5" MIN. HOLE <br />SET BAR IN EPDXY <br />EXISTING FOOTING <br />RETROFIT FILLED CELL DETAIL <br />(2) #5x6' IN CONC. <br />FILLED CELL <br />4" SAW CUT <br />A SECTION <br />1 SCALE: N.T.S. <br />SCALE: N.T.S. <br />LL .. <br />F cr-Lu <br />® ®;� z Iy <br />• % s r^ <br />®��,osarl,ee® <br />w <br />U W � <br />Z aa� a w <br />ioQ�= J <br />rat? wF �Nk z <br />�z o <br />3u1=-zW <br />w m 3 Z u Ja <br />wmQ w�O °- <br />� <br />az »u}� <br />w 0- O w Z Z v <br />Q I-O~ HacZwz <br />C� Y Z <br />- a w w Z w¢ O Z <br />Q a F- Q I— <br />�aLL�° m 12z u) <br />w <br />LLa2� ho=o � <br />�Z'Sz Zw>S2Z O <br />w w z-- <br />w (Dz LL _ <br />U o f Z Ui z C7z w 2 <br />>o0w wzF-O uj <br />Z <br />w _ uj <br />= U a H w Q <br />-aH <br />wpw~ Cw/i <br />a3 <br />m Ill <br />l0 N <br />m N In <br />o cn <br />Z jM w w <br />re In Q <br />mW 1/1 <br />���mmmm W ul d O W w <br />,Z 00 <br />Lu O N Q c/1 <br />Y <br />Z z � � o <br />W w 0 � <br />X a Z <br />Lu �; g < Lu <br />OC CD a z <br />a <br />i <br />O <br />Z <br />0 <br />N� <br />O <br />> M O <br />M <br />a U (D Ln <br />Ln <br />Q u- <br />F- p- . e <br />V a- <br />0 <br />Q DO <br />E <br />Z <br />W <br />J S <br />U) <br />ui <br />ou) <br />ui <br />V Z <br />Q <br />CD <br />SCALE : AS NOTED <br />DATE : 05-07-2018 <br />SHEET NO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.