My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
35981 Saddle Palm Way
Zephyrhills
>
Building Department
>
Building Plans
>
35981 Saddle Palm Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 1:55:09 PM
Creation date
2/19/2025 8:44:19 AM
Metadata
Fields
Template:
Building Plans
Street #
35981
Location
Saddle Palm Way
Contractor
Lennar Homes LLC
Building Plans - Permit #
20424
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />EJ <br />EJ <br />EJ <br />n c-) n <br />y�> w C)i <br />5PECIFICATION FOR LEDGER5 <br />(THE FOLLOWING SHALL APPLY U.N.O.) <br />LEDGER A (LA) - #2 SYP. 2x4 PT W/ 1/4" DIA. x 3" TAPCON5 AT 12" O.C. SET AT SHEATHING LEVEL FOR DIAPHRAGM EDGE NAILING (TYP. UNO AT LOWER ROOF TO UPPER WALL AT PARALLEL TRUSSES). <br />NOTE: THIS IS A REQUIRED TERMINATION FOR THE SHEATHING DIAPHRAGM, AND PROVIDES LATERAL DIAPHRAGM SUPPORT TO THE MASONRY WALL. A TRUSS S15TERED TO THE <br />WALL IS NOT AN ACCEPTABLE SUBSTITUTE, UNLESS THAT TRUSS IS ATTACHED TO THE WALL IN LIKE MANNER TO THAT INDICATED FOR THE LEDGER (MIN.). <br />LEDGER B (LB) - #2 SYP. 2x4 W/ (3) 0.131" x 3-1/2" R.S. NAILS AT EA. STUD (16" O.C. MAX.) SET AT SHEATHING LEVEL FOR DIAPHRAGM EDGE NAILING (TYP. UNO). NOTE: THIS IS A REQUIRED TERMINATION FOR <br />THE SHEATHING DIAPHRAGM, AND PROVIDES LATERAL DIAPHRAGM SUPPORT TO THE FRAME WALL, A TRUSS SISTERED TO THE WALL IS NOT AN ACCEPTABLE SUBSTITUTE, UNLESS <br />THAT TRUSS 15 ATTACHED TO THE WALL IN LIKE MANNER TO THAT INDICATED FOR THE LEDGER (MIN.). <br />LEDGER C (LC) - 12 SYP. (2) 26 PT W/ 5/8" DIA. x 8" A.B. AT 12" D.C. STAGGERED W/ 5IMP50N HU/HUC28 AT FACE ATTACHMENT OR HT516 AT TOP CHORD BEARING AT EA. TRUSS (TYP. UNO). <br />ALTERNATE EQUAL OR BETTER CONNECTORS ARE ACCEPTABLE. <br />LEDGER D (LD) - 12 SYP. (2) 26 PT WI (4) 5IMP50N 5D5256O0 SCREWS AT EA. STUD (l6" D.G. MAX.) W/ 5IMP50N HU/HUC226 AT FACE ATTACHMENT OR HT5W16 AT TOP CHORD BEARING AT EA. TRUSS (TYP. UNO). <br />ALTERNATE EQUAL OR BETTER CONNECTORS ARE ACCEPTABLE. <br />LEDGER E (LE) - "2 SYP. (2) 2x12 PT W/ 5/811 DIA. x 6" A.B. AT 12" O.C. STAGGERED W/ RT4 MIN. OR EQUAL AT TOP CHORD BEARING OR EQUAL AT FACE BEARING AT EA. TRU55 (TYP. UNO AT PERPENDICULAR <br />FLOOR TRUSS SUPPORT ALONG MASONRY WALL). <br />LEDGER F (LF) - 12 SYP. 2x8 PT W/ 5/5" DIA. x 8" A.B. AT 24" O.C. STAGGERED SET AT SHEATHING LEVEL FOR DIAPHRAGM EDGE NAILING (TYP. UNO AT FLOOR SHEATHING SUPPORT AT MA50NRY AT <br />PARALLEL FLOOR TRUSSES). NOTE: THIS IS A REQUIRED TERMINATION FOR THE FLOOR DIAPHRAGM, AND PROVIDES LATERAL DIAPHRAGM SUPPORT TO THE MASONRY WALL. A <br />TRUSS SISTERED TO THE WALL IS NOT AN ACCEPTABLE SUBSTITUTE, UNLESS THAT TRUSS 15 ATTACHED TO THE WALL IN LIKE MANNER TO THAT INDICATED FOR THE LEDGER (MIN.). <br />LEDGER G (LG) - #2 SYP. (1) 2x8 W/ (4) 5IMP50N 5D525412 SCREWS AT EA. STUD 116" D.C. MAX.J W/ 5IMP50N HU/HUC28 AT FACE ATTACHMENT OR HT816 AT TOP CHORD BEARING AT EA. TRUSS (TYP. UNO). <br />ALTERNATE EQUAL OR BETTER CONNECTORS ARE ACCEPTABLE. <br />LEDGER H (LG) - 12 SYP. (2) 2X8 PT W/ 1/2" DIA, X 811 TITANS AT 16" O.C. STAGGERED W/ 5IMP50N HU/HUG28 AT FACE ATTACHMENT OR HT516 AT TOP CHORD BEARING AT EA. TRUSS (TYP. UNO). <br />ALTERNATE EQUAL OR BETTER CONNECTORS ARE ACCEPTABLE. <br />LEDGER I (LI) - 12 SYP. 2X4 PT W/ 1/41' DIA. X 3" TAPCONS AT 611 STAGGERED W/ (1) 5IMP50N LU524 AT FACE ATTACHMENT AT EACH TRUSS BOTTOM CHORD AND (I) 5IMP50N H3 AT TOP CHORD ORIENTED <br />HORIZONTALLY. ALT. EQUAL OR BETTER CONNECTORS ARE ACCEPTABLE. AT TOP AND BOTTOM LEDGER, NAIL SHEATHING TO LEDGER W/ TYPICAL EDGE NAILING PATTERN. <br />LEDGER J (LJ) - #2 SYP. 2x4 PT W/ 1/4" DIA. X 3" TAPCON5 AT 4" O.C. STAGGERED W/ (1) 5IMP50N LU524 AT FACE ATTACHMENT AT EACH TRUSS BOTTOM CHORD AND (I) 5IMP50N H3 AT TOP CHORD ORIENTED <br />HORIZONTALLY. ALTERNATE EQUAL OR BETTER CONNECTORS ARE ACCEPTABLE. AT TOP AND BOTTOM LEDGER, NAIL SHEATHING TO LEDGER W/ 0.13111 DIA R.S. NAILS AT 3" D.C. <br />LEDGER M (LM) - #2 SYP. 2X4 V (3) 5IMP50N 5D525600 SCREWS AT EA. STUD 0611 O.C. MAX.) W/ (1) 5IMP50N LU524 AT FACE ATTACHMENT AT EACH TRUSS BOTTOM CHORD AND (1) 5IMP50N H3 AT TOP CHORD <br />ORIENTED HORIZONTALLY. ALT. EQUAL OR BETTER CONNECTORS ARE ACCEPTABLE. AT TOP AND BOTTOM LEDGER, NAIL SHEATHING TO LEDGER W/ TYPICAL EDGE NAILING PATTERN. <br />NOTE: AT LEDGERS C D OR H 5IMP50N HU/HUC28-2 OR HU/HUC28-3 MAY BE USED FOR 2 PLY OR 3 PLY HANGERED TRUSS ATTACHMENT RESPECTIVELY UN.D. <br />o(o1118 <br />L L c 1 <br />_J7 <br />CJ1 <br />:J7 <br />_J7 <br />=17 <br />=J7 <br />:J5 <br />1= <br />F— <br />q <br />LLJ <br />CL <br />D <br />o <br />� <br />Q <br />Q <br />W <br />z <br />w <br />q <br />CJ3o <br />ozE5 <br />s <br />°_j� <br />o p I� <br />z <br />< >- <br />Ld <br />pq <br />pp D <br />= N <br />Lf0 <br />a <br />c_ <br />D <br />�CJ5 <br />EJ <br />EJ <br />— <br />EJ7 <br />3J3 <br />FGl <br />ru <br />w <br />J1 <br />Li <br />u <br />7 <br />I <br />'v <br />I <br />EJ7V <br />EJ3A <br />FAA <br />J <br />L <br />EJ7VF <br />EJ7 <br />J7V <br />EJ7VG <br />J <br />M <br />E, <br />3/12 <br />VA <br />7VC <br />7VB <br />��L,J <br />Q CL <br />CL <br />E, <br />E, <br />7VA <br />Q <br />LL_ <br />LL_ <br />0 <br />E, <br />J5 <br />=J7 <br />Q <br />LL C] <br />z <br />E, <br />0 <br />� <br />LLJ <br />LL <br />�I�—rr-III <br />l_J <br />=J7 <br />E. <br />=J7 <br />X <br />E. <br />x2 <br />=J7 <br />E. <br />=J7 <br />E. <br />7J7 <br />C, <br />:J1 <br />C, <br />-J3 <br />C. <br />]> <br />trJ <br />w <br />n n n D D 71 1> D D D 1D D D <br />c, <br />D_ D_ D D ]> D D D 1> 1> w n n n w <br />< < < < � <br />njP <br />CJ1A <br />CJ1B <br />7 <br />7 <br />7 <br />7 <br />7 <br />7 <br />7 <br />7 <br />7 <br />7 <br />3 <br />15 <br />11 <br />UPLIFT CONNECTION CROSS-REFERENCE <br />MARK <br />SIMPSON STRONG TIE <br />USP MANUFACTURING, INC. <br />O <br />CONNECTOR <br />CAPACITY <br />FASTENERS <br />CONNECTOR <br />CAPACITY <br />FASTENERS <br />SYP <br />SPF <br />SYP <br />SPF <br />A <br />HETA20 <br />1810 <br />- <br />9 - 10d x 1 1/2" <br />HTA20 <br />1615 <br />1595 <br />10 - 10d x 11/2" <br />B <br />HE-FA16 <br />1810 <br />- <br />9 - 10d x 1 1/2" <br />HTA16 <br />1615 <br />1585 <br />10 - 10d x 11/2" <br />C <br />H2.5A <br />600 <br />535 <br />10 - 8d <br />RT7A <br />670 <br />565 <br />10 - 8d x 11/2" <br />D <br />H3 <br />455 <br />320 <br />8-8d <br />RT3 <br />610 <br />525 <br />8 - 8d x 1 112" <br />E <br />META20 <br />1450 <br />- <br />8 - 10d x 1 112" <br />HTA20-18 <br />1400 <br />1400 <br />10 - 10d x 1 1/2" <br />F <br />HHETA20 <br />2235 <br />- <br />11- 10d x 11/2" <br />- <br />- <br />- <br />- <br />G <br />H10A <br />1340 <br />1015 <br />18 - 10d x 11/2" <br />RT16A <br />1380 <br />1160 <br />9 - 10d x 1 1/2" & 8 - 10d <br />H <br />HTT4 <br />3610 <br />3105 <br />5/8" ANCH, j (18) 10d x 11/2" <br />HTT4 <br />2715 <br />- <br />5/8" ANCH. / 10d x 11/2" <br />J <br />HTT5 <br />4350 <br />3740 <br />5/8" ANCH. ( (26) 10d x 11/2" <br />HTT5 <br />3225 <br />- <br />5/8" ANCH. / (28) 10d x 11/2" <br />K <br />HD3B * <br />3130 <br />3050 <br />5/8" DIA. BOLTS <br />TDX2-TZ <br />2345 <br />- <br />2 - 5/8" DIA. BOLTS <br />L <br />HD5B * <br />4505 <br />3785 <br />5/8" ANCH. 3/4" STUD BOLTS <br />TDX6 <br />5320 <br />- <br />2 - 7/8" DIA. BOLTS <br />M <br />HD7B * <br />6645 <br />5650 <br />7/8" ANCH. 3/4" STUD BOLTS <br />TDX10 <br />7845 <br />- <br />4 - 7/8" DIA BOLTS <br />N <br />LUS26 <br />1165/1070 ** <br />1005/915 ** <br />8 - 10d x 3" <br />JUS26 <br />1115/1060 ** <br />- <br />8 - 10d <br />P <br />HUS26 <br />1550/3335 ** <br />133512820 ** <br />20 - 16d x 3 1/2" <br />HUS26 <br />1925/3295 <br />- <br />20 - 16d x 3 1/2" <br />Q <br />HUS28 <br />2000/4220 ** <br />1720/3125 ** <br />30 - 16d x 3 1/2" <br />HUS28 <br />2570/4345 <br />- <br />30 - 16d x 3 1/2" <br />R <br />MTS12 <br />1000 <br />860 <br />14 - 10d x 11/2" <br />MTW12 <br />1195 <br />1005 <br />14 - 10d x 11/2" <br />S <br />MTS16 <br />1000 <br />860 <br />14 - lod x 11/2" <br />MTW16 <br />1195 <br />1005 <br />14 - 10d x 11/2" <br />T <br />MTS20 <br />1000 <br />860 <br />14 - 10d x 11/2" <br />MTW20 <br />1195 <br />1005 <br />14 - 10d x 11/2" <br />U <br />MGT/MUGT <br />3965 <br />3330 <br />22 - 10d x (1) 5/8" ATR W/ 12" EMBED W/ SIMPSON "SET" EPDXY <br />V <br />LGT2 <br />2150 <br />1850 <br />(16) 16d SINKERS & <br />(7) 1/4" x 2 1/4" TITENS <br />LUGT2 <br />1850 <br />1810 <br />(16) 10d NAILS & <br />(5) 1/4" x 3" WEDGE BOLTS <br />'•X" <br />HTS20 <br />1450 <br />1245 <br />24 - 10d x 11/2" <br />HTW20 <br />1530 <br />1285 <br />24 - 10d x 1 1/2" <br />SPY <br />585 <br />535 <br />10 - 10d <br />SPT22 <br />685 <br />- <br />8 - 10d <br />SP2 <br />1065 <br />605 <br />12 - 10d <br />SPT24 <br />1030 <br />- <br />12 - 10d <br />HCP2 <br />645 <br />555 <br />12 - 10d x 11/2" <br />- <br />- <br />- <br />- <br />* MINIMUM 3" MEMBER <br />** REACTIONS ARE FOR ROOF LOADS ONLY <br />*** DO NOT DRIVE NAILS THROUGH THE TRUSS PLATE ON THE OPPOSITE SIDE OF THE TRUSS, WHICH COULD FORCE THE PLATE OFF OF THE TRUSS. <br />ALL EPDXY ANCHORS USP CIA-7000C <br />NOTE: DOUBLE FELT REQ'D ON ROOF PITCHES 3112 & LOWER. <br />LOADS; <br />ROOF - L/360 <br />FLOOR = L/480 W/ 3/8" MAX DEFLECTION <br />FLOOR JOIST SPACING SHALL BE MAX OF 19.2" O.C. FOR HARDWOOD & TILE AREAS & 24" O.C. FOR CARPET AREAS. <br />DROP HIP DETAIL <br />2-0-0 MAXIMUM 5PACIN6 ON VERTICAL5 OF (6) TRU55E5 <br />I OR 2 PLY <br />CARRIER <br />ka=0 CLEAR GAP DETWEEN (5) TRU55E5 (+/= (o11) <br />(• •) FASTEN EACH (5) TRUSS WEB TO EACH (A) TRUSS TOP CHORD AT EVERY <br />INTERSECTING POINT SHOWN ON THE HIP TRUSS SYSTEM BELOW. FASTEN TOP <br />CHORDS OF EACH (5) TRUSS TO THE TOP CHORDS OF (A) TRUSSES AT EVERY <br />OTHER INTERSECTING POINT 0s) INTERSECTING POINT TO BE FASTENED WITH 2-15d <br />COMMON NAILS OR 0.128 x 3" GUN NAILS. FASTEN BOTTOM CHORD OF (B) TRUSS TO <br />TOP CHORD OF CARRIER TRUSS WITH THE SAME SPECIFIED COMMON NAILS OR FUN 0% . 1 NY,.. L„ <br />NAILS AT 48"OC 4). W/ 2x CONT. LEDGER <br />IN LIEU OF PREFABRICATED HIP PLANING TRUSSES, (5) 2x4 SYP NO.2 OR NO.2 PT <br />STICK LUMBER (LAID FLAT WISE) MAY BE USED. FOLLOW FASTENING SCHEDULE AS <br />DEFINED FOR HIP PLANING TRUSSES RI, <br />STICK FRAMING SPLICING IS ALLOWED BETWEEN TRUSSES OR AT TRUSS <br />INTERSECTIONS SPLICING. <br />TO BE STAGGERED BETWEEN COMMON TRUSSES NO CATS REQUIRED UNDER STICK <br />FRAMING SPLICING. <br />MINIMUM LENGTH OF STICK FRAMING TO BE 5'-0" ON A HORIZONTAL PROJECTION <br />NOTE: 5EE 5HEET D=1 FOR ROOF FRAMING DETAIL5 <br />NOTES: <br />I. (2)12d TOENAILS EACH SIDE OF FLOOR TRU55 TO WALL OR BEAM <br />BELOW TYP. AT INT. BEARING UN.O. <br />• ALL TRU55 TO MASONRY STRAPS TO BE O UNO, <br />• ALL TRU55 TO FRAME STRAPS TO BE (D U.N.D. <br />ROOF FRAMING PLAN - A <br />SCALE: 1/4" - I' -Olt <br />Y <br />DAMS BEWS <br />DESIGN GROUP <br />150 STATE STREET EAST <br />OLDM"P, RLORMA 34677 <br />813. 925 . 1300 TE L <br />813. 925.1800 FAX <br />W W W.DAVISBE V&COM <br />TA 4PA • DEIVVER <br />EST. 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.