Laserfiche WebLink
CROSS BRACING DETAIL (TYP.)r1 <br />SCALE: N.T.S. <br />TRUSS NOTES: <br />CONY. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0' <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. pg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />TB <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP - <br />MAX & EACH END ALTERNATE A CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. —� <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />2X4 CONT. AT <br />T & B CHORD <br />TRUSS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) VX 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 RAFTERS FOR SPANS 4FT TO 8FT <br />2X4 RAFTERS FOR SPANS LESS THAN <br />4FT @ 2'-0"0.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO BEAM <br />CONC. MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�A TRUSS <br />SSES <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE: N.T.S. <br />z <br />O <br />Q <br />w <br />J <br />W <br />w <br />w <br />U) <br />WOOD POST. SEE FLR <br />PLAN FOR SIZE & BASE <br />CONNECTION SEE <br />PLAN <br />--------.- =-- *- <br />�Fl% <br />411 <br />PORCH SLAB SEE <br />FOUNDATION PLAN <br />HIP <br />G.T • <br />EXTEND <br />SLAB 1 1/2" <br />(2) #5's CONT. T&B w/ <br />#3 STIRRUPS AT 4'-0" <br />WHEN DEPTH <br />EXCEEDS 30" <br />RADE <br />N <br />T <br />2 ENTRY PORCH SILL 14 <br />SCALE: N.T.S. <br />WOOD OR MASONRY ABOVE <br />MASONRY PIER SEE FLOOR PLAN <br />FOR COLUMN INFO WOOD OR MASONRY i <br />INTEGRATE MASONRY ABOVE MASONRY <br />KNEEWALL INTO CMU BASE OR PIER SEE FLOORI Z <br />MAIN HOUSE PER ELEVATION IF PLAN FOR COLUMN <br />REQUIRED INFO <br />1 _ 1 <br />1 I MASONRY KNEE WALL MAX 3 = <br />1 ' 1 COURSES w/ TOP K.O. COURSE CMU BASE W/ (1) #5 1 I 1 <br />W/ (1) #5 CON <br />T <br />. FILLED CELL VERTICAL EACH <br />SPAN MAX 6'-8" CORNER FILLED I 1 <br />MAX 3 SOLID. SEE ELEV. j <br />COURSE FOR BASE SIZE <br />(3) #5's EA. WAY <br />1 1 <br />---=-- x---------. 1 . <br />'a u. <br />8 <br />SLAB PORCH SLAB SEE <br />Ak <br />LEVEL FOUNDATION PLAN <br />(2) #5's CONT T&B w/ _' z <br />CONTRACTOR TO INSTALL SEE CUT <br />MIN 3" x 3" WEEP HOLE SECTION FOR #3 STIRRUPS AT 4'-0" r <br />ALONG w/ PITCHING SLAB MORE INFO WHEN DEPTH <br />EXCEEDS 30" V-4-1 <br />TO DRAIN WATER <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILL 16 <br />SCALE: N.T.S. <br />SIMPSON LSTA18 <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />w/(12)10dNAILS-----------1-------- 15tt FLAN <br />A -A ALTERNATE BLOCKING SIMPSON HADER&(6) 1 <br />CENTERED AT I I I I I FOR CANT. <br />DETAIL @ INTERIOR BEARING SPLIT TO TIE <br />16d INTO HEADER & (6) <br />10d INTO BEAM - SEE <br />3 BEAMS TOGETHER I I I I I <br />I I ROOF PLAN FOR MORE I I I <br />I INFO <br />SCALE: N.T.S. I I I I I I <br />WOOD TRUSS I SEE FLOOR PLAN FOR I <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING I COLUMN SIZE & BASE I I I 7/16" OSB FLITCH PLATE <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS SEE FLOOR PLAN I I CONNECTION INFO I I I REQ'D ONLY WHEN <br />TYP. WOOD TRUSS BLOCKING DETAIL FOR COLUMN SIZE L--- J INDICATED ON BM. <br />SCALE: N.T.S. STANDARD HEEL HEIGHT &ADDITIONAL INFO. — — — L _ _ _ _ _ _ _ J L _ _ _ _ — — — — — SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A INDICATED ON <br />SC EDU E/PL.ANM OPTION B CONNECTION INFO OPTION C. <br />_ft/___EXTERIORSHEATHING COMMON BM. TO POST ATTACHMENT <br />PORCH SLAB SEE <br />FOUNDATION PLAN <br />1 '4e I <br />EXTEND <br />SLAB 1 1/2" <br />(2) #5's CONT. T&B w/ <br />#3 STIRRUPS AT 4'-0" <br />WHEN DEPTH <br />EXCEEDS 30" <br />GRADE <br />04 <br />l� <br />PORCH SILL r15 <br />SCALE: N.T.S. <br />SEE FLOOR PLAN SEE PLAN FOR <br />FOR BRG. OR REQ'D STAIR INFO. <br />NON-BRG. WALL IF CONCRETE STAIRS <br />FORMED &POURED <br />�� W! <br />2(1) #5 EACH STEP <br />* 0- <br />w <br />4" z C <br />PORCH SLAB SEE 0- N <br />FOUNDATION PLAN iw <br />U) Z <br />W/ #3 STIRRUPS AT �I z <br />4'-0" WHEN DEPTH <br />EXCEEDS 30" LOWER OR <br />GARAGE SLAB <br />114„ SEE PLAN <br />LARGE STEP DOWN rj7 <br />SCALE: N.T.S. <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />ATTACHED PER <br />NAILING SCHEDULE <br />CONTRACTOR TO INSTALL SEE CUT <br />MIN 3" x 3" WEEP HOLE SECTION FOR #3 STIRRUPS AT 4'-0" r <br />ALONG w/ PITCHING SLAB MORE INFO WHEN DEPTH <br />EXCEEDS 30" V-4-1 <br />TO DRAIN WATER <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILL 16 <br />SCALE: N.T.S. <br />SIMPSON LSTA18 <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />w/(12)10dNAILS-----------1-------- 15tt FLAN <br />A -A ALTERNATE BLOCKING SIMPSON HADER&(6) 1 <br />CENTERED AT I I I I I FOR CANT. <br />DETAIL @ INTERIOR BEARING SPLIT TO TIE <br />16d INTO HEADER & (6) <br />10d INTO BEAM - SEE <br />3 BEAMS TOGETHER I I I I I <br />I I ROOF PLAN FOR MORE I I I <br />I INFO <br />SCALE: N.T.S. I I I I I I <br />WOOD TRUSS I SEE FLOOR PLAN FOR I <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING I COLUMN SIZE & BASE I I I 7/16" OSB FLITCH PLATE <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS SEE FLOOR PLAN I I CONNECTION INFO I I I REQ'D ONLY WHEN <br />TYP. WOOD TRUSS BLOCKING DETAIL FOR COLUMN SIZE L--- J INDICATED ON BM. <br />SCALE: N.T.S. STANDARD HEEL HEIGHT &ADDITIONAL INFO. — — — L _ _ _ _ _ _ _ J L _ _ _ _ — — — — — SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A INDICATED ON <br />SC EDU E/PL.ANM OPTION B CONNECTION INFO OPTION C. <br />_ft/___EXTERIORSHEATHING COMMON BM. TO POST ATTACHMENT <br />PORCH SLAB SEE <br />FOUNDATION PLAN <br />1 '4e I <br />EXTEND <br />SLAB 1 1/2" <br />(2) #5's CONT. T&B w/ <br />#3 STIRRUPS AT 4'-0" <br />WHEN DEPTH <br />EXCEEDS 30" <br />GRADE <br />04 <br />l� <br />PORCH SILL r15 <br />SCALE: N.T.S. <br />SEE FLOOR PLAN SEE PLAN FOR <br />FOR BRG. OR REQ'D STAIR INFO. <br />NON-BRG. WALL IF CONCRETE STAIRS <br />FORMED &POURED <br />�� W! <br />2(1) #5 EACH STEP <br />* 0- <br />w <br />4" z C <br />PORCH SLAB SEE 0- N <br />FOUNDATION PLAN iw <br />U) Z <br />W/ #3 STIRRUPS AT �I z <br />4'-0" WHEN DEPTH <br />EXCEEDS 30" LOWER OR <br />GARAGE SLAB <br />114„ SEE PLAN <br />LARGE STEP DOWN rj7 <br />SCALE: N.T.S. <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />ATTACHED PER <br />NAILING SCHEDULE <br />" 2x4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />- <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />- -- <br />16" FLOOR SYSTEM <br />FLOOR GIRDER <br />SEE PLAN FOR <br />SEE PLAN FOR <br />DIRECTION <br />CONNECTION <br />SECTION @ <br />FLOOR <br />CONNECTION 22 <br />SCALE: N.T.S. <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A F_� A <br />SEE PLAN FOR <br />WAM VV <br />I <br />I <br />I <br />I <br />_J <br />SEE PLAN FOR <br />CANT. IF <br />INDICATED <br />CORNER- SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />XX <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S. <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALLr7 <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY w/ <br />(3) ROWS OF 16d NAILS <br />AT 24" O.C. <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF 2 PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d AND J/S6 FOR MORE INFO. <br />NAILS TO LEDGER VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE: 1/2" = 1'-0" <br />Y2' CDX PLYWOOD OR Y/s' O.S.B. <br />SHEATHING REQ'D FROM BOTTOM <br />OF WALL TO ROOF SHEATHING <br />ABOVE W/ 8d NAILS @ 4" O.C. IN <br />FIELD, EDGES & BOUNDARIES <br />. • . <br />lip <br />v a <br />MIDDLE GARAGE OR <br />LOWER SLAB <br />SEE PLAN <br />_d. d. <br />T C� L <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />J MIN. (2) 2x8 #2 SYP <br />HEADER. SEE Q/S4 FOR <br />REQ'D CONNECTIONS <br />� <br />2x4 #2 SPF STUDS @ <br />�y-1- <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />TOP <br />2x4 #2 SYP P.T. PLATE W/ <br />EPDXY ANCHOR OR <br />J-BOLT OR YZ TITEN HD <br />2, <br />ANCHOR @ 24" O.C. W/ <br />4 <br />MIN, 6 EMBEDMENT <br />° <br />4. <br />. I . <br />a <br />d °. <br />° O <br />. <br />Q <br />MAIN HOUSE <br />° <br />° <br />SLAB <br />d A <br />° <br />(2) #5's CONT. T&B <br />° <br />w/ #3 STIRRUPS AT <br />; <br />4'-0" WHEN DEPTH <br />e <br />e <br />. <br />EXCEEDS 30" <br />s ,' <br />° <br />a. <br />e A <br />8. <br />1'41 <br />SECTION GARAGE MONO 21 <br />SCALE: N.T.S. <br />�s <br />J > W <br />t� cQ. N o <br />C :,9 <br />_mx <br />H eo o <br />Q •t N � <br />°; w <br />r c c <br />aa�=a <br />3: cc <br />4 <br />A m m .a <br />o •— ca w <br />= d to <br />G <br />a <br />o <br />O� <br />OF <br />FLdI <br />1/lltl)lilEti���, <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />EQ 50, <br />v 4 6 "M O J <br />LL lL <br />W �N01 U. <br />a a <br />J Lo a u_ a Y rj <br />0 <br />_= rAS R90 <br />ca m <br />j , M Z U <br />a o ❑oo <br />Z <br />W <br />U0 <br />z ry o <br />Q <br />Ln <br />- N <br />zC1c� <br />W W <br />V � <br />0 11 w s <br />�N <br />� c <br />'® LLu j <br />c �0 <br />Q Y <br />coco <br />S� <br />ocl� Jz <br />W <br />M Q <br />Q LL_NO <br />c p o2 <br />I— IVY QO <br />Z E Ra°� <br />d <o wZ <br />L' L W <br />co r_ p0 <br />z M O< QW <br />m J oi� Gw <br />5 a ° �z <br />8 os go <br />W aLL az <br />T y (! W <br />rn y R.0 1, <br />°LL Z3 <br />J J= 0 <br />o w� �_ <br />v il�dTyT0 3 <br />O <br />> Ln <br />O <br />N O <br />Co1'— <br />�1 <br />/T M T <br />N <br />°° = Ltd <br />75 <br />� O <br />3: N <br />M O Ln <br />r <br />QM T <br />6 2�1 M coo <br />M 7 O N LO Z <br />Z E T N c <br />C o w <br />a 0 a o <br />JOB NO: 23-06104 <br />SCALE: AS NOTED <br />SHEET NO. <br />D1 <br />