Laserfiche WebLink
111 Il I I 1 _ 11 L <br />(FOR EPDM ROOFS ONLY) <br />SINGLE PIPE PORTAL SECTION <br />31' = 1'-011 <br />TOP OF FLASHING CAPPED — <br />OR ROLLED INTO PIPE <br />APPROX. 1" [25MM] <br />PLUMBING VENT STACK. FRESH AIR <br />INTAKES SHALL NOT ENCROACH <br />WITHIN 10'-0" OF VENT. <br />SOFT METAL PIPE FLASHING <br />n 11 u <br />1 <br />SET FLANGE IN ROOF CEMENT. <br />PRIME FLANGE BEFORE STRIPPING. <br />(3LUMBING VENT SECTION <br />3 = 1 -011 <br />1/4" PERIMETER - <br />COORDINATE WITH <br />MECHANICAL DRAWINGS <br />ADAPTER RING AS REQUIRED <br />EPDM CAP, SIZE AS REQUIRED. <br />"ALUMNI -FLASH" BASE SET <br />IN ROOF CEMENT <br />ROOF CEMENT OR SEALANT AT <br />PENETRATION TO MEMBRANE <br />JUNCTURE. <br />MEMBRANE STRIPPING <br />ROOF MEMBRANE <br />ROOF CEMENT OR SEALANT <br />AT PENETRATION TO <br />MEMBRANEJUNCTURE. <br />ROOF MEMBRANE <br />MEMBRANE STRIPPING <br />I. 11V I LI\L.I I\/MINI\ — VVl%V VIVLrrrlLL r\L. L.V rr LLI. <br />2. INSTALL COUNTERFLASHING AND RECEIVER BEFORE SETTING UNIT. <br />3. AT LEAST ONE SIDE OF THE ROOF OPENING SHALL BE SUPPORTED BY A ROOF <br />FRAMING MEMBER. THE STEEL ANGLE FRAMING IS DESIGNED TO CARRY A <br />MAXIMUM DEAD LOAD OF 150 LBS. FOR HEAVIER LOADS, OR IF ROOF FRAMING <br />IS NOT AS SHOWN. VERIFY DESIGN WITH ARCHITECT. <br />4. THE ROOF CURBS SHALL INCLUDE A WOOD NAILER, A GALVANIZED SHEET <br />METAL CAP WITH SPACE BETWEEN FOR AT LEAST 3/8" THICK ROOF FLASHING <br />MATERIAL. THE ROOF CURBS MAY BE WITHOUT INSULATION. TOP OF ROOF <br />CURB SHALL BE INSTALLED LEVEL, SHIMMED FROM BENEATH SO TOP OF CURB <br />WILL BE AT LEAST 12" HIGHER THAN ALL ADJACENT ROOF SURFACES. <br />THERMAL INSULATION <br />ROOF DECK <br />NOTE: CONFIRM THAT ROOF DETAILS ARE <br />COMPATIBLE WITH EXISTING ROOFING <br />SYSTEM AND CONDITIONS. IN CASE OF <br />DISCREPANCIES, NOTIFY ARCHITECT. <br />i <br />I\LYr 1 VILL 1 L/\1 In IJV 1. <br />COORDINATE WITH MECH <br />i <br />c <br />rn 1�0 N o <br />a) <br />o � <br />c -0 <br />co cm o <br />c WO m <br />'E .. J <br />C O — <br />ca E — <br />a) <br />U)o0 <br />w <br />v�p = ~�aa <br />} awf..0 ataw= <br />Paz 2w<waMQ2 <br />mow_ z <br />Uj in <br />m Jif-m 5wwLLUW Q <br />w a U d Ix w W= z m n- N <br />wU)ww0(LU57:oz0 <br />=�_MCLMM<wgELM< <br />a(D <br />a00 <br />a l�QP��M <br />( D <br />Digitally signed <br />-*- <br />by Dawn J 0Z <br />Gunter <br />. . <br />Date:2019.07.� LL <br />22:12:22 -04'0( <br />oCc <br />0 <br />goo <br />3 � M <br />Ncj <br />VLoLo <br />o�v <br />C cv) <br />U O C C W) <br />O Ln M O <br />E ti t n v <br />S m c T x <br />N(nHLL <br />~ <br />M <br />M <br />- N <br />N <br />p <br />N <br />1A <br />is> <br />Q A <br />N <br />� <br />Q <br />U <br />c <br />" <br />O <br />N <br />v�i <br />U <br />oM <br />6 f <br />L <br />in <br />co <br />V <br />d <br />J <br />u- fn <br />;:: cn <br />U <br />� <br />� a <br />w U <br />a cn <br />°6 0 co <br />Z <br />m O <br />0 co <br />LL <br />co Of <br />cn <br />} <br />m <br />Ljj <br />00 F- <br />a <br />to 0 <br />0 <br />ME <br />Q <br />U <br />o <br />Z >0 <br />ILL] <br />(0 <br />0 <br />W Ui <br />Q J_ <br />rn <br />V _ <br />O <br />J <br />N <br />04 <br />a <br />w <br />N <br />LL <br />O <br />ON <br />w <br />N <br />o <br />N <br />0 <br />m <br />� <br />W <br />J M <br />C) <br />lii <br />w_ Y <br />N <br />O <br />'=3 <br />w <br />0 <br />W U <br />m <br />2l RTU ROOF CURB DETAIL <br />�- 3 =1-0 <br />ENLARGED ROOF PLAN <br />1/411 = 11-011 <br />Al 04 <br />COPYRIGHT © 2018 WALGREEN CO. <br />f; <br />