Laserfiche WebLink
ROOF FINISH <br />PER ELEVATION <br />12 <br />—15 ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL <br />26 <br />4 = <br />- <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />12 <br />5 MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL <br />2713/4 <br />= <br />- <br />CV <br />1 <br />o <br />r <br />CV <br />N <br />CV <br />1-4" <br />211 211 <br />1 11 <br />FALSE FOAM LOUVER DETAIL TYP <br />8 <br />6" <br />1" <br />4" 1" 4" <br />CV <br />CV <br />1 00 <br />O 00 <br />EPS <br />c.4 <br />FOAM iv <br />BRACKET DETAIL <br />9 <br />PROVIDE FILLED SOLID <br />CMU ABOVE LINTEL TO <br />TIE BEAM <br />FLASHING <br />CASING BEAD WITH WEEP HOLES <br />PT 2X8 LEDGER ATTACHED TO <br />WALL'N/ 3/8" X 5" TITEN HD AT <br />12" O.C. STAGGERED <br />(S)H10A-2 <br />ROOF FINISH PER ELEVATION <br />UNDERLAYMENT <br />ELEV AT 8'-0" <br />_ _ _ <br />12 T.O.M. <br />5 ROOF SHEATHING <br />(S)A23 <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />~' 2'-0" ALUMINUM WRAP <br />(S) A23 ALUMINUM SOFFIT <br />PT 2X4 LEDGER ATTACHED TO <br />WALL W/ 3/16" TAPCONS W/ <br />MIN 2-1/2" EMBEDMENT 6" O.C. <br />BTM AT T-6" <br />SOFFIT DETAIL <br />10 <br />it <br />/4 = <br />- <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />STAGGERED <br />CV <br />0 0 0 <br />0 0 <br />8" 1'-0" 1'-0" 1'-0.1 <br />LEDGER DETAIL <br />11 <br />T <br />CASING BEAD <br />7/8" STUCCO WITH WEEP <br />4" STUCCO <br />BAND <br />OVER FRAME SCREED OVER <br />FLASHING <br />8 <br />A5 <br />WEEP <br />SCREED <br />lkl. <br />512 <br />x <br />ow <br />CV = <br />z <br />4" STUCCO <br />BAND <br />5/8" <br />STUCCO <br />OVER <br />MASONRY - <br />PEI <br />FRONT ELEVATION B <br />1 /411 = 1'-011 <br />ELEV AT 18'-0" <br />- - - - - - <br />T.O.P. <br />c=7 7/8" STUCCO <br />NLu C,, OVER FRAME <br />ELEV AT 10'-0" <br />z <br />2ND FLOOR FF <br />JOINT <br />- -CONTROL <br />ELEV AT V-8" <br />T.O.M. <br />A/C UNIT <br />MID WALL <br />AND PAD <br />WEEP SCREED <br />io <br />5/8" STUCCO <br />F_ <br />OVER <br />MASONRY <br />ELEV AT U-0" <br />1 ST FLOOR FF <br />GRADE LINE <br />3AREAR ELEVATION B <br />- 11-011 <br />1'-01, <br />12 <br />5! <br />A/C UNIT <br />AND PAD�2'-0" <br />1 <br />SHINGLE <br />ROOF <br />Iice <br />1 <br />16-8" <br />18'-8" <br />16-8" <br />= <br />�-7/8" <br />CV <br />STUCCO <br />Z <br />OVER FRAME <br />CONTROL JOINT <br />CONTROL JOINT <br />�_5/8" STUCCO <br />OVER <br />MID WALL <br />MASONRY <br />WEEP SCREED 19 <br />GRADE LINE <br />RIGHT <br />ELEVATION B <br />1 /811 = 1'-011 <br />12 <br />12'-0" 13'4" 12'-0" <br />N = " OVER FRAME <br />-i - - - - CONTROL JOINT <br />_ - ELEV AT 18'-0" <br />T.O.P. <br />CASING BEAD WITH <br />WEEP SCREED OVER <br />FLASHING <br />ELEV AT 10'-0" <br />2ND FLOOR FF <br />_ ELEV AT 8'-8" <br />T.O.M. <br />WEEP SCREED <br />ELEV AT 18'-0" <br />T.O.P. <br />ELEV AT 10'-0" <br />2ND FLOOR FF <br />ELEV AT 8'-8" <br />T.O.M. <br />'-0" <br />A/C UNIT <br />AND PAD <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />ELEV AT 18'-0" <br />T.O.P. <br />ELEV AT 1 U-0" <br />2ND FLOOR FF <br />ELEV AT 8'-8" <br />T.O.M. <br />%/8" STUCCO <br />OVER MID WALL <br />MASONRY-, WEEP SCREED <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />GRADE LINE <br />LEFT ELEVATION B <br />1 /811 = 1 '-011 <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />�p\" AUG 0 3 2D22 <br />. RT I'4,_ 'At' EW ASSIST <br />✓irtl.Aai F,;-\ Iew Aclstw, fnc. <br />'fans Pev;ew 1 011) �;., � ?nd apOr. <br />for con l to <br />Icy, <br />Edition by Deora Anne Klan <br />a <br />G!-W.-u <br />ROOF PLAN B <br />1 /811 = 1'-011 <br />- A1, ^1 AA11 <br />1 P <br />1'-0'0iy <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A 'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />ROOF GENERAL NOTES: <br />" G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9112) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC, SECTION R806 <br />FORMULA = S.F. / 300 (1/300) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA 1 = 1268 SQ FT <br />VENTILATION REQUIRED = 609 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 306 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =1197 SQ IN <br />ATTIC AREA 2 = 445 SQ FT <br />VENTILATION REQUIRED = 214 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 108 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =425 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET MEASURE <br />VERTICALLY) BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />• OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />• SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />" LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACEABILITY TO MANUFACTURER AND PRODUCT <br />N <br />0 <br />`"- '.' <br />o <br />00 <br />Ln <br />AVy}. J Pt <br />Cz <br />C <br />a <br />J <br />0 <br />w <br />0 <br />z <br />N <br />W <br />>LO 0,� o <br />L O �? u <br />c') N <br />N <br />cn <br />�% 7 00 « M <br />� <br />0 � 9 <br />Tr <br />v—! <br />O m: Q <br />� U 10 <br />• <br />to <br />d <br />U L" aN c <br />o <br />>V <br />F- a a) <br />w <br />W <br />H~ w J w 2 O 2 <br />00, <br />n/ <br />LL 0 <br />Q F- <br />�� J o��< <br />aa��aOZo0:0020z <br />JO <br />¢< <br />�Q <br />OZ <br />cn�nap�cnww�cn�Oo:¢pa�� <br />�LL <br />�aw`1dZW�V�¢ <br />OW =O 5Q <br />¢ <br />LL <br />F-�w <br />0 <br />Z CV <br />O� <br />W ti <br />0 F_ CM O <br />Q w CO � <br />(n <br />LL I. <br />F- WaCM <br />W a T- <br />Z V F_ <br />Z ?� <br />W <br />JO <br />O <br />mi <br />N <br />N <br />0 <br />N <br />ti <br />N <br />0 <br />0 <br />co <br />W <br />M <br />N <br />O <br />o <br />0 <br />0 <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />CV <br />0 <br />N <br />(V <br />N <br />CD <br />00 <br />Ln <br />00 <br />A <br />r <br />o <br />� <br />o <br />� <br />; <br />o <br />0 <br />N <br />0 <br />M <br />0 <br />4 <br />0 <br />6 <br />0 <br />Or,� <br />0 <br />�- <br />CO <br />u <br />Z z <br />-z <br />OWW <br />wwv) <br />5: <br />O <br />Uo—o <br />F_o <br />a <br />0xwm <br />Z <br />w F=-- a <br />� F- <br />Q <br />�m0Z <br />F- � <br />fV <br />('O <br />Z w <br />00 <br />�mzw <br />10.cr2z <br />M <br />_Zz <br />(� <br />w N <br />Q <br />VLZn <br />. <br />Z <br />Z <br />�a0 <br />U <br />a <br />OV <br />o <br />00 <br />z <br />z <br />w <br />W <br />J <br />" <br />W <br />M <br />LAST PLOT DATE <br />>r <br />Apr. 25, 22 <br />z <br />0 <br />EXTERIOR <br />ELEVATIONS B & <br />ROOF PLAN <br />