Laserfiche WebLink
I• <br />Y <br />•o <br />12'-0" <br />m <br />LANAI SLAB: <br />3 y2" GONG. SLAB ON <br />6RADE (2500 PSI I c� I 12" WIDE GONG. <br />MIN.) w/ 6x6-W1.4xW1.4 I I TURNDOWN EXTENDED <br />LU <br />MESH OR FIBER MESH D I MIN, 12" BELOW 6RADE <br />ON q5% GOMPAGTED I a <br />FILL OR VIR61N 501L. <br />i <br />HVAG 2 q 2 <br />UNIT 5D-I I 5D-I 3 Y2" STEP 5D-I I 5D-1 <br />\ <br />I <br />� I I <br />• I I FRENCH DOOR REGE55 <br />PER MANUFAGTURER5 <br />{ IN5TRUGTION <br />t I <br />I <br />I GONGRETE SLAB: I I • <br />' 3 y2" GONG. SLAB ON <br />6RADE (2500 P51 MIN.) W <br />6x6-W1.4xW1.4 MESH OR <br />? FIBER MESH OVER 6 MIL. <br />POLY ON q5% GOMPAGTED I <br />FILL OR VIR61N SOIL, I <br />I € I <br />NOTE: REFER TO BLOGK <br />PLAN FOR ALL DOWEL <br />o LOCATION DIMENSIONS. , <br />� I <br />•I I I <br />I <br />i <br />2 I <br />3 Y2 STEP I <br />I <br />4 4 <br />I <br />t 3 Y2" STEP <br />5D_ 1 <br />—' _3 Y2" STEP <br />I <br />•I I 6 <br />SD-1 <br />o I <br />I � I <br />I I <br />5 <br />5D-I <br />5D-I \ 5D-I <br />SD -I SD -I I <br />I <br />I I. <br />6ARA6E SLAB: <br />5 Y2" GONG. SLAB ON 6RADE <br />(2500 P51 MIN.) w/ 6x6-W1.4xW1.4 <br />MESH OR FIBER MESH OVER 6 <br />MIL. POLY ON q5% GOMPAGTED <br />FILL OR VIR61N SOIL. <br />I� <br />N <br />w <br />n ' <br />a <br />I <br />2 <br />5D- <br />5 <br />5D- <br />0 <br />N <br />LEGENi7 <br />• ® INTERIOR BEARING WALL <br />• _ _ _ BEARING WALL ABOVE <br />• BEAM / HEADER <br />• LOCATION AND EXTENT OF SHEARNALL <br />EXTENT OF OVERFRAMIN6 <br />L' -'J <br />•- - —INDIGATE5 I/8"A" SAW GUT CONTROL JOINT <br />INDIGATE5 LOCATION OF REINFORCED GMU GORE <br />W. (5EE NOTES) <br />J L METAL HAN6ER <br />INDIGATE5 P05T ABOVE. PROVIDE 50LID <br />BLOGKIN6 UNDER P05T OR JAMB ABOVE. <br />REFER TO 5-0.0 FOR TYPICAL <br />STRUCTURAL NOTES & SCHEDULES <br />seal;G. <br />® � B <br />Leff <br />=� e <br />gip•, <br />r�r L0ROa'`� <br />© cop <br />Strd if 11111nnq, Inc, <br />=z <br />Z <br />JLU <br />W <br />w <br />z c <br />C" <br />z <br />I1J a <br />J i <br />a <br />Z= <br />It t ME <br />W� <br />=J GO E <br />a Q 1 <br />.JZ o <br />W Y coo <br />2cm <br />y m L6 <br />W C N <br />C. M O. <br />M&K project number; <br />068-2001 1 <br />project mgr; J S B <br />drawn by DJ R <br />issue date; 12-1 4 -2 1 <br />REVISIONS; <br />date; initial; <br />03/11/22 DJR <br />MIRRORED ORIENTATION REVISION <br />sheet; <br />d <br />a <br />0 <br />J <br />LL <br />W <br />0 <br />z <br />0 <br />� <br />Z <br />J <br />0 <br />U <br />0" <br />Ca <br />m cn <br />� J <br />20'-0" <br />5D- <br />SLAB PLAN <br />SCALE: 1/4' I'-0" (2244 SHEET) <br />SCALE: 1/6"=1'-O" (IlxI 1 SHEET) <br />Fm 1.0 <br />