My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6969 Faben Ln
Zephyrhills
>
Building Department
>
Building Plans
>
6969 Faben Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:22:55 AM
Creation date
2/19/2025 8:57:50 AM
Metadata
Fields
Template:
Building Plans
Street #
6969
Location
Faben Ln
Contractor
K Hovnanian Co LLC
Building Plans - Permit #
3544
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILLED GELL5 <br />(5EE PLAN) <br />GONG. OR PAVER <br />DRIVEWAY <br />Ib"x8" THICKEN <br />ED6E W/ (2) #5 <br />GONT. <br />8" GMU BLOCK <br />4" GARAGE <br />TOP VIEW <br />@ CORNER <br />6ARA6E WALL <br />BEYOND <br />GARAGE 5LAB <br />(5EE PLAN) <br />THICKENED EDGE ® 6ARA6E DOOR DETAIL <br />WAa.. krs <br />8" WIDE GONT. <br />GONG. GURB <br />(1) #5 VERT. FROM FT6.- <br />TO BOND BEAM. LAP w/ <br />FOUNDATION DOWEL <br />MIN. 30" GROUT GELL <br />SOLID <br />z� <br />a� O GRADE <br />o z :III —I <br />f ;IIIIIm <br />=I I — 1 I I��I) #5 DOWEL W/ b" HOOK AT <br />I I —III III I —Ill —I ALL VERT. WALL REINF. <br />71 I Ili=1 1= III I I' (5EE PLAN5 FOR LOCATION) <br />GLEAN COMPACTED <br />FILL ® 95% WI PTH MONOLITHIC FOUNDATION <br />5TANDARD DEN5ITY W/ (2) #5 GONT. ON CHAIRS <br />2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BAR5 <br />I -STORY: I'-0" WIDE <br />W/ (2) #5 BARS <br />6A %&r; CURB DETA� I L <br />5 seai.e: rrr's <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6. TO <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" 6ROUT CELL 50LID <br />z 'q� <br />a� GRADE <br />'=11 <br />=III—II_j <br />R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR 5TRIP5 <br />-PER BUILDER <br />HOUSE 5LAB <br />(5EE PLAN) <br />d <br />n . <br />° II�IIII 1 <br />I) #5 DOWEL W/ b" HOOK AT <br />I— _=III —I I ALL VERT. WALL REINF. <br />' 11 1 11 I I=III=1 I I , I I (5EE PLANS FOR LOCATION) <br />GLEAN COMPACTED I I I I I I I I —III I I I- <br />—III..-1i <br />FILL A 15% WI TH MONOLITHIC FOUNDATION <br />5TANDARD DEN5ITY W/ (2) #5 GONT. ON GHAIR5 <br />2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BARS <br />1-5TORY: 1'-0" WIDE <br />W/ (2) #5 BAR5 <br />1=OOTIN6 SECTION W/ BLOCK DETAIL <br />WAS: NM <br />8" GMU BLOCK R4.1 FI-FOIL OR EQUAL <br />BEYOND OVER 3/4" FURR 5TRIP5 <br />EXTERIOR DOOR -PER BUILDER <br />MTL. THRESHOLD HOUSE SLAB <br />5ET IN SEALANT (5EE PLAN) <br />PAVERS <br />(5EE PLANS) <br />11I—III III —III <br />4. 11I—III E —1I—IIII I <br />'—III—III- I —III III-111III—I � 1— <br />III —I III —I I I I —I I I —III —III I- <br />' —I <br />' ►=1 m III I I � . I —III —III- <br />11- <br />MONOLITHIC <br />I I 'III III 111 111-''' <br />GLEAN COMPACTED III =III= I I' FOUNDATION W/ (2) #5 <br />FILL ®95% 5TANDARD WI TH GONT. ON CHAIRS <br />DENSITY AND TERMITE <br />TREATED 2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BARS <br />I-5TORY: 1'-0" WIDE <br />W/ (2) #5 BAR5 <br />ENTRY DOOR DETAIL <br />6 seal.t: Nrs <br />° ° ° a <br />8"x8" THICKENED — <br />5LAB W/ (1) #5 GONT. <br />PA TIO/PORGH/LANAI 5LAB <br />(SEE PLAN) <br />a° <br />EDGE DETAIL <br />&THICKENED scA�: RM <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6. TO <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" 6ROUT CELL 50LID <br />PORGH/PATIO/LANAI <br />5LAB OR PAVER5 <br />(5EE PLAN) <br />EXP JOINT - v <br />m <br />` b(41E_- <br />E- <br />llll,r <br />R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR 5TRIP5 <br />-PER BUILDER <br />HOU5E 5LAB <br />(5EE PLAN) <br />�TI}1-(I) #5 DOWEL Wl b" HOOK AT <br />I I I-111- ALL VERT. WALL REINF. <br />' I I l 1=III=III=1 I III- (5EE PLAN5 FOR LOCATION) <br />GLEAN COMPACTED <br />FILL A c15% MONOLITHIC FOUNDATION <br />STANDARD DEN5ITY WI TH W/ (2) #5 GONT. ON <br />GHAIR5 <br />2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BARS <br />1-5TORY: 1'-0" WIDE <br />W/ (2) #5 BAR5 <br />EXTERIOR WALL @ PORCH/PATIO/LANAI DETAIL <br />8 GMU BLOCK <br />BEYOND R4.1 FI-FOIL OR EQUAL <br />EXTERIOR DOOR OVER %" FURR 5TRIP5 <br />-PER BUILDER <br />MTL. THRESHOLD <br />5ET IN SEALANT HOUSE SLAB y "�xb" LONG 5ET Y " GONG. SLAB <br />(5EE PLAN) PRE55lJRE 51MP5ON TITEN HD w/ 2 G OR WIDTH PER ARCH <br />PORGH/PATIO/LANAI TREATED BOTTOM �1'�`' ®4'-0" O.G. FIBERME5H REINF. <br />SLAB OR PAVERS PLATE AND 12" MAX FROM OVER b MIL. <br />(5EE PLAN5) END OF WALL VAPOR BARRIER <br />d <br />° d <br />PER MANUF. d— — — — <br />♦ I—_ — —_—_ a ue � <br />=1 11=1 I I- cx 1=1 I I III —III —III —_III_ I I I_I I I_I I I —III =_ __ —I 11=1 11=1 11=1 I I —I <br />'—Ill—_� III—i I < . I I—III—III—� 11111—I I I —III —I I I —I —_ <br />____ _ III —III —ill —Ill— I I I —III —III —III Ill —III —III —I I f h <br />�— v E <br />III I —I I Ill —III —I � i <br />—I m III I I d. I I —III —III- w Ill —Ill —III —I I —III —Ill —III —I I —III I I I ° a <br />4:: <br />- vz <br />I —III —III Ill— MONOLITHIC 1'4 MIN m <br />—I I 1=111—III—I I 1-1'' 8" 8:� <br />FOUNDATION W/ (2) #5 (2) #5'S GONT. <br />GLEAN COMPACTED ' III =I I �= I I <br />FILL ® c15% 5TANDARD WI TH GONT. ON CHAIRS <br />DENSITY AND TERMITE <br />TREATED 2-5TORY: 1'-4" WIDE <br />w/ (2) #5 BAR5 <br />I -STORY: P-0" WIDE <br />W/ (2) #5 BARS <br />EXTERIOR OUT5W1 N6 4 56D POURED SILLS DETAIL <br />UPLIFT GONNEGTOR5 5UGH A5 5TUD PLATE TIE5, HURRICANE GLIP5, AND <br />ANCHOR BOLTS ARE NOT REQUIRED ON WALL5 NOT SUBJEGT TO A <br />CALCULATED NET UPLIFT FORGE. WALL WHIGH REQUIRE 5UGH HARDWARE <br />WILL BE 5PEGIFIGALLY NOTED ON PLAN. <br />INT. BEArR I N6 WALL FOOT I N6 DETAIL <br />SLAB RECESS AT SHOWER <br />Y2" GYP. BD. EA. 51DE <br />OF 2x45 ® I b" O.G. <br />Y2" J-BOLTS b" FROM EA. <br />END OF WALL AND <br />5PAGE A 32" O.G. <br />2" (b" MIN. EMBED) <br />2- 5TUD PLATE TIE5 PER <br />;d PT BOT. PLAN ® 5TUD TOP 4 <br />PLT. BOT. <br />A /d •: , . �j <br />(2) #5'5 GONT. W/ --/ „ 11 <br />3" MIN. CLEAR 8 8 <br />UPLIFT CONNECTORS SUCH A5 5TUD PLATE TIE5, HURRICANE GLIP5, AND <br />ANCHOR BOLT5 ARE NOT REQUIRED ON WALL5 NOT abJEGT TO A <br />GALGULATED NET UPLIFT FORGE. WALL WHIGH REQUIRE 5UGH HARDWARE <br />WILL BE 5PEGIFIGALLY NOTED ON PLAN. <br />6ARA6E STEP DOWN DETAIL <br />WAat WS <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6. TO — <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />50" GROUT CELL 50LID <br />cz_cQc <br />L L <br />az O RARE <br />' l—III—Ill—III- <br />_ —I I I —I 11 <br />PVG CHASE SLEEVE TO BE <br />' 1=1 11=1 I I I I 1=1 11=� <br />Q 'Il,illllllllllll <br />GLEAN COMPACTED <br />FILL A c15% <br />STANDARD DEN5ITY <br />GHArSE DETA I L <br />8 sc�e: Hrs <br />R4.1 FI-FOIL OR EQUAL <br />OVER 3/4" FURR 5TRIP5 <br />-PER BUILDER <br />HOUSE SLAB <br />(5EE PLAN) <br />j..4 <br />.. .. - <br />a III-11I-111 <br />11—Ill—III—� I <br />° 11-1 11-1 I 11- <br />° =1 I I=1 I � TWICE THE DIAMETER OF <br />=1 11=1I I I =1 I I >�oTEGTED PIPE <br />Illllllil�lll- ' <br />MONOLITHIC FOUNDATION <br />WI TH y�/ (2) #5 GONT. ON CHAIRS <br />2-STORY: I'-4" WIDE <br />w/ (2) #5 BARS <br />I -STORY: I'-0" WIDE <br />W/ (2) #5 BARS <br />FUTURE V" GMU <br />BLOCK <br />DRILL 6' INTO EX15T'6 <br />5LAB, EPDXY I$ DRIVE I I <br />#5 �DONEL, PROVIDE MIN. - <br />30 LAP 5PL I GE 1 <br />- I <br />1 I z <br />a <br />d d <br />a <br />GRADE <br />I II <br />_ <br />' _ =1 1=1 <br />—1 I a - <br />III -1 I —111_ I i I— <br />#5 VERT. BAR TO BE <br />LOGATED PER PLAN <br />IN GROUTED DELL <br />MISSED DOWEL RETROFIT DETAIL <br />SCALE: NTS SIM. ® GMU STEM FOR DROPPED 6RADE <br />seal �`\5G. <br />- <br />OFr ._ <br />OR10P <br />vaL <br />© COPYnght: p <br />structur mineerinq, Inc. <br />oCD <br />z <br />0 <br />JUj <br />W <br />W <br />z <br />N <br />Z <br />W <br />J <br />a <br />fx <br />Z= <br />� <br />�� <br />c..� <br />Ali <br />� �a <br />cc <br />UjW <br />=_ <br />5 <br />Q <br />m <br />Q � <br />z <br />:s <br />W <br />C <br />0 <br />2 <br />ca <br />LU <br />m _ <br />O N <br />42 C <br />OC <br />M n <br />IV <br />M&K project number: <br />068-2001 1 <br />project mgr: <br />JSB <br />drawn by: <br />DJ R <br />issue date: 0 <br />1 - `I 3-2 2 <br />REVISIONS: <br />date: initial: <br />)3/11/22 DJR <br />5Ird <br />J <br />� <br />Uj <br />W�LL <br />z <br />� <br />� <br />z <br />Ld <br />U) <br />� <br />� <br />U <br />Z <br />� <br />rn a <br />'' <br />O <br />z <br />J <br />� <br />J <br />sheet: <br />SDw I <br />seal.,:: NTs <br />WAU: RIS <br />seaLl:: RIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.