Laserfiche WebLink
4" STUCCO B <br />LEFT ELEVATION <br />SCALE: 1/4"=1'-0" <br />RIGHT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />FINISH <br />:; �..r,.- "-u.. <br />r•: `'- "��� %'� <br />L ,� - <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />MAR 2 2 2022 <br />It <br />J W <br />Wz0M <br />w <br />°ZO <br />>ccQO <br />W 0 1- <br />Q Lu W <br />? W QQ�77 <br />J(~nWW <br />cc- cr. <br />zW <br />z <br />z <br />W (L cn Q <br />a <br />�U)000 <br />=ZLLcn <br />�I-az� <br />N. <br />a � chi <br />CZ <br />G <br />n <br />��j Q o <br />O �a <br />Q <br />O <br />O <br />C� <br />Ou <br />O <br />I� <br />Im <br />m <br />co <br />w <br />O <br />j <br />W <br />O <br />w <br />A <br />w <br />(j) <br />w <br />O <br />x <br />z <br />0 <br />R <br />N <br />W <br />C <br />w <br />O� <br />aaaaa <br />O:Z <br />COMMUNITY: <br />NI A U <br />SPRINGS <br />PLAN # 6103 <br />RELEASED: 1/19/22 <br />SHEET <br />A292 <br />