My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36019 Shady Bluff Lp Lot 1
Zephyrhills
>
Building Department
>
Building Plans
>
36019 Shady Bluff Lp Lot 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 11:41:59 AM
Creation date
2/19/2025 9:07:17 AM
Metadata
Fields
Template:
Building Plans
Street #
36019
Location
Shady Bluff Lp Lot 1
Contractor
Windward Homes
Building Plans - Permit #
7476
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tear a 1aftflon to be used as a template for <br />lavirm the went out (Figure E-G) and ceaW the <br />lenviatellocator avert ridge cap shingles at <br />the beginning of the vent slot Note The locmion <br />of the Wft (Figure H). Make sure to do this at <br />both ends of the installation. <br />Maas 0* dislame from the edge of the real slot <br />to the exterior baffle (D). EsWbUsh a chalk fine Moog <br />one side of the ridge (Figure 1). <br />Unroll the veol and use the included W pneumatic <br />rool'Im nails to attach the W "of the ridge vent <br />with The exterlor of the baffle aged with the chalk <br />Ilne (f Igwe J). Nall gun UqeU are embossed on' <br />part as a guide for propesty attaching vent to the <br />roof, no vent should be haftned an 6" caMors <br />(Figure K). <br />Proceed with attachhV the other side of the vent,. <br />When beginning to nail down the second side, <br />do NOT begin at the end. Begin between the first <br />and second one -foot seellons and then return to <br />fasten the first orte-foot section. This will allow <br />for proper fit. <br />NOTE. Fo r proper app-para.r ?ce, pull th c thv ovvr, t ly <br />XfOS Ifte (496 8(,'d ff8t 017 M,95 M� b6fOrP, Skt')P'6�7 <br />,NOTE Fof a uniform qprariccp o, r 4rislall Cotra Kd , eaxe <br />veef?l ovot Ax etqfirc 16ngM of ft ridge, rnakifag <br />Sum tPar U'le kv, 11 mesld3 past the slot opeaifr4 &Y at <br />ipasi 6" <br />A10 TE. tior ap)w cationsIo ver fammaw shingiss, apply a <br />bead of sYkone oaulkiog or toof veawnt to the undmsfde <br />of 08 orilef baffle along Me eptiro ridge and at exoosed <br />des so ft ", g2ps are compistely rlhsd' <br />MOTE. Mvri venliag vau)W and calk -drat ceilings, <br />exh fals0after csvity must be mttfod at bolh ends <br />axy have al /683! ly, ' efearan ce. <br />STEP 4 <br />Cap Shingle installation <br />Install tm rWqe cap shingles directly to the vent <br />using prmimatic, nail #un, wd IncludIed 1%" nails. <br />A nail line Is Inscribed on the lop of the vent to <br />serve as a guide (Figure L). <br />A4 <br />Quality You Can Trust Since 1886...1rom, North America's Largest Rooting Manufacturer 600 <br />CM5 GAF UalgrkA 0apor.4ban tZ% # 1361 Alps Road Wayne NJ, 07470 %,Awqw- xvr RE608804 iM4 <br />CopyTight,� 2000 Win(l%'aTd Homes No portion may be copied or reproduced without the prior written permission of Windward Homes <br />Share drive W: Quality Control Check 11 st/Roofin g (680)/ Roofing Install Shingle Final Group 680 rev 03-16-07 /Page 4 of 4 <br />Windward j Homes <br />PLAN @ 2003 WINDWARD HOMES. ALL RIGHTS RESERVED <br />
The URL can be used to link to this page
Your browser does not support the video tag.