My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36030 Shady Bluff Lp Lot 17
Zephyrhills
>
Building Department
>
Building Plans
>
36030 Shady Bluff Lp Lot 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 11:59:21 AM
Creation date
2/19/2025 9:08:03 AM
Metadata
Fields
Template:
Building Plans
Street #
36030
Location
Shady Bluff Lp Lot 17
Contractor
Windward Homes
Building Plans - Permit #
7549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSB960 Instructions <br />rod peak <br />lecho <br />Pdel <br />ane de toil <br />Figure 1 - Figura 1 <br />Figure 2 - Figura 2 <br />Figure 3 • Figura 3 <br />Figure 4 • Figura 4 <br />Installation of SSB960 roof vents should com- <br />ply with all local standards and regulations. <br />CAUTION: Use appropriate safety glasses, <br />gloves and other equipment to avoid injury. <br />New Construction <br />or Re -Roofing <br />Determine the location of vents: <br />Evenly space the roof vents along the width of the roof, marking <br />the location of all roof vents before cutting holes. Center the holes <br />between the rafters within 2" from the peak of the roof. Mark a 10" <br />circular outline for the hole on the roof. (Figure 1) <br />Cut and prepare the opening: <br />Cut the :holes in fhe sheathing before applying shingles. Shingle up <br />until the first full course of shingles covers the bottom of the hole. <br />Cut the excess shingles away from the hole. (Figure 2) (For <br />increased weather protection on new construction or re -roofing <br />applications, use an 18"x18"' piece of GAF Weather Watch® or <br />GAF StormGuard* Leak Barrier. Center the leak barrier over the <br />hole. Remove release film., press into place and cut away the leak <br />barrier spanning the hole.) <br />Position the vent and nail the vent into place: <br />The top of the SSR960 has an up-arrow formed into the flashing. <br />Make sure the vent is in proper position. Nail the vent securely into <br />place, spacing the nails every 4" apart around the perimeter. The <br />nails should be V from the edge of the vent flange. Seal all seams <br />and nm heads with an approved sealant, such as silicone, roofing <br />cement, or waterproof caulking. (Figure 3) <br />Complete shingle installation <br />Continue, installing shingles, overlapping the flange on the vent. <br />Cut the slAi4es around the top of the vent to match its shape. <br />(Figure 4) <br />root peak <br />p� del techo <br />Taste de toil <br />Figure 5 • Figura 6 <br />Installation of SSB960 roof vents should com- <br />ply with all local standards and regulations. <br />CAUTION: Use appropriate safety glasses, <br />gloves and other equipment to avoid injury. <br />Adding an SSB960 <br />to Finished Roofs <br />Determine the location of vents: <br />Inspect the attic to determine the location of rafters and other <br />obstructions. Evenly space the roof vents along the width of the <br />roof, marking the location of all roof vents before cutting holes. <br />Center the holes between the rafters within 7 from. the peak of the <br />roof. Mark a 10" circular outline for the hole on the top of shingles. <br />(Figure 5) <br />Cut and prepare the opening: <br />Using a sharp knife, cut away the shingles (Figure BA). Cut through <br />the sheathing using a reciprocating saw (Figure 68). Carefully <br />remove the roofing nails within -3"of the hole. Cut the shingles at the <br />top of the hole to accommodate the shape of the roof vent. (For <br />increased weather protection on new construction or re -roofing <br />applications, use an 18"x18" piece of GAF Weather Watchl or <br />GAF StormGuar& Leal: Barrier. Center The leak barrier over the <br />hole. Remove release film, press into place and cut away the leak <br />barrier spanning the hole.) <br />B Position the vent: <br />Apply a generous amount of silicone, roofing cement, or water- <br />proof caulking to the perimeter of the hole. (Figure 7A). Slide the <br />vent into place beneath the shingles, ensuring that the throat of the <br />i vent is centered on the hole (Figure 78). The shingles should <br />•-., ,. •; a ", ` overlap the top half of the vent flange. The bottom half of the <br />Figure 7 • Figura 7 vent's flange will be exposed on top of the shingles. <br />Nail the vent into place: <br />Nail the vent into place, spacing the nails every 4" around the <br />perimeter of the vent. The nails should be l"in from the edge of <br />the vent flange. Replace nails in the shingles as necessary to encore <br />a proper seal. Use silicone, roofing cement, or waterproof caulking <br />to seal any exposed nails. (Figure 8) _ <br />NM. In Careda,ody tiro GAF and Qualfty Y170 Can Trust Since y8$F7- - - NOTE: In Canada only the GAF and Quality YOU can Trust Since 7I8$$- - - <br />Timberfinelogosare regsteredVadeimarkS front North America's Largest Rooffi>rg Timbernnelogos are registered trademarks, from North Americas Largest Roofing <br />NOTA: Sdamerme I os norbres de GAF NOTA: Sd am rate los non bras de GAF y <br />Timberline son maressfegstradasenCanadaM and Ventilation Manufacturer Timberline son mamas registadasenCanadd. and Ventilation Mant/facturer <br />REVAROUE: Seds lea no ms GAF st Qj REMAROUE: Seals W_s nDmsGAF et iw <br />Timberline son! des maazrqquues de ammxn it Timbe tine smtdAs marques de GAFrR6MlE <br />commerce d +osspaau rarrada CORPOINATfpN J commerce dBposBes au Canada OORPdRAITiON <br />T, <br />01 w <br />91. V <br />OIw <br />SHEET NO. <br />IN3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.