Laserfiche WebLink
11 1 114 1 11 1.1 I 1 11 1 11 11i 1 I <br />I I L <br />1 <br />I� <br />I <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) — MAX 9 <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/ UNSUPPORTED, <br />SCHEDULE FOR SHEATHING DETAIL-? (2) 16d NAILS IF >9" SEE 1O/S6 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS —� <br />45"t <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />MAX. 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 10/S6 <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL <br />45° t SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CRO BRACE SCHEDULE FORzz, ZI <br />SHEATHING DETAILV 2x4 KICKER 2x8 SYP#2 "L" BRACE TO <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 1O/S6 <br />APPROX. 8 FROM EXTEND AT LEAST 90% OF `- DOUBLE TOP PLATE <br />RIDGE FASTENED AT @ 8'-0" 0/C. WEB LENGTH & NOTCH AT 2x4 CROSS BRACE APPROX. 8" <br />"L" BRACE TO EXTEND 2x4 CROSS BRACE FROM RIDGE FASTENED AT <br />EACH JOINT W/ (3) @ AT LEAST 90% OF WEB APPROX. 8" FROM BOTTOM CHORD (SEE TABLE) <br />& (2)10d TOE NAILS @ LENGTH (SEE TABLE) RIDGE FASTENED AT EACH JOINT w/ (3) 10d & (2) 10d <br />o <br />EA. END @ 48" O.C. SIMPSON H2.5A w/ (10) 8d <br />2x8 P.T. GABLE TRUSS EACH JOINT w/ (3) 10d & TOE NAILS @ EA. END <br />SILL (2)10d TOE NAILS @ EA. FROM LEDGER TO 2x FRAME WALL <br />1/2' CDX PLYWOOD OR END BLOCKING (SEE WALL <br />7/16" OSB SHEATHING GYPSUM WALL BOARD SECTION FOR SIZE & SPACING) <br />ATTACHED W/ 10d GABLE TRUSS 1/2" CDX PLYWOOD OR 7/16" <br />NAILS @ 6" O.C. EDGES 2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST • <br />AND 12" O.C. FIELD (4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM 1/2" CDX PLYWOOD OR 7/16" OSB SHEATHING ATTACHED <br />dX3" @ 3" 0/C CORD ATTACHED W/ (2) 16d TOENAILS OSB SHEATHING ATTACHED W/ 10d NAILS @ 6" O.C. EDGES <br />10 <br />2"x4" LEDGER (MATCH BOTTOM CHORD w/ 10d NAILS @ 6" O.C. AND 12" O.C. FIELD <br />THROUGH CHORD EDGES AND 12" O.C. FIELD (2) 16d NAILS <br />INTO 2"x6" P.T. PLATE SLOPE OF ADJACENT SCISSOR TRUSS) <br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />FASTEN WITH 10dx3" @ 4" 0/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL <br />INSTALLED PER MANUF. 1/2" x 8" "J" BOLT @ 48" O.C. WEEP SCREED FROM EA. END TYP. TOP & BOTTOM <br />@ 48" O.C. SIMPSON META12 w/ (7)10dxl 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2)16d TOENAILS BLOCKING, FASTEN WITH <br />1/2"x 8" "J" BOLT @ 32" O.C. MINIMUM 6" FROM MOISTURE BARRIER O.C. MAX w/ MIN. 4" EMBEDMENT IN KO BLOCK - 1Odx3" @ 4" O/C <br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER MOISTURE BARRIER 2x4 LEDGER (MATCH BOTTOM CHORD <br />SIMPSON META12 w/ (7) ALTERNATE SIMPSON MSTAM24 w/ (7) 1 Od NAILS SLOPE OF ADJACENT TRUSS) <br />NOTE: IF EMBEDDED 1 Odx1 1/2" NAILS AT EA. & (4) 1/4"x2 1/4" TITEN @ 4'-0" O/C ALIGNED WITH <br />STRAP MISSED VERTICAL SECTION TRUSS VERTICAL WEB (24" GABLE WEB SECTION SECTION <br />WEB, USE MSTAM36 w/ (7) 1 O.C. MAX) w/ MIN. 4 2 3 <br />10d NAILS & (4) 1/4"x2 1/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCK <br />TITEN IL OUTSIDE S5 SCALE: N.T.S. S5 SCALE: N.T.S. S5 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING MAX. 9" <br />REFER TO DETAIL J _ _ AND FASTENERS. (MIN. FIRST 4 BAYS) UNSUPPORTED, <br />ON SHEET S5 FOR N IF >9" SEE 1O/S6 <br />X-BRACING, AND TOP x <br />SEE STRUCTURAL <br />N - NOTES AND NAILING <br />CHORD BLOCKING <br />00 <br />INFORMATION CO SCHEDULE FOR <br />1 1 SHEATHING DETAIL BACKNAIL w/ <br />WOOD TRUSSES 1/ (2) 16d NAILS <br />`° bo 00 2"x4" CROSS BRACE <br />2x4 RAT RUN BRACING APPROX. 8" FROM <br />RIDGE FASTENED AT <br />"L" BRACE TO EXTEND <br />AT 24" O.C. ON TOP OF <br />EACH JOINT w/ (3) <br />AT LEAST 90% OF WEB <br />BOTT. CHORD FOR 4 <br />10d & (2) 10d TOE <br />LENGTH (SEE TABLE) <br />-- <br />-- TRUSS SPANS <br />ATTACHED W/ 2 - 16d <br />NAILS @ EA. END <br />GABLE TRUSS <br />AT EA. TRUSS JOINT <br />�� �� �� <br />(2) 2" x 4" LAMINATIONS W/ (1) ROW (3) 2 x 4 LAMINATIONS W/ (1) ROW (3) 2" x 6 LAMINATIONS W/ (2) ROWS OF <br />2x4 PANEL BLOCKING <br />2 <br />1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />SIMPSON HGAMIOKTA <br />OF STAGGERED 10d COMMON WIRE NAILS OF STAGGERED 30d COMMON WIRE NAILS STAGGERED 30d COMMON WIRE NAILS <br />48" O/CNE FOR THE <br />(2) 16d NAILS <br />W/ 10d NAILS @ 6" O.C. <br />W/ <br />2x4 BLOCKING @ 24" <br />(D = 0.148", L = 3") OR EQUAL (D = 0.207", L = 4 1/�') OR EQUAL (D = 0.207", L = 4 1/2") OR EQUAL <br />FIRST (4) ROWS OFo <br />E ES AND 12" O.C. FIELD <br />O/C w/ (2) 16d <br />TRUSSES FROM EA. <br />(4) 1/4"x1 1/2" SDS <br />TOENAILS @ EA. END <br />NOTES: <br />END TYP. TOP & <br />JACK TRUSS <br />SCREWS <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA. x 51/2" LAG SCREWS OR EQUAL <br />BOTTOM ATTACHED <br />SEE PLAN FOR <br />TO BLOCKING & (4) <br />MASONRY WALL <br />OF THE COLUMN (SPACE AS SHOWN FOR 3-PLY) <br />w/ (2) 16d TOENAILS <br />CONNECTION <br />1 /4"x2 3/4" <br />TITEN TO CMU <br />ARCHITECTURAL FINISH <br />2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />IH- <br />OF THE LAST LAMINATION (SPACE AS SHOWN FOR 3-PLY) <br />2x4 "T" ON TOP OF PANEL <br />EXT. WALL CONN. <br />3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2) 16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION <br />BLOCKING, FASTEN WITH <br />1Odx3" @ 4" O/C <br />2x4 BLOCKING W/ <br />(2) 12d TOENAILS <br />NON - LOAD BEARI <br />G LOCATION rD <br />COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF <br />B.U.C., SAME NUMBER OF ROWS, SAME SPACING) <br />SECTION <br />g <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS <br />SCALE- 3/4"=1'-0" c� <br />8 <br />MINIMUM 2x <br />'ROSS BRACING <br />SEE PLAN FOR <br />OCATIONS) TOENAIL <br />(2) 16d NA <br />(2) 16d PER <br />JOINT <br />L CONTINUOUS BOTTOM CORD BRACING 2"x4" MIN. SEE M/S5 <br />CROSS BRACING DETAIL <br />SCALE: N.T.S. <br />GABLE END BRACING DETAIL <br />12" <br />,SH SCHEDULE <br />,TTACHMENT <br />SYP BLK'G @ 16" O.C. <br />I x 0.131" <br />AILS EA. SIDE <br />. 2x4 #2 SYP w/ 1 Od <br />XO.131" @ 8" O.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL 10 <br />SCALE: N.T.S. S5 <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />SCALE: N.T.S. S5 <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES 6" OVERLAP <br />MINIMUM (2) 16d PER JOINT \- MINIMUM 2x4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL rm <br />SCALE: N.T.S. S5 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />MAX. 9" <br />SEE STRUCTURAL NOTES AND <br />UNSUPPORTED, <br />NAILING SCHEDULE FOR SHEATHING <br />IF >9" SEE 10/S6 <br />DETAIL <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />"L" BRACE TO EXTEND <br />EACH JOINT w/ (3) <br />AT LEAST 90% OF WEB <br />10d & (2) 10d TOE <br />LENGTH (SEE TABLE) <br />NAILS @ EA. END <br />GABLE TRUSS <br />2x4 PANEL BLOCKING <br />1/2' CDX PLYWOOD OR <br />@ 48" O/C FOR THE <br />(2) 16d <br />7/16" OSB SHEATHING <br />FIRST (4) ROWS OF <br />NAILS <br />ATTACHED w/ 1Od NAILS <br />TRUSSES FROM EA. <br />@ 6" O.C. EDGES AND 12" <br />END TYP. TOP & <br />O.C. FIELD <br />BOTTOM ATTACHED <br />W/ (2) 16d TOENAILS <br />2x4 "T" ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />1Odx3" @ 4" O/C <br />SIMPSON HGAIOKT w/ (4) 1/4"x1 1/2" SDS SCREWS TO <br />TRUSS & (4) 1/4"x3" SDS SCREWS TO PLATES AT 24" O.C. <br />DBL. TOP PLATE <br />SIMPSON SP2 w/ (12) 1Od <br />NAILS AT EACH STUD <br />STUD WALL (SEE TYP. SEC.) <br />SECTION <br />4 <br />SCALE: N.T.S. <br />ScJ <br />8d @ 6"O/C r2 x 4 BLOCKING w/ (2) 1Od <br />WOOD TRUSSES TOE NAILS AT EACH END @ <br />' 24" O/C (TYP) <br />BRACING w/ (3) 1 Od x 3" AT <br />EACH CONN. @ 24" O/C <br />SIMPSON HGAM10KTA w/ (4) <br />1/4"xl 1/2" SDS SCREWS TO <br />MOISTURE BARRIER <br />BLOCKING & (4) 1/4"x2 3/4" <br />BOND BEAM <br />TITEN TO CMU <br />MASONRY WALL <br />ARCHITECTURAL FINISH <br />EXT. WALL CONN. NON -LOAD <br />BEARING LOCATIO (UNEVEN CLG.) <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U.N.O.) <br />"L" BRACE <br />2"x6" (U.N.0.) <br />"L" BRACE <br />24" <br />0'0" - T-O" <br />T-O" - 6'-0" <br />6'-0" & GREATER <br />SCISSOR GABLE - (1) 2"x8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x8" FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 1 Odx3" NAILS @ 4" O/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />"L" BRACE WI 1 Od @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />SIMPSON HGAIOKT w/ (4) 1/4"xl 1/2" SDS <br />SCREWS TO TRUSS & (4) 1/4"xY SDS SCREWS <br />TO PLATES (TYP.) <br />/—GABLE TRUSS <br />STUDS @ 16" O.C. <br />GABLE END BRACING DETAIL SCALE:3/4"=1'-0" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SIMPSON SP2 w/ (12) <br />1 Od NAILS AT EACH <br />STUD <br />HIP FRAMING REFERENCE PLAN <br />z <br />w <br />2x4 BLOCKING 2x4 "T" BLOCKING <br />@ 48" O.C. 16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />10d NAILS @ 4 <br />E <br />" <br />O.C. TYPICAL <br />GABLE TRUSS WB <br />DOUBLE 1" BRACING DETAIL 5 <br />SCALE: N.T.S. S5 <br />2x4 "T" BLOCKING <br />2x4 BLOCKING @ <br />48" O.C. <br />"L" BRACE ATTACHED 16d NAIL <br />W/ lOd NAILS @ 4" O.C. <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL 6 <br />SCALE: N.T.S. S5 <br />DIAPHRAGM <br />BLOCKING @ <br />48" O/C GABLE TRUSS <br />ttl TRUSS VERTICAL <br />(2) 2"x8" "L" BRACE <br />FASTENED WITH (3) <br />16d PER SIDE <br />SCISSOR GABLE "T" BRACE <br />AS PER HIB 91 SCALE: N.T.S. S5 <br />20'-0" MAX 20'-0" MAX <br />"X"BRACE SEE DET. J/S51 CONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />m <br />I <br />NOTE: ZTOP CHORD 2x4 #2 SYP BRACING <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING @ 16" O.C. MAX. FOR FIRST (4) <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING BAYS <br />THAT MY BE REQUIRED ZBOTTOM CHORD GABLE END BRACING <br />2) "T" BRACING MAY BE USED IN PLACE OF PERMANENT @ 4'-0" O.C. MAX. FOR FIRST (4) BAYS <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN <br />AS PER BCSI <br />SCISSOR TRUSS <br />SCISSOR TRUSS <br />W/ DROP CEILING BRACING DETAIL <br />MEAN ROOF HEIGHT UP TO 30'-0" <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SCALE: N.T.S. <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />COSMETIC DROP CEILING FRAMING <br />SCALE:NTS MAR 0 4 2023 <br />yF <br />M 4/r <br />.EV" <br />Virtual Review Assist. Inc. <br />Plans Review completed and approved <br />for comphlianceoee alth eAnne Edition <br />hrr PX2300 <br />2X4 LEDGER <br />---SIMPSON LSTA18 <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />@ 16" O.C. <br />N <br />N <br />83 <br />04 <br />�d <br />W. <br />O <br />LO <br />„... , <br />-_ <br />w <br />O <br />❑ <br />0 <br />z <br />SIN, <br />� a) � - <br />' <br />W <br />�} <br />sL. -c u <br />�c <br />N <br />f' Z) 02 Z a <br />V -0-0— A M <br />Q) E •E t o <br />U o <br />_D _O <br />��8 mQ <br />.N <br />.0 �6� U <br />W00 <br />7W <br />V <br />CQN <br />V <br />L C0 <br />n <br />(� <br />LU <br />w <br />w� w _j w2�0 <br />H W J af Z <br />LuoQ <br />W7)-_j`LOa�aLL000 <br />x Z <br />0 <br />Q Q <br />U <br />❑aOX�zELL0z20"~ <br />♦- <br />ClWE LDZ0w000°°❑zj <br />v� a U)wxw�cnLLWQ0�.7 <br />c� <br />O <br />ir< WeC�zWzOwV❑IL <br />�I-� �YWOU <br />d <br />LL <br />Ow <br />OW ❑ ❑ ❑e <x <br />LLa 0 LL <br />O <br />Z <br />W <br />0 <br />co O <br />Q CM � <br />J <br />LL- <br />Lq <br />F-�afro <br />zv� <br />Z <br />W <br />WO <br />J O <br />mi <br />co <br />1 <br />I <br />i <br />N <br />Q <br />O <br />N <br />O <br />N <br />O <br />N <br />00 <br />M <br />a <br />Co� <br />o <br />� <br />a!i <br />I <br />I <br />' <br />z <br />O <br />Nof <br />w cn <br />L <br />Lo <br />N <br />ri <br />I <br />I <br />I <br />I <br />CO <br />r^ <br />ZZ <br />az <br />O <br />Ww <br />Zw <br />0 0 <br />� <br />0 <br />U <br />6"u, <br />L <br />F— <br />--)z> <br />C)wo <br />Z <br />0- w o- <br />Q <br />0 <br />= <br />Of <br />U) <br />(� <br />m W <br />r-I <br />z0 <br />o = <br />W <br />QF-0 <br />CO <br />Q <br />0 <br />2§2 <br />zoo <br />Q <br />V <br />af <br />QwU_ <br />Z <br />z <br />LL <br />Q <br />F <br />� <br />OU <br />O <br />a <br />m <br />Z <br />z <br />z <br />z <br />w <br />W <br />J <br />O <br />O <br />LAST PLOT DATE <br />Z <br />0 <br />J <br />STRUCTURAL <br />DETAILS <br />