Laserfiche WebLink
2x8 P.T. BUCK -CONNECT TO BLOCP <br />W/ 1/4" x 3 1/4" TAPCON ( 1 1/4" MIN. <br />EMBEDMENT INTO BLK.) <br />1 X 4 FURRING <br />BLOCK HEADER <br />1/2" DRYWALL <br />2 x 8 45A DIAGONAL <br />BRACE(S) <br />BUILT UP PLWD. BUCK <br />SCRIBE (NOTCH) <br />BACKSIDE TO FIT ARCH <br />CONNECT W/ 8d NAILS <br />INSTALL WDW. SCREW ANCHOR <br />INTO ARCH BLKG. PER <br />INSTALLATION DETAILS <br />DOOR JAMB (REFER 1x4 1/2" DRYWALL 'I DOOR JAMB (REFER <br />1x4 <br />1/2" DRYWALL <br />TO PRODUCT <br />P.T. <br />h TO PRODUCT <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. <br />i <br />1x4 <br />1x4 P.T. <br />3/16"O X 3" LONG <br />FURRING <br />3-1/4" LONG X 3/16"0 <br />FURRING'I <br />TAPCON. INTO <br />ITAPCONS <br />STAGGERED @ 16" <br />1x8 P.T. <br />BLOCK@ SPACING „ <br />1 <br />DETAIL <br />O.C. 2-ROWS INTO <br />PER MANUFACTURE <br />MASONRY THROUGH <br />1-1/2n DETAIL <br />1x4 P.T. & 1x8 P.T. <br />3/16" x 3 -112" <br />TAPCON @ 16" <br />1x4 P.T. <br />O.C. & 4" FROM <br />DOOR JAMB (REFER <br />DOOR JAMB (REFER <br />EACH END W/ MIN <br />TO PRODUCT <br />TO PRODUCT <br />2" EDGE DIST. <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. <br />(2) ROWS 3/16" x 3-1/2" <br />TAPCON @ 16" O.C. & <br />4" FROM EACH END w/ <br />L 2x8 P.T. <br />2x P.T. AS REQ'D <br />MIN. 2" EDGE DIST. <br />2x DETAIL <br />2 1/4" <br />DETAIL <br />BUILDOUT L'a-y' OVER SIZE DOOR -WINDOW ROUGH OPENINGS <br />SCALE: N.T.S. <br />1/4" MAX 2'4" <br />e SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. & BUCK <br />8d NAILS AT 8" O.C. AT BUCK <br />(4) 10d NAILS INTO <br />2 x 8 BRACE/ BLKG. <br />7/16" OSB <br />ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA <br />(4) 10d NAILS INTO 2 x 8 <br />BRACE/ BLKG. <br />\_2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 <br />A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />ARCH DETAIL ri <br />SCALE: N.T.S. SS <br />1 SECTION <br />A -A <br />8" <br />1/4" x 3 1/4" TAPCONS <br />DOOR JAMB (REFER <br />1x4 <br />1/2" DRYWAL <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />1X4 <br />(2) ROWS 3/16" x 3-1/2" <br />FURRIN, <br />TAPCON @ 16" O.C. & 4" <br />2X8 <br />FROM EACH END w/ MIN. <br />1X8 <br />2" EDGE DIST. ATTACH <br />1x8 w/ (2) ROWS 8d NALS <br />3" DETAIL <br />STAGGERED @ 12" O.C. <br />DOOR JAMB (REFER <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />1x4 <br />112" DRYWALL <br />2x8 P.T. w/ (2) ROWS 3/16" <br />x 3-1/2" TAPCON @ 16" <br />1x4 <br />O.C. & 4" FROM EACH <br />FURRIP <br />END w/ MIN. 2" EDGE DIST. <br />ATTACH SECOND PLY w/ <br />(2) ROWS 10dx3" <br />2x8 <br />STAGGERED @ 12" O.C. <br />q-1 IN, nPTAII <br />—LEAVE A CUT OUT IN O.S.B. ON THE <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />�— 2 x 8 45 DIAAGONAL BRACE AT EA. <br />FACE OF ARCH W/ (3) 10d NAILS <br />- AT EA. END <br />PROVIDE TAPCON WITHIN <br />4" MIN. OF BRACE <br />START OF ARC <br />4' MAX. RAD. <br />2 <br />x 8 BUCK - CONNECT TO BLOCK SECTION <br />WITH <br />1/4" x 3 1/4" TAPCON (1 1/4" MIN. B-B <br />1/4" MAX EMBEDMENT INTO K.) <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />1 X 4 FURRING <br />BLKG. & BUCK <br />8d NAILS @ 8" O.C. AT BUCK <br />2 x 8 VERT. W/ (2) 10d <br />_ <br />AT EA. END <br />PROVIDE 2 x 8 DIAG. BRACE BTWN,,NAILS <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />LEAVE A CUT OUT IN O.S.B. ON T <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />TO FIT ARCH CONNECT W/ <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />INSTALL WDW, SCREW <br />ANCHOR INTO ARCH BLKG. <br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL EQUAL <br />THRU OSB INTO 2 x 8 <br />PER INSTALLATION DETAILS <br />B-B <br />ARCH DETAIL K <br />SCALE: N.T.S. �SS <br />PROVIDE 2x <br />PROVIDE (2) MIN. CONT. W/ (3) <br />TAPCON AT EA. SIDE 12d NAILS <br />BUCK - (1) WITHIN 4" <br />MIN. OF START OF <br />ARCH <br />START OF ARC <br />4' MAX. RAD. <br />PROPER INSTALLATION MAX. 8" <br />FILL SOLID <br />BOTH CELLS <br />#5 REB, <br />(TYP,) <br />STD. 90' <br />HOOK (7 <br />LV <br />L <br />0/a <br />11 7/ <br />P/z, <br />+5A <br />NOTCH WEB AT <br />FIRST 2 COURSI <br />UPLIFT CAPACITY = 805 # FOR 1 STRAP <br />= 1610 # FOR 2 STRAPS <br />1 PLY PRE-ENGINEERED TRUSS <br />SIMPSON HM9KT w/ (4) 1/4"x1 1/2" SDS <br />SCREWS & (5) 1/4" x 2 1/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16) 16d <br />SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150F. <br />#) <br />BOND BEAM OR CAST IN PLACE BEAM <br />RETROFIT TRUSS DETAIL <br />N.T.S. <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (3) #6 X 4%." WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />12 <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />ROOF SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />(5) 12d NAILS SIMPSON <br />2X6 TO 2X4 H2.5A w/ (10) <br />NOTE: <br />SHED ROOF ENDS TO BE <br />GABLE ONLY, CORNERS <br />SHALL NOT BE FRAMED AS <br />HIP. <br />DESIGNED ONLY FOR THE <br />INSTALLATION OF SHINGLE <br />AND METAL ROOF FINISH <br />GLASS BLOCK INSTALLATION NOTES <br />A) <br />COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) <br />ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />C) <br />SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />D) <br />SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />ANCHOR <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />1/4" EXPANSION BOLT (2 <br />E) <br />INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL <br />PER ANCHOR) <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />REINFORCING <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) <br />EXPANSION STRIP <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />REINFORCING AS FOLLOWS: <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />SEALANT <br />* PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W! <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />REINFORCING PANEL <br />SMOOTH. DO NO FURROW. <br />F) <br />PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />6" MIN. LAP <br />G) <br />SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE NOTE: <br />REMAIN FREE OF MORTAR. <br />H) <br />STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) <br />GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />1) <br />AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />J) <br />APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />K) <br />A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />INSTALLATION OF GLASS BLOCK. <br />JACK TRUSS PROVIDED BY <br />TRUSS COMPANY OR 2x4 <br />#2 SYP @ 24" O.C. <br />4'-0" MAX SEE PLAN <br />2X4 SYP #2 CONT (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (2) #6 X 4%" WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16" <br />O.C. <br />SECTION @ ENTRY L <br />SCALE: 3/4" = V-0" SS <br />FILLED CELL PER <br />FOUNDATION PLAN <br />A <br />YP.) <br />rHE <br />S <br />I IKIAt`f`=37ADI C IAIC`TAI 1 -rInKI <br />FILLED CELL INSTALLATION <br />SCALE: N.T.S. <br />=E ARCH FILA,N AND <br />PILE 1R114- <br />SF� rl h- <br />I <br />• <br />^ =: <br />BI \.� iy°ALL TYPE <br />yW <br />PER PLAN 1 <br />- 1 14" 1 , <br />F I-:HAPvNEL —# <br />FASTENED PEZ' I �� <br />� <br />C111� C <br />k <br />2 FF I <br />CONT VENTED OR <br />BLOCKING NAdLED T'_> T' <br />11 lr KIN, i ,v --ii lij NAILS I" HC",IRD EVItHle 01Ht- <br />,IT _ r1 TEPIAL `,PAN t:APACI <br />t L"L I F N { 4,1PONENT'S AND CA <br />-I <br />: T�C J THE -iE _ (' .'.f 1TEI:I%iC,N SWEETSN <br />/Fr,-k <br />><iF t A I Ir>.t.:HMEN6 AT WALL (:4}Ek ALPHA Al C1:1,1 IN'C FI r <br />/ <br />Pq.ODUCT APPRO)VAL) F CI IANNEL FA,3TENED T�j <br />CrAU e� T NAIL .09T n➢A rn 21 1 i : ' 1 rJ f k t" FC)1 1TP`.T <br />uJC'i-;LJ'v "1p Inr,A <br />PATTERN <br />/ <br />S3_Jh F', ,.;I:+'"+ti' I' ;r: ,-1 1 .. . ..,h. ;(J H IF00% <br />STRUCTURAL SOFFIT <br />SF01 <br />L <br />SCALE: 3)41'.0" 1—) Ft R ALI rAIN'X-1 � t :P7FIT: '•"'I <br />h aI 1 , ."I.i,''1 > 1'.4" INS I All h I01D IPPAN h I <br />/ <br />I HH SOFFIE I. F1 NA ICE S T.AI l i. <br />REFER TO THE PRODUCT APPROVAL FOR INSTALLATION DET <br />/ <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />/ <br />* DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />k OV (2) 10d NAILS @ 8" O.C. <br />ERygN TO TRUSS TOP CHORD <br />/ <br />4FNGTy <br />+ + PLYWOOD SHEATHING <br />MASONRY WALL. SEE PLAN FOR <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />W.W.M. AT PERIMETER <br />(1) #5 BARS CONT. WHERE THIS CONDITION <br />TOP WITH MIN. 3" <br />OCCURS <br />COVER U-0" <br />F. F. <br />D p D <br />1=III-=-I I IT=TI I I�=I I I�-TI I I <br />gD. <br />D D III=III-III <br />I -I I I -I I I- <br />° <br />GRADE <br />° <br />cv) I? <br />z <br />N � •D <br />D (2) #5 REBAR. MIN. 3" <br />16" MIN. COVER EA. WAY <br />SECTION AT DEEP MONO FOUNDATION <br />SCALE: 3/4" = V-0" <br />+ <br />BLOCKING AS <br />+ <br />REQUIRED <br />TO SUPPORT <br />TRUSS <br />+ <br />SOFFIT <br />+ + <br />+ <br />2X4 SYP <br />EACH TRUSS <br />CONNECTOR <br />SEE LINTEL <br />SCHED. <br />ENTER SO IT <br />PRECAST LINTEL <br />SEE ELEVATION <br />2X2 #2 P.T. MIN. <br />FOR OVER HANG <br />W/J-CHANNEL SECURED <br />(MAX. 4'-0") <br />@24" O.C. FASTENED TO <br />CMU W/ 3" LONG T-NAILS @ <br />24" O.G. <br />SECTION @ ROOF EXTENSION <br />M <br />SCALE: 3/4" = 1'-0" <br />SS <br />SIMPSON HTT4 w/ (18) 10d x 1 <br />1/2" NAILS TO STUDS & (1) - <br />5/8" DIA. ALL THREAD ROD <br />EPDXIED w/ SIMPSON "SET" <br />EPDXY MIN. 6" EMBEDMENT 8 <br />3" MIN. EDGE DISTANCE <br />RETROFIT FOR MI% <br />MSTAM STRAP <br />SCAI F- 3/4 <br />.SFF .gHFFT n? ANin <br />H <br />SS <br />2N BOT. PLATE W/ (2) 1 Od @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />AND NAILED W/ 8d COMMON @ <br />2X BOTTOM PLATE W/ 8d �cil 4" <br />6" O.C. EDGES AND 12" O.C. FIELD <br />O.C., 2 ROWS STAGGERED <br />2x BAND JOIST W/ FACE NAIL 10d <br />@ TOP & BTTM CHORD, AND (8) <br />FACE NAILS 1 Od @ TRUSS VERT. <br />WEB <br />METAL SEAT PLATE <br />C <br />NOTE: <br />LAP SHEATHING TO <br />— <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />SIMPSON HGAM1OKTA @ 12" O.C. <br />w/ (4) 1/4xl 112" SIDS SCREWS <br />INTO BAND JOIST & (4) 1AN2 3/4" <br />TITEN INTO K.O. BLOCK <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />FILL 1st 4 COURSES <br />SOLID W/GROUT <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />OVERHAN g <br />RETROFIT WALL OVERHANG DETAIL ANTS <br />FOR OVERHANGS BETWEEN 3/4" TO 1 112" <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />1'-0" 5'-0" <br />INISH FLO <br />D ➢ 4> — <br />° #5 BAR x <br />Dp ° p ° CENTERED W/ <br />D IN TOP o <br />—III_ D IR KNOCKOUT/ N III <br />_111 � I = ° CHAIR BLOCK <br />MONO FOOTING ^I I D <br />•D ° D ° <br />SIZE AND REINF. PER PLAN <br />AND SECTION DETAILS —I <br />I ° <br />CLEAN FILL J D ° ° <br />DIRT 71t> z <br />°. STANDARD o <br />o #5 BAR IN 1 90 HOOK C14 <br />J <br />FILLED CELL • - <br />° <br />h�_ _ <br />\ ° n • ° ° • • ° 0 \ ° <br />SIN <br />STEMWALL FOOTING SIZE AND <br />MONO TO STEMWALL FOOTING REINF. AND STEMWALL <br />SECTIONN DDETAETAILS <br />SCALE: 3/4" = V-0" <br />)TE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJEC <br />)NTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />EXISTING BOND BEAM. <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />EPDXY CAP TO PREVENT LEAKAGE <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2") <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM <br />FILL CELL FULL HEIGHT W/ <br />NON SHRINK GROUT. <br />#5x6' EMBEDDED INTO <br />Q EXISTING FOOTING (2) #5x6' IN CONC. <br />U) M FILLED CELL <br />DRILL 3/4"x5" MIN. HOLE <br />SET BAR IN EPDXY <br />». O <br />H4- SAW CUT <br />EXISTING FOOTING A SECTION <br />1 SCALE: N.T.S. <br />RETROFIT FILLED CELL DETAIL <br />SCALE: N.T.S. <br />OCT 2 8 022 <br />VRA <br />Virtual Review Assist. Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />N <br />o <br />00 <br />�..' <br />w <br />o <br />00 <br />LO <br />Q <br />w <br />p <br />w <br />0 <br />z <br />a <br />LO <br />0 o h E <br />O <br />N <br />U(� <br />n <br />i L O <br />0 � g N Q <br />V/ <br />.Ns <br />wd'O �u <br />u �N <br />L O M <br />Iu - <br />LL.I C7 <br />W <br />WW W , W O <br />WO2Ja2a�aLLU0wo 0 <br />Q Q <br />U <br />7) ZLL0Z20 F- <br />� <br />OWfLW-�OWF,�oZ <br />caznwzU� vww <br />Z <br />oa°U) <br />koQWooW¢oO <br />LL <br />aLLa <br />O <br />O <br />Z N <br />OW <br />U Z) ti <br />M O <br />z <br />Q U) CO <br />U) LL <br />z <br />< W < lq <br />F— W cy) <br />zv< <br />Lu <br />W <br />J 00 <br />Cfl <br />(10 <br />I <br />' <br />i <br />i <br />I <br />i <br />I <br />O <br />O <br />N <br />O <br />N <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />M <br />c- <br />r- <br />N <br />O <br />O <br />' <br />z <br />O <br />N <br />W <br />ct <br />O <br />O <br />O <br />I <br />LO <br />j <br />N <br />C600 <br />I <br />I <br />I <br />Ni- <br />zZ <br />VJ <br />.� z <br />w <br />O <br />z <br />W <br />v� <br />o z z <br />w O O <br />O <br />u) <br />1 n <br />I... <br />0 <br />o z j_ <br />OF-p <br />�►1 / <br />z <br />aWa <br />r <br />Q <br />O <br />= <br />w=a <br />Lr) <br />0 <br />w <br />mF-O <br />rl <br />11' <br />zO= <br />W <br /><�0 <br />W'O <br />0 <br />(� <br />15 w Ix <br />IL <br />z <br />az <br />�z <br />U <br />O <br />O <br />zz <br />z <br />w <br />W <br />J <br />O <br />N <br />0 <br />O <br />LAST PLOT DATE <br />z <br />O <br />STRUCTURAL <br />—1 <br />DETAILS — RETRO FIT <br />