Laserfiche WebLink
ROOF FINISH <br />PER ELEVATION <br />12 ROOF SHEATHING <br />15 <br />MANUFACTURED <br />ROOF TRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL <br />6 <br />3 1 0 <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />12 <br />5 MANUFACTURED <br />ROOF TRUSS <br />° MTL DRIP EDGE <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />DETAIL <br />07SOlFFIT <br />3 1 0 <br />N <br />o <br />T , <br />N N <br />04 <br />2" 2" <br />V-8" <br />FALSE FOAM LOUVER DETAIL TYP <br />8 <br />6" <br />1" <br />4" 4" <br />N <br />N <br />1 00 <br />CD <br />o 00 <br />EPS <br />04 <br />FOAM iv <br />BRACKET DETAIL <br />9 <br />-if-Off <br />PROVIDE FILLED SOLID <br />CMU ABOVE LINTEL TO <br />TIE BEAM <br />FLASHING <br />CASING BEAD WITH WEEP HOLES <br />PT 2X8 LEDGER ATTACHED TO <br />WALL W/ 3/8" X 5" TITEN HD AT <br />12" O.C. STAGGERED <br />(S)H10A-2 <br />ROOF FINISH PER ELEVATION <br />UNDERLAYMENT <br />ELEV AT 8'-0" <br />° 12 T.O.M. <br />a. —� 5 ROOF SHEATHING <br />(S)A23 <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />•°> 2'-0" ALUMINUM WRAP <br />(S) A23 ALUMINUM SOFFIT <br />PT 2X4 LEDGER ATTACHED TO <br />WALL W/ 3/16" TAPCONS W/ <br />MIN 2-1/2" EMBEDMENT 6" O.C. <br />BTM AT T-6" <br />SOFFIT DETAIL <br />10 <br />3/4111I-Off <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />STAGGERED <br />N o 0 0 <br />0 0 <br />8" V-0" V-0" 1'-0" 1'-0" <br />LEDGER DETAIL <br />11 <br />3/411= 11-011 <br />8" TRUSS HEEL <br />CASING BEAD WITH <br />WEEP SCREED OVER <br />FLASHING <br />i ELEV AT 10'-0" <br />ELEV AT 8'-8" <br />T.O.M. <br />WEEP SCREED <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />SHINGLE <br />FRONT ELEVATION B <br />1 /411 = 1'-011 <br />8" TRUSS HEEL <br />ELEV AT 18'-0" <br />T.O.P. - <br />7/8" STUCCO <br />ELEV AT 10'-0" OVER FRAME <br />2ND FLOOR FF <br />CONTROL JOINT <br />ELEV AT 8'-8" <br />T.O.M. <br />MID WALL <br />WEEP SCREED <br />5/8" STUCCO <br />OVER <br />MASONRY <br />ELEV AT 0'-0" <br />M <br />A/C UNIT <br />AND PAD <br />17 1 ST FLOOR FF 19 <br />GRADE LINE <br />3>R%EEAR ELEVATION B <br />- 1 -0 <br />� r161711=10111,111 <br />•••- FF <br />1:111 1 11 <br />12'-0" 13'-4" <br />7/8" STUCCO - �,, <br />OVER FRAME <br />:ONTROL JOINT <br />1'-0" MID WALL <br />WEEP SCREED <br />ELEV AT 0'• 0" <br />1ST FLOOR FF <br />GRADE LINE <br />RIGHT ELEVATION B <br />8" TRUSS HEEL <br />ELEV AT 18'-0" <br />T.O.P. <br />ELEV AT 10'-0" <br />1 /811 = 1'-011 <br />16'-8" % <br />7/8" STUCCO J <br />2ND FLOOR FF OVER FRAME <br />CONTROL JOINT <br />ELEV AT 8'-8" <br />T.O.M. <br />A/C UNIT 2'-0" <br />AND PAD io <br />ELEV AT 0'-0" <br />MID WALL <br />WEEP SCRE <br />F- <br />18'-8" _ <br />C9 — <br />oW <br />' N = <br />z <br />1ST FLOOR FF <br />GRADE LINE <br />CLEFT ELEVATION B <br />1 /811 = 1'-011 <br />5/8" STUCCO <br />OVER <br />MASONRY <br />16'-8" <br />2 - CONTROL JOINT - <br />4" STUCCO <br />BAND <br />WEEP <br />SCREED <br />i_Oii <br />4" STUCCO <br />BAND <br />5/8" <br />STUCCO <br />OVER <br />MASONRY <br />1,_0„ <br />12'-0" _ <br />c� <br />oW <br />N = <br />z <br />- <br />12 <br />15 <br />co <br />2'4' A/C UNIT <br />AND PAD <br />F� <br />5/8" STUCCO 6" <br />OVER - <br />�MASONRY <br />r <br />OCT 2 8 Zull <br />Virtual Review Assist, Inc. <br />Plans Review completed and app d <br />for compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />6-11" T-4" 15'-9" <br />0 <br />SLOPE <br />5:12 <br />N <br />O-T <br />O� <br />J <br />W <br />SLOPE <br />4---5:12 <br />T-0" RIDGE <br />VENT <br />SLOP <br />512 <br />am <br />10'-0" RIDGE i <br />VENT <br />I I I <br />I <br />I <br />�SLOPE SLOPE I a N <br />512 5:12 OJ L° <br />RIDGE <br />VENT <br />I I <br />L_ — ir <br />_ _ I <br />SLOPE SLOPE <br />�5:12 5�l <br />L-- C <br />ROOF PLAN B <br />1 /811 = 1'-011 <br />0 <br />N <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />ROOF GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC, SECTION R806 <br />FORMULA = S.F. / 300 (1/300) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA 1 = 1268 SQ FT <br />VENTILATION REQUIRED = 609 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 306 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =1197 SQ IN <br />ATTIC AREA 2 = 445 SQ FT <br />VENTILATION REQUIRED = 214 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 108 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =425 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET (MEASURE <br />VERTICALLY) BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />(VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />* RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />* OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />* SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT, <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />* LOMANCO DECK -AIR - 9 SO. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACEABILITY TO MANUFACTURER AND PRODUCT <br />N <br />N <br />0 <br />E� <br />r <br />.) O "j ao <br />L0 <br />4 <br />J'e <br />O <br />w <br />0 <br />Q <br />N LL <br />> o0 <br />i 10 "? U <br />0 00 4) <br />N U 7C3� <br />r"' <br />O 2 o0 <br />0 <br />} O v- o Q <br />UO:It <br />—r <br />°cn V W D-v <br />W Oo E? <br />L <br />O� U <br />r-�a � <br />W <br />W W <br />W' <br />�LLl Uj Wpm <br />W~Q W W�E 00 Z <br />0�9�-1 0 �LL.UO�JO <br />Q U <br /><OXJQZW�0Z2p�l-Q� <br />pWawowpWOWXZ=) <br />C.) O O <br />Z <br />JQa>O W YFnZZLLpW OOW <br />- � �Wo�Upa- <br />Q :2 <br />opw o C) z <br />U-a p LL <br />O <br />O <br />Z NW <br />O� <br />(n ::) I` <br />O <br />0 M O <br />Q M <br />01 a. (`M <br />00 <br />zv� <br />W <br />W <br />JC:) <br />O <br />N <br />N <br />0 <br />N <br />r <br />tV <br />O <br />00 <br />(0 <br />00 <br />o <br />0 <br />0 <br />O <br />CD <br />N <br />O <br />C <br />O <br />N <br />O <br />N <br />O <br />N <br />CD <br />N <br />O <br />N <br />O� <br />N <br />00l <br />O <br />6 <br />= <br />Op <br />p <br />M <br />r <br />N <br />O <br />co <br />Oo <br />, <br />o, <br />M <br />o <br />6 <br />0 <br />� <br />o <br />'W <br />0 <br />O <br />' <br />NL0�0000000 <br />N <br />M <br />'IT <br />lf') <br />CO <br />r- <br />' n <br />r <br />CT <br />(_n <br />Z Z <br />-Zo <br />O <br />W <br />0Wv0 <br />w <br />U F- 5; <br />vo�o <br />F- <br />LO <br />^ <br />1l <br />rr ^^ <br />V) <br />O <br />M: <br />w H Q <br />Q <br />Z <br />W <br />~mOZ <br />=F- <br />=Z <br />N <br />(gotzIII <br />Z <br />M <br />W <br />CK <br />i-2zly <br />>- <br />M <br />WZZW <br />N <br />Ova2w <br />O <br />< <br />U Z Z <br />z <br />�Qo <br />QU <br />OU <br />O <br />CL <br />Z <br />A5 <br />a <br />Z <br />W <br />W <br />J <br />wo) <br />>(=) <br />LAST PLOT DATE <br />Jul. 21, 22 <br />z <br />0 <br />EXTERIOR <br />J <br />ELEVATIONS B & <br />ROOF PLAN <br />