Laserfiche WebLink
ROOF FINISH <br />ROOF FINISH <br />PER ELEVATION <br />PER ELEVATION <br />12 <br />10" <br />PAINTED <br />RAISED <br />�12 <br />4 <br />PROOF SHEATHING <br />MANUFACTURED <br />15 ROOF SHEATHING <br />MANUFACTURED <br />4" <br />2' 8, <br />04 <br />STUCCO <br />BAND <br />ROOF TRUSS <br />ROOF TRUSS <br />r# <br />4" 6" <br />21b. FOAM EPS <br />MTL DRIP EDGE <br />MTL DRIP EDGE <br />�� - <br />p <br />21P <br />_ <br />N - N <br />`D <br />ALUMINUM WRAP <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />1'-0" ALUMINUM SOFFIT <br />60 <br />11 <br />N <br />2 112" 1 1/2" <br />2 LB EPS FOAM <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />SMOOTH FINISH <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />ATTACHMENT DETAIL <br />ROOF O/H DETAIL <br />ROOF O/H DETAIL <br />BRACKETDETAIL <br />CORBEL DETAIL <br />5 <br />6 <br />7 <br />$ <br />3/49— 1 -0 <br />3/4" = 1'-011 <br />3/4 , = 1 -0 <br />3/41, <br />— 1 -0 <br />2'-8" <br />� <br />PAINTED RAISED <br />TRIM BAND <br />4" <br />6" PAINTED RAISED <br />(o <br />TRIM BAND <br />4" <br />m <br />0 <br />N <br />VSCORED <br />2" <br />LINES <br />4" <br />PAINTED RAISED <br />Zo <br />TRIM BAND <br />2 LB EPS FOAM <br />SMOOTH FINISH <br />USED <br />WINDOW DETAIL <br />WINDOW TRIM <br />DETAIL <br />GARAGE TRIM DETAIL <br />9INOT <br />10 <br />11 <br />,DOOR <br />L2 <br />N.T.S. <br />3/4" = 1'-0" <br />3/4 = 1 -0 <br />3/4 — 1 -0 <br />�) .o�I■III�I■1!IG�Irlll�ll;... <br />1, ..irlilll�l■Illm�ll■t�lllr" <br />ELEV AT 18'-0" <br />SECOND FLOOR CEILING <br />PAINTED RAISED <br />STUCCO BAND—, <br />7/8" STUCCO <br />OVER PLYWOOD — <br />CASING BEAD <br />W/ WEEPS OVER <br />FLASH I NG� <br />ELEV AT 10'-0" <br />11-1 SECOND FLOOR FFAk - <br />ELEV AT 8'-8" <br />FIRST FLOOR CEILING <br />WEEP SCREED <br />PAINTED RAISED <br />STUCCO BAND—­� <br />5/8" STUCCO <br />OVER CMU <br />ELEV AT 0'-0" <br />FIRST FLOOR FF <br />FRONT ELEVATION B <br />3/16" = 1'-0" <br />on NEI <br />son son on <br />If•Nl Monson <br />WEEP SCREED <br />No <br />�m <br />�.� <br />MEMO <br />a <br />� <br />4' OFF <br />RIDGE VENT <br />OIL, IFIIIF111111;711!1111111 <br />12 <br />..1�1■111�111�1■III�I■I�1/(�1/I\... <br />...111■11111■111■I■11111■Illr(■1111i1�111I■III��, <br />��1�11■nlmlllmnlmr11�I1111mI11�I■Illrl■Ill�i.._ <br />mIII Ilk. <br />ELEV AT 18'-0 <br />..�I�I■1/INI■I�I�lil/���I/Irlmnlmlrlf■t�nl/(�nlmlrlm�l■I�1�1■Irl>tlm�l ���,_ <br />'SECOND••- �=j <br />STUCCO%8" <br />OVER - L ■ <br />SECOND••FF <br />- <br />i■I■11 II■I■1■1■I■1 <br />CASING .D <br />rFIRST FLOOR CEILING W/ WEEPS WEEP <br />OVER SCREED <br />M FLASHING <br />.. <br />STUCCO.. '• C. <br />rffmmwww <br />OVER CMU (0 zo <br />,i - ••44 <br />- <br />REAR ELEVATION B <br />3/16" = 1'-0" <br />CASING BEAD <br />W/ WEEPS OVER <br />FLASHING <br />A5 <br />1'-0" <br />O.H. <br />-7/8" STUCCO <br />OVER FRAME <br />-DRIP "V" SCREED <br />8 <br />A5 <br />PAINTED RAISED <br />STUCCO BAND <br />-6" PAINTED RAISED <br />STUCCO BAND <br />-5/8" STUCCO <br />OVER CMU <br />-PAINTED METAL <br />GARAGE DOOR <br />ELEV AT 18'-0" <br />SECOND FLOOR FRAMING <br />ELEV AT 10'-0" _ <br />SECOND FLOOR FF - <br />ELEV AT 8'-6" <br />FIRST FLOOR CEILING <br />ELEV AT 0'-0" _ <br />FIRST FLOOR FF <br />RIGHT ELEVATION B <br />3/16" = 1'-0" <br />ELEV AT 18'-0" _ <br />SECOND FLOOR CEILING <br />I <br />I I I z= <br />CV J_ <br />U) <br />64" 10'-0" 10'-8" <br />DRIP "V,, <br />SCREED �5/8" STUCCO <br />OVER CMU <br />I <br />Iz_ <br />�u <br />lo= <br />4' OFF <br />RIDGE VENT 12 <br />5 <br />I <br />7/8" STUCCO <br />OVER FRAME --�.I <br />4' OFF <br />RIDGE VENT <br />NGLE ROOF <br />12 <br />I 5 <br />I <br />7/8" STUCCO <br />OVERFRAME <br />I I <br />L 10'-01, 6'-4" <br />MID -WALL <br />WEEP <br />SCREED <br />C.J. C.J. I C.J. G.J. <br />T-4" 8'-8" L 8'-8" 8'-8" <br />ELEV AT 10'-0" 12 <br />SECOND FLOOR FF `. 4 <br />ELEV AT 8'-8" MID -WALL <br />FIRST FLOOR CEILING 2'-0" WEEP <br />SCREED <br />00 <br />Zo <br />ELEV AT 0'-0" <br />FIRST FLOOR FF <br />LEFT ELEVATION B <br />3/16" = 1'-0" <br />r\\"-5/8" STUCCO <br />OVER CMU <br />NGLE ROOF <br />Al <br />12 <br />` 4 <br />I <br />I M <br />12 <br />C.J.41 <br />T-4" <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />FLASHING <br />OCT 2 8 222 <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 2th Edition <br />by Debra Anne Klahr PX2300 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING- JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICAL LY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />* EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) -RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />N <br />N <br />0 <br />N <br />L0 <br />a <br />P ( <br />R <br />qq yyyy <br />Q <br />z <br />6< <br />0 <br />w <br />0 <br />z <br />Q <br />V) <br />N LO F <br />1- 10 <br />_� L 11 o <br />M N (Li <br />V) <br />■r N <br />V M <br />j� =o <br />o Lo <br />ono a Q <br />U " a <br />— <br />.0 6 <br />U w QN <br />L �n <br />W <br />W <br />LLI Uj W Q F- <br />FF � _j (If zz� <br />of O0 0� ct< LL 0 0 00 O <br />Q Q <br />U <br />J< <br />:OpQz�W0-z20OFQQ <br />o o 0 <br />J <br />O <br />U) W W z 0 W rt m <br />0- U) W W � <br />Z U <br />Oda <br />LL <br />Z <br />-J ¢<WQFzWZO <br />O W F F 8 Y <br />Q <br />z Q Q <br />0� 0 OQ � <br />LLC O FQW <br />O <br />O <br />Z W <br />0 <br />(n O <br />Z <br />1. = `M Orl- <br />< U') <br />U) <br />�U)-ti <br />f -- 0- 00 <br />ZQO <br />V <br />W <br />W <br />JQ <br />O <br />d' <br />I <br />I <br />N <br />N <br />N <br />N <br />N <br />o <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />o <br />.N- <br />O_ <br />N <br />O <br />o <br />� <br />\ <br />o <br />_O <br />N <br />o <br />I <br />I <br />' <br />z <br />O <br />NLo <br />w <br />o <br />0 <br />0 <br />0 <br />0 <br />l <br />LOi <br />N <br />M <br />4lC) <br />VJ <br />}F <br />zz <br />Qw <br />® <br />-1--� <br />W <br />z <br />O_ <br />O <br />U <br />W O <br />0OU5 <br />0zj <br />0 <br />O�0 <br />� ! <br />Q <br />Z <br />W�a <br />� <br />�-Q <br />r—I <br />= <br />m � W <br />N <br />~ <br />N <br />o <br />zo! <br />W <br />W <br />0- <br />0 <br />zaf0 <br />O <br />LL <br />�zLL <br />z <br />°z <br />LI) < <br />ry <br />J <br />OU <br />O� <br />z <br />z <br />z <br />z <br />w <br />W <br />J <br />7— <br />T_ <br />o <br />LAST PLOT DATE <br />July 21, 2022 <br />Z <br />0 <br />J <br />EXTERIOR <br />ELEVATIONS B <br />