Laserfiche WebLink
(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />12 PRE ENGINEERED <br />WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />ZZ7 O.C. MAX. f SHINGLE ROOF <br />SHINGLE ROOF I <br />L <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />BAF <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS <br />I <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER <br />J w <br />— PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />><FOR <br />MORE INFO <br />w <br />16" O.C. 2X S.P.F. STUDS <br />o <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />O <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />J � <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />: w <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />L` _ <br />IO <br />INSULATION <br />N PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />�Y <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA <_ 1000 <br />(_B R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W! <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEAL E <br />IN <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />--METAL SEAT <br />ER PLAN <br />O <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />®.' . <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" — <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' 0/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />STD. 90 HOOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />C, w <br />4"x4" INSPECTION PORT AT <br />Ir <br />IL EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. o AT GARAGE CONTRACTOR <br />BASEBOARD M TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER NOTE: EXTEND DECO FINISH <br />MUNICIPALITY 4"to 6" BELOW GRADE <br />N Q FINISH GRADE <br />M ' i—III —=1 <br />00 <br />' I IfI I —III —I I III —_ <br />11, <br />6x6 W1.4xW1.4III I I F 1 I 1=1 11=1 11 I °' a Q 111_=1 I <br />1�I 11=1 1- <br />WWF ORFIBERMESH 11111EE <br />11I111111111111IIIII 1111�1�1 <br />�— <br />' I ;III 11 I I� 1 11 111=1 11=1 I 1=11541 <br />(3) # 5 REBAR ON 3"CHAIR (' • ,III, ; ,1 11-I I 1=1111 STD. 90'HOOK <br />(SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" V-8" <br />TYP 2-STORY WALL SECTION <br />SCALE: 3/4"=V-0" <br />00 <br />_T <br />CD Z <br />r � <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 112" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD ZIP / <br />2nd FLOOR WALL---- <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" " <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />eTE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING <br />WEEP SCREED <br />PLAN <br />• <br />INSTALLED PER MANUF, <br />2"x4" CROSS BRACE @ 48" <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />O/C FOR THE 1ST 2'-0" OF <br />NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. <br />BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING <br />IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />R <br />S6 <br />2x STUDS @ 1 <br />2"x BOT. PLAT[ <br />(2) 10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS: <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" <br />FOR ADDITIONAL INFORMATION. <br />15/32" OSB <br />EXPOSURE <br />SHEATHING <br />F <br />x <br />PROVIDE <br />x <br />BLOCKING AS <br />REQUIRED PER <br />f <br />o SECTION X-X IF <br />w NOT FULL <br />HEIGHT SHEET --A <br />z <br />G <br />FLOOR <br />SYSTIM <br />(2)- 2x TOP PLATE <br />BEYOND I <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING W <br />x <br />SOLID 2x U) <br />BLOCKING @ ALL j <br />C <br />C <br />SHEATHING O <br />EDGES(SEE <br />OPENING <br />SECTION X-X <br />a U <br />C <br />x <br />w <br />x <br />E <br />F <br />2xSTUDS W <br />BEYOND. _ <br />U) <br />SEE PLAN o <br />O <br />'--2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING <br />SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />3/8" "S" = NAIL 3/8" <br />SPACING <br />/rS 1/2„ <br />1/2" <br />s' 1/2„ <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2)12d <br />TOENAILS EA END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCKING <br />SECTION X-X <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUMY" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />o <br />w <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THANYa". <br />H <br />rn <br />? <br />0NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />c7 <br />@ NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />© NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMI <br />w <br />@ NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />to <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />O <br />w/ 8d COMMON NAIL <br />J <br />w O CrO <br />PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />} Q 0 rn <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />x P 0 0 ) <br />'(0O_ F m LL r <br />Q (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @VERTICAL <br />K cv W O O ~ <br />MEMBER IF GABLE END <br />LL C <br />NOTE: <br />8d NAILS FOR WALL SHEATHING MUST BE MIN .131"X 21/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />rc WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />SFF'O� <br />N� <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2x CRIPPLES @ <br />2"x10" OR GREATER HEADER <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />S4 <br />• INTERIOR HEADER: <br />10d NAILS @ <br />BOX HEADER (1) 2x SILL PLATE W/ (2) <br />8" O/C TYP. <br />ONLY 12d TOENAILS <br />DOUBLE 2x <br />• EXTERIOR HEADERS: <br />CRIPPLE STUD <br />(1) 2x SILL PLATE W/ (2) <br />TYPICAL (U.N.O.) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1 Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />RIBBONS ppxTFFLOOR TRUSS / <br />DETAIL FLOOR TRUSS)( 0 <br />SCALE: 1 1/2"=V-0" "6,) <br />NOTE: SEE TYPICAL WALL SEE SHEATHING <br />SECTION C/S3 FOR SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. _< 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd 5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 wl (10)10d 2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD (MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. TYPICAL TENSION 2600#.) <br />2X P.T. PLATE 6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />=III ° III —III —I <br />—I I1=III= <br />—I 11 11I— <br />(3) #5 CONT. ON 3" <br />l 8" 1 V-8" I 8" I CHAIR W/ 3" MIN. <br />L l CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rs— <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />BEA <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN._\ <br />SLAB W/6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />•� rid n° <br />III —I I —III I I d a a4. <br />° <br />IIIIIIIIPEII111 ° <br />d G a <br />(3) # 5 REBAR ON 3" CHAIR 4" V_ge <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />M <br />S6 <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4 <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />T-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16- <br />(3) <br />(3) <br />(2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />00 <br />FINISH GRADE <br />00 <br />1I111; 11 0 <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />OCT 2 0 2022 <br />Virtual Review Assist, In& " <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th Edition <br />by Debra Anne Klahr PX2300 <br />Ili AIM 1 . I' I . II �...1 11VI I] 11., 1, IL I I _. - - - - I11 1 1 I- Tf.- - -. - - - 1 <br />N <br />N <br />dui: <br />I� <br />y <br />1 J-`+ <br />LO <br />O <br />00 <br />e P <br />e <br />¢ <br />A <br />V �^. Cen AJG'J✓ BP"ea <br />W <br />O <br />W <br />0 <br />Z <br />Q <br />LI)n'L 0E <br />VJ 0 M 0 <br />) (� <br />V) U 000 <br />t co <br />dlM <br />A) >- L <br />V/ 2 O - <br />C O <br />�_ LL a O <br />U o TS1 • N Q <br />� �� <br />.N `..' } Yk <br />Q) i w Q <br />o E <br />2 CL ,0 <br />CQ <br />2_j <br />w0wvYW <br />W QZ~ � <br />000L/ <br />x LL <br />?aJZD" <br />X�OZO <br />oz>00 <br />QU(n <br />D_ O O m Z�ZJ� <br />0 O ZJaZYO~¢O�HWWQLLI <br />�Z <br />zLL oWoOO <br />OQ <br />o0 o <br />LL ¢ O <br />Eiyz <br />¢ LL <br />O <br />O <br />Z N <br />OLLJ <br />ti <br />O <br />0 cM <br />U) ('M <br />Cn <br />U) ti <br />Lid <br />It IZ M <br />2� <br />Z U <br />Z� <br />W <br />W C::)J <br />O <br />(0 <br />N <br />N <br />O <br />N <br />f` <br />N <br />O <br />O <br />CD <br />� <br />00 <br />O <br />O <br />O <br />�- <br />O <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />M <br />06 <br />d <br />00 <br />O <br />Lo <br />00 <br />O <br />C) <br />, <br />, <br />N <br />O <br />CO <br />w <br />C)CD <br />CD <br />CD <br />O <br />O <br />P <br />0 <br />(6 <br />0 <br />N'^ <br />�i ♦ <br />� <br />> <br />O <br />No <br />0 <br />C7 <br />0 <br />4 <br />0 <br />Ln <br />0 <br />6 <br />0 <br />f` <br />1 <br />Z Z <br />O <br />C)�-' <br />_ <br />W <br />owv) <br />0 F_ <br />O <br />v=�Q <br />Q <br />0 <br />M <br />=m0z <br />[V <br />v <br />H Z <br />O J <br />� <br />l• l <br />� <br />Z <br />00 <br />w N <br />rO, <br />U�zz <br />Q Q H <br />.J 2 z <br />O <br />Q <br />z <br />QO <br />QU <br />O" <br />O <br />J <br />w <br />r <br />Z <br />z <br />z <br />w <br />J <br />W04 <br />N <br />(=)LAST <br />PLOT <br />Jul. 21, 22 <br />DATE <br />O <br />Z <br />O <br />STRUCTURAL <br />DETAILS <br />-MONO <br />