My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
5528 11th St
Zephyrhills
>
Building Department
>
Building Plans
>
5528 11th St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 12:22:29 PM
Creation date
2/19/2025 9:15:18 AM
Metadata
Fields
Template:
Building Plans
Street #
5528
Location
11th St
Contractor
Lowell Lachance-Owner
Building Plans - Permit #
7313
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />Q <br />0 <br />AAMA 711 AAMA 711 AAMA 711 <br />' 'Vered 'Verified - , t/erifed <br />-� WindowSealoWindowSeal'WindowSealo <br />SUILDIN � r1u roNS, Self -Adhering Window/Door Waterproof Flashing SUILDING s 1tmaNs Self -Adhering Window/Door Waterproof Flashing Ut�DING_s 1 loas Self -Adhering Window/Door Waterproof Flashing <br />_MN! !WNW! • ! • • 3.2 <br />O <br />Prep & General Conditions `' w <br />• All surfaces must be dean, dust free, There are several ways to cut the house wrap, if your WRB (Housewrap) manufacturer has a <br />smooth and dry. specific method, follow it. There are two methods that we have found that work well, <br />• Do not apply over sealants or uncured <br />caulks containing solvents or plasticizers. <br />This includes most silicones and t <br />polyurethane based caulks. Read the I <br />sealant label carefully to determine if <br />the sealant is compatible with asphalt <br />products. WindowSeal or ArcFlash— STEP 1 <br />C\I CV <br />installed over incompatible or uncured Install a back dam and/or positive slope on I I <br />product may liquefy and cause stains, the sill. If water is allowed to sit on a flat sill a L0 <br />O N <br />streaks and drips. or allow to flow back into building, it could I I <br />• Test Window5eal or ArcFlash— adhesion cause water damage to your wood window - - O O <br />and perhaps your wall. There are three p p to the substrate. Some substrates and STEP 2A - Option A STEP 2B - Option B STEP 4 - Option A STEP 4 - Option B <br />sheathing boards, contain components common practices to avoid this. Cut an inverted "Y" in the WRB folding and Cut the WRB at the bottom of the rough on the vertical side of the window fold the WRB back past the jamb and tack it there. Using <br />which can reduce tape adhesion. If A. Build a Back Dam: Take a 1/2-inch thick secure it to the inside at the jambs and opening horizontally with your utility knife <br />adhesion is inadequate, prime with Home piece of plywood / OSB/wood by 1-2-inches your utility knife cut the WRB at the middle of the jamb. Then tape this WRB in place with a F— <br />sill. In the middle of your rough opening, from side to side and then again down the a- = <br />Stretch Liquid Adhesive. If Home Stretch wide and long enough to go across the entire cut the WRB down to the left corner of the middle of the window opening. 3 inch contractors/housewrap tape. This allows for a sealing or termination of the WRB. W � <br />Liquid Adhesive is not available, locate a rough window opening at the back of the sill. opening. Repeat on the right side, creating <br />compatible spray adhesive, again reading Nail in place. Follow instructions for flashing a "trian ular" cut. Go to the to center of the M <br />the label carefully for compatibility to g P <br />of the sill. An option to this is a heavy bead opening and cut straight down to the to of c <br />asphalt flashing products. P 9 9 P M p <br />of sealant at the back edge of the sill running the triangle. W <br />. Helpful Hint: In cold weather, keep the from one side of the sill to the other, jamb to <br />Window5eal° or ArcFlash— in a warm space jamb. Q W <br />before use. If necessary cut what you need B. Build a self -draining, sloped surface _ <br />per window one at a time and keep the f y O U <br />toward the outside. A piece of beveled siding, p� <br />rest in the warm space. It will be easier to the width of the rough opening, nailed and -Mnput,1�✓ <br />work with. Window5eal is designed to be¢ 41'End <br />used in ambient temperatures and surface placed at the bottom of the rough opening <br />P o a will create a positive slope for the flashing d��=Seal <br />temperatures between 40 F (5 C) and p Pe 9 <br />120* F (49' Q. Using Poly Walls Polybond membrane. Thick side toward the inside, thin <br />Liquid Adhesive can lower the WindowSeal side towards outside. Follow instructions for <br />application temperature to 25" F (-4" C). flashing of the sill. <br />C. Do both A & B above. This ensures both a <br />When installing Window5eal° or back dam (a place for any waterto stop) and STEP 5 STEP 6 <br />ArcFlash" flashing tape on top of Weather _ Temporarily secure WRB above the header Cut a section of WindowSeal) the width of <br />Resistant Barriers (aka: House Wraps) our a sloped surface (for the water to exit). — <br />exposing the substrate. the rough opening greater than 9-inches. <br />Window5eal becomes a secondary system, _ VERY IMPORTANT / PLEASE NOTE: For the Centering the tape across the sill, remove <br />- - <br />• We recommend rolling Window5eal° with suggestions noted above to work proper lyyou STEP 3A STEP 3B the release liner and install WindowSeal° on <br />the sill. O� co ca <br />a hand -roller. <br />need to accountforthe addition ofthe3/8-inch At top of the WRB horizontally cut with a utility knife from edge to edge. At each of the top co N <br />to 1/2-inch that these techniques will utilize corners cut the WRB at a 45 degree angle roughly 6-inches heading away from the window. • I <br />co N <br />. In cold weather applications, Polybond corn <br />Clear Liquid Adhesive or mechanical in your rough opening to ensure that your a 00 rn <br />window will fit properly... so plan in advance.�.q <br />fasteners (plastic cups, staples) may be W �I ZI <br />required to ensure proper adhesion. CS c 2 c,4 <br />W <br />POLY WALL® BUILDING SOLUTIONS: -- POLY WALL® BUILDING SOLUTIONS: _ = POLY WALL® BUILDING SOLUTIONS: P <br />Moisture and air' Stop erect Wi� �. Moisture and it Stop Her @ ---�—_— �►�,��. — ,��g sture and Air Stop !-Mere '�'6 �' Z <br />>vs <br />888-976-POLY (7659) • www.poly-wall.com MADE`n,W I 888-976-POLY (7659) • www.poly-wall.com MADE- E-i� A 888-976-POLY (7659) • www.poly-wall.com M;qp"` gA <br />CL <br />W q <br />�6 � q W <br />h <br />�•� O <br />AAMA 711 FUM= AAMA 711 <br />Verified _ Q Verified ALTERNATIVE PRODUCTS WITH FLORIDA PRODUCT APPROVAL (S) MAY BE <br />Pebyiftlt, WindowSealoWindowSeal SUBSTITUTED. SUPPORTING DOCUMENTATION SHALL BE SUPPLIED AND <br />atIILDIN so�IrloNs Self -Adhering Window/Door Waterproof Flashing - SUILDINo+S-0it NS. Self -Adhering Window/Door Waterproof Flashing THE RESPONSIBILITY OF CONTRACTOR AND OR OWNER. <br />installation Instructions <br />p Y <br />r tf r <br />_• indox <br />}dp�aseA f 1 <br />in to j <br />- STEP 11 0 ;' <br />Roll entire surface of Window5eal° with r <br />STEP 7 STEP 9 a hand -roller to finalize and complete the <br />Cut at the corners of the rough opening so Set window into rough opening, plumb,level, bond. (DO NOT INSTALL Window5eal' STEP 13 <br />that the WindowSeal© may be folded onto and square per manufacturer's instructions. over the bottom window flange. Leaving Fold the WRB back in place over the <br />the WRB surface. this area open will allow water to drain to Window5eal® head flashing and secure with <br />the exterior WRB surface in the event of a WindowSeal®. �l <br />window leak.) p) fl <br />tu <br />6 IL <br />C�_ <br />r (, laid 0 <br />it (� S <br />l 7�' P '^ 'r -....1„ <br />I <br />(n <br />�rV <br />-vv�Iru!;H i _ i j 1 N O +� <br />Wall npM` <br />i - r <br />4� <br />STEP 12 <br />STEP 10 STEP 14 L c� <br />STEP $ Measure and cut 1 place of WindowSeal Q) Ln <br />Measure and cut 2 sections of Window- that will overlap and extend 2-inches Cut 2 sections of Window5eal' 6-inches to c il) <br />Cut flashing patches of Window5eal and Seal' that will overlap the sill WindowSeal° beyond the jambflashings ontotheexposed cover the 45-degree cuts in the WRB. Lp <br />install at each of the sill corners. at the bottom and extend 3-inches above substrate. As an option for arched window U <br />the rough opening at the header extending apply our Arc Flash". M <br />onto the exposed substrate. Install these N <br />vertical sections of Window5eal' over the CD <br />jamb flanges and to the substrate or WRB. N <br />- - POLY WALL BUILDING SOLUTIONS: POLY WALL® BUILDING SOLUTIONS: - --- <br />� "NLIM PROJECT N0 <br />'. �TOIDTIONS _ r+eeo� NI[DIi7G SOnITFONS -- ^ 1� �y� <br />888-976-POLY (7659) • www.poly-wall.com _ I 888-976-POLY (7659) • www.poly-wall.com - REvoi/wit7 O <br />IOU <br />duFA17E-11�-USA_ <br />2023-55 <br />Thomas L Digitally signed by Signed and sealed by T.L. Han sonPE\,\\�1111 His <br />Thomas L using a Digital Signature and at <br />G-H-,°,��i� <br />Hanson:A01410 Hanson:A01410D00000 Printed copies of this document <br />are not considered signeDWG NO. <br />D00000177EF31 177EF31B4E000015ADA sealed and the signature most be= �— <br />Date: 2023.10.24 verified on any electronic co tP s, <br />B4E000015ADA 1 1:15:36-04'00' '%°�,s <br />'//; St WI \\sass <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.