<br />PART 1 - GENERAL
<br />2.02 ACCESS PANELS, FIRE DAMPERS, AND FIRE/SMOKE DAMPERS
<br />2-08 DUCTWORK CONSTRUCTION
<br />ROUND STEEL DUCT GAGE
<br />0.01 GENERAL SCOPE
<br />A. THEGETIERAI. AND MECHANICAL CONTRACTORS SHALL PROVIDE
<br />A. THE $MEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL
<br />DUCT LONGITUDINAL
<br />PART 3-EXECDRON RIGID DUCT- SINGLE LINE
<br />A THIS PROJECT WILL REQUIRE INSTALLATION OF NEW HVAC SYSTEMS AS
<br />ACCESS PANELS TO ALLOW ACCESS TO VOLUME DAMPERS ABOVE
<br />ASSOCIATION'S'FlBROUS GLASS DUCT CONSTRUCTION STANDARDS'
<br />DIAMETER SPIRAL SEAM SEAM
<br />INDICATED.
<br />PIASTER OR GYPSUM CEILINGS, TURNING VANES, FIRE DAMPERS,
<br />AND 9HVAC DUCT CONSTRUCTION STANDARDS• SHALL BE
<br />IN INCHES IN INCHES IN INCHES
<br />3.01 INSTALLATION
<br />FLEXIBLE OUCH -INSULATED, SINGLE LINE
<br />FIRE/SMOKE DAMPERS, DUCT -MOUNTED SMOKE DETECTORS, AND
<br />CONSIDERED PART OF THE SPECIFICATIONS FOR THIS PROJECT. ANY
<br />1.01 GENERAL DOCUMENTS
<br />WHERE. REQUIRED FOR THE MAINTENANCE OF ALL MECHANICAL
<br />WORK THAT DOES NOT COMPLY WITH THESE STANDARDS MAY BE
<br />3-8 28 28
<br />A OCOORDINATE WORK WITH OTHER TRADES AND EXISTING CONDITIONS \_/ FLEXIBLE DUCT - INSULATED
<br />EQUIPMENT. ACCESS PANELS SHALL HAVE A FIRE RATING EQUAL TO
<br />REJECTED AT ANY TIME DURING THE PROJECT.
<br />9- 14 25 26
<br />PRIOR TO BEGINNING WORK. MECHANICAL CONTRACTOR SHALL PROVIDE
<br />A INSTALLATION SHALL HE IN ACCORDANCE WITH THE FLORIDA BUILDING
<br />THE PENETRATED ASSEMBLY, WITH A MINIMUM FIRE RATING OF ONE (1)
<br />15 - 26 26 24
<br />ROOTING AND OFFSETS NECESSARY TO AVOID CONFLICT WITH
<br />CODE TIM EDITION 2020 (EFFECTIVE 12I31202D), WHICH INCLUDES THE
<br />HOUR,
<br />B. REFER TO BASIC MATERIAL REQUIREMENTS ON THIS SHEET FOR
<br />27 - 30 24 22
<br />STRUCTURE. FINISHES, AND WORK OF OTHER TRADES. ® SUPPLY AIR DUCT - SECTION
<br />RORIDA BUILDING CODE, MECHANICAL., FLORIDA RUADING CODE,
<br />DUCTWORKAND DUCT INSULATION MATERIAL SELECTIONS-
<br />37-50 22 20
<br />ENERGY CONSERVATION, AS WELL AS FLORIDA FIRE PREVENTION CODE,
<br />B. THE MECHANICAL CONTRACTOR SHALL ATTACH A DRIGHRY-COLORED
<br />51 60 20 18
<br />RETURN
<br />7TH EDITION 2020 (EFFECTIVE 12)31Y102% ALL EQUIPMENT SHALL BE UL
<br />STRIP OF PLASTIC TAPE TO EVERY DUCT -MOUNTED ACCESS PANEL THE
<br />C M I DU CT DIMENSIONS SHOWN ON THE CONSTRUCTION DOCUMENTS
<br />61 - 84 18 16
<br />3.02 DISNFECTNG OF POTABLE WATER SYSTEM AIR DUCT -SECTION
<br />LIST ED.
<br />STRIP SHALL BE OF SUFFICIENT FENCE TO HANG A MINIMUM OF 12"
<br />ARE INSIDE CLEAR DIMENSIONS. THE MECHANICAL CONTRACTOR
<br />BELOW THE BOTTOM OF THE ASSOCIATED DUCT.
<br />SHALL PROVIDE FLEXIBLE CONNECTIONS BETWEEN EACH ITEM OF
<br />ROUND At UMINIAN DUCT GAGE
<br />A. THE SYSTEM SHALL BE FILLED WITH A SOLUTION CONTAINING 50 PARTS 0 DUCT TRANSITION - SINGLE LINE
<br />S. THE MECHANICAL. WORK SHALL INCLUDE FURNISHING ALL. LABOR
<br />MECHANICAL EQUIPMENT AND ITS ASSOCIATED DUCT'(S). ALL ITEMS
<br />DUCT LONGITUDINAL
<br />PER MILLION OF AVAILABLE CHLORINE AND ALL ALLOWED TO STAND 24
<br />EQUIPMENT, MATERIALS AND SERVICE NECESSARY FOR AND
<br />C. THE MECHANICAL CONTRACTOR SHALL PROVIDE A FIRE DAMPER AT
<br />OF THE HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
<br />DIAMETER SPIRAL SEAM SEAM
<br />HOURS BEFORE FLUSHING AND RETURNING TO SERVICE. DISINFECTION � DUCT TRANSITION
<br />REASONABLY INCIDENTAL TO THE PROPER COMPLETION OF ALL
<br />EVERY DUCT PENETRATION OF A FIRE -RATED ASSEMBLY AND A
<br />INCLUDING, BUT NOT LIMITED TO, AIR HANDLERS, FANS, DUCTWORK,
<br />IN INCHES IN INCHES IN INCHES
<br />PROCEDURE AND RESULT SHALL BE SUBJECT TO THE APPROVAL OF THE
<br />MECHANICAL WORK SHOWN ON THE. DRAWINGS AND AS SPECIFIED. ALL
<br />FIRE/SMOKE DAMPER WITH A MINIMUM FIREISMOKE RATING OF TWO (2)
<br />DIFFUSERS. AND GRILLES SHALL NOT BE SUPPORTED BY THE CEILING
<br />LOCAL MECHANICAL INSPECTOR ELBOW WITH'AIRFOIL' TURNING VANES
<br />16
<br />MATERIAL SHALL BE NEW.
<br />HOURS AT EVERY DUCT PENETRATION OF A SMOKE ASSEMBLY OR
<br />OR CEILING SUSPENSION SYSTEM, BUT INSTEAD SHALL BE
<br />3 -14 .026 .032
<br />CHASE EACH FIREISMOKE DAMPER SHALL CLOSE AND THE
<br />SUPPORTED BY THE BUILDING STRUCTURE.
<br />15- 26 .032 .040
<br />3.03 TEST �y-�
<br />C. EACH PROSPEC DVF MECHANICAL CONTRACTOR SHALL EVALUATE THE
<br />ASSOCIATED AIR HANDLER SHALL SHUTDOWN IF EITHER OF THE AIR
<br />27 - 36 .040 .050
<br />1 - I IVD MANUAL VOLUME DAMPER (VD)
<br />SCOPE OF WORK THOROUGHLY PRIOR TO SUBMITTING A BID.
<br />HANDLERSES ' OR THE SPACSMOKE DETECTORS ARE AC RVATED.
<br />D. ALL ELBOWS SHALL HAVE A ONE AND ONE-HALF (1.5) CENTERLINE
<br />37 - 50 .050 .063
<br />A. ALL MECHANICAL SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH THE 7a'NY�'+
<br />RADIUS -TO -WIDTH OR RADIUSTO-DEPTH RATIO OR SHALL BE
<br />ZOO DUCT LEAKAGE PERFORMANCE
<br />FLORIDA BUILDING CODE MECHANICAL. ALL TESTS SHALL BE APPROVED BY
<br />D. SOME CONDUIT, PIPING, AND OTHER OBSTACLES MAY NEED TO BE
<br />D_ THE MECHANICAL CONTRACTOR SHALL PROVIDE ADDITIONAL
<br />CONSTRUCTED WITH SINGLE BLADE TURNING VANES. ANGULAR
<br />THE LOCAL MECHANICAL INSPECTOR AND SHALL BE OBSERVED BY A
<br />RELOCATED AND SUCH RELOCATION SHOULD BE INCLUDED IN EACH
<br />DUCTWORK AND PIPING SUPPORTS WITHIN EIGHTEEN (18) INCHES OF
<br />TAPERS SHALL BE LIMITED TO THIRTY (30) DEGREES FOR
<br />A FOR AIR CONDITIONING SYSTEMS OF FIFTEEN (15) TONS OR
<br />REPRESENTATIVE OF THE ARCHITECT. ® SUPPLY AIR DIFFUSER
<br />PROSPECTIVE MECHANICAL CONTRACTOR'S BID-
<br />BOTH SIDES OF ALL FIRE -RATED ASSEMBLIES. DUGTWORK AND PIPING
<br />CONTRACTING TAPERS AND TWENTY (20) DEGREES FOR EXPANDING
<br />GREATER CAPACITY, AN INDEPENDENT TEST AND BALANCE
<br />SHALL NOT BE SUPPORTED BY FIRE -RATED WALLS, BUT INSTEAD SHALL
<br />TAPERS.
<br />CONTRACTOR SHALL PERFORM A DUCT LEAKAGE TEST IN
<br />3.04 SYSTEM IDENTIFICATION RETURN AIR OR VENTILATION EXH. GRILLE
<br />E. THIS ENGINEER 13 NOT RESPONSIBLE FOR MATERIALS. METHODS.
<br />BE SUPPORTED BY THE BUILDING STRUCTURE
<br />COMPLIANCE WITH SMACMA'S'HVAC AIR DUCT LEAKAGE TEST
<br />INSTALLATION, AND CONSTRUCTION WHICH DEVIATE FROM THESE
<br />CONSTRUCTION DOCUMENTS AND SPECIFICATIONS.
<br />2.03 SMOKE DETECTORS
<br />E. THE MAXIMUM LENGTH OF NEW FLEXIBLE DUCT SHALL BE 1014Y.
<br />FLEXIBLE DUCT SHALL BE INSTALLED AND SUPPORTED SO AS TO
<br />MANUAL" TO VERIFY THE FUNCTION OF THE DESIGN AND THE
<br />WORKMANSHIP OF THE MECHANICAL CONTRACTOR. A DUCT
<br />A THE MECHANICAL CONTRACTOR SHALL PROVIDE IDENTIFICATION TAGS
<br />FOR ALA. NEW EQUIPMENT, PIPING AND VALVES IN THE BUILDING. TAGS ® EXHAUST AIR GRILLE OR CEILING
<br />PREVENT THE USE Or EXCESS DUCT MATERIAL, PREVENT
<br />LEAKAGE TEST USED TO CONFIRM DUCT LEAKAGE CLASS
<br />SMALL BE METAL WITH ENGRAVED UNIT/TAG NUMBER. MOUNTED EXHAUST FAN
<br />1.02 SUBMITTALS
<br />A. INDIVIDUAL AIR HANDLING SYSTEMS WITH A DESIGN CAPACITY OF MORE
<br />SMALL
<br />DISLOCATION OR DAMAGE, AND PREVENT CONSTRICTION OF THE
<br />DUCT BELOW THE RATED DUCT DIAMETER FLEXIBLE DUCT BENDS
<br />SHALL BE CONDUCTED AT THE PRESSURE FOR WHICH THE
<br />DUCT WAS DESIGNED AND CONSTRUCTED.
<br />3.05 TESTING, ADJUSTING. BALANCING AND COMMISSIONING O O
<br />A MATERW S OR PRODUCTS SPECIFIED HEREIN AND/OR INDICATED ON
<br />THAN 2000 CFM AUTOMATICALLY SHUT DOWN BY MEANS OF AN
<br />APPROVED SMOKE DETECTOR PLACED IN THE SUPPLY AIRFLOW AFTER
<br />SHALL MAINTAIN A CENTERUME RADIUS OF NOT LESS THAN ONE AND
<br />THERMOSTAT OR HUMIDISTAT - WALL MOUNTED
<br />DRAWINGS BY TRADE NAME, MANUFACTURER'S NAME OR CATALOG
<br />ANY AIR FILTERS AND BEFORE ANY BRANCH CONNECTIONS IN THE
<br />ONE-HALF (1.5) DUCT DIAMETERS. SAGS SHALL NOT EXCEED
<br />B. DUCT CONSTRUCTION AND SEALING SYSTEMS SHALL MEET THE
<br />BE THE MECHANICAL CONTRACTOR SHALL ENSURE THAT THE MEC 4AMCAL DUCT SMOKE DETECTOR
<br />NUMBERS SHALL BE INTERPRETED AS ESTABLISHING A STANDARD OF
<br />SUPPLY DUCTWORK
<br />ONE-HALF (LIES) INCH PER LINEAR FOOT OF FLEXIBLE DUCT. HANGERS,
<br />REQUIREMENTS OF THE FLORIDA ENERGY CONSERVATION
<br />SYSTEMS ARE TESTED AND BALANCED.
<br />OUALI I Y AND DESIGN. SUBSTITUTIONS MAY BE ALLOWED IF THEY MEET
<br />SADDLES, AND OTHER SUPPORTS SHALL HAVE A MINIMUM WIDTH OF
<br />CODE AND SMACNAS "FIBROUS GLASS DUCT CONSTRUCTION
<br />THE QUALITY STANDARDS AND DESIGN IN ITNUNLESS UNLESS OTHERWISE
<br />S. MULTIPLE AIR HANDLING SYSTEMS SERVING THE SAME SPACE WITH A
<br />ONE AND ONE-HALF (1.5) INCHES. THE MECHANICAL CONTRACTOR
<br />STANDARDS' AND'HVAC DUCT CONSTRUCTION STANDARDS'.
<br />C. THE MECHANICAL CONTRACTOR SHALL PERFORM ALL TESTING. �-U - 3/4-UNDERCUT
<br />NOTED.
<br />COMBINED DESIGN CAPACITY OF MORE THAN 2000 GEM SHALL
<br />SHALL PROVIDE SUPPORT FOR NEW AND MODIFIED EXISTING FLEXIBLE
<br />IF THERE IS A CONFECT AMONG THE STANDARDS, THEN THE
<br />ADJUSTING, BALANCING, AND DATA RECORDING NECESSARY TO
<br />AUTOMATICALLY SHUT DOWN BY MEANS OF AN APPROVED SMOKE
<br />DUCTWORK IN'I HE SCOPE OF WORK WITH A MAXIMUM SPACING OF
<br />MORE STRINGENT STANDARD SHALL BE ENFORCED.
<br />ESTABLISH THE CAPACITY AND QUALITY OF THE SYSTEMS AND CONFIRM
<br />-G-� 16X16 DOOR GRILLE
<br />e. PRIOR TO STARTING THE PROTECT, THE MECHANICAL CONTRACTOR
<br />SHALL STUDY THE COMPLETE SE Of CONSTRUCTION DOCUMENTS AND
<br />DETECTOR PLACED IN THE SUPPLY AIRFLOW AFTER ANY AIR DETERS
<br />AND BEFORE ANY BRAVED CONNECTIONS IN THE SUPPLY DUCTWORK,
<br />F-W. UNLESS OTHERWISE NOTED ON THE CONSTRUCTION
<br />DOCUMENTS OR AUTHORIZED BY MECHANICAL ENGINEER OF RECORD.
<br />C EA THE MECHANICAL CONTRACTOR SHALL SEAL ALL TRANSVERSE
<br />THE SATISFACTORY COMPLETION OF ALL ASPECTS OF THE SCOPE OF
<br />WORK THIS WILL INCLUDE ALL SYSTEMS WITHIN THE SCOPE OF WORK
<br />COORDINATE WITH THE MANUFACTURER(S) AS REQUIRED TO PROVIDE
<br />AS WELL AS AN APPROVED SMOKE DETECTORPLACED IN THE RETURN
<br />JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL
<br />ANYTIME FLOWS OR CALCULATIONS ARE SHOWN ON PLANS, DETAILS OR SPIN -IN FITTING WITH VOLUME DAMPER
<br />EQUIPMENT SUBMITTALS TO SUBMIT TO IRIS ENGINEER FOR REVIEW
<br />AIRFLOW AFTER ANY BRANCH CONNECTIONSTIONSIN THE REl'URN
<br />F. SURFACES UPON WHICH CLOSURE OR SEALING PRODUCTS ARE TO BE
<br />PENETRATIONS TO A MAXIMUM ALLOWABLE DUCT LEAKAGE
<br />SCHEDULES, TEST 8 BALANCE IS REOlIREO.
<br />AND APPROVAL. THE EQUIPMENT SUBMITTALS SHALL INCLUDE
<br />DUCTWORK AND BEFORE ANY EXHAUST OR OUTSIDE AIR
<br />APPLIED SHALT- BE CLEAN AND DRY IN ACCORDANCE WITH THE
<br />CLASS OF THREE (3) CFM PER 100 SQUARE FEET OF DUCT AREA
<br />DIMENSIONS. WEIGHTS, SPECIFIED ACCESSORIES AND REQUIRED
<br />CONNECTIONS. MORE INFORMATION IS AVAILABLE IN CHAPTER 4 OF
<br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. ALL DUCTWORK
<br />(1.5%) FOR ROUND DUCT AND SIX (6) CFM PER 100 SQUARE
<br />rBODI BACKDRAFT DAMPER
<br />CLEARANCES. AS WELL AS FAN CURVES. SOUND LEVELS, CONSTRUCTION
<br />NFPA IBA
<br />SHALL BE SEALED WITH A NON -HARDENING, NON -MIGRATING MASTIC
<br />FEET OF DUCT AREA (3%) FOR ALL OTHER DUCT TYPES.
<br />O. THE MECHANCAL CONTRACTOR SHALL ENSURE THAT THE BUILDING IS
<br />DETAILS, WARRANTY INFORMATION, AND ALL OTHER RELEVANT DATA
<br />OR LIQUID ELASTIC SEALANT AS REQUIRED TO MEET THE FLORIDA
<br />UNLESS OTHERWISE NOTED ON THE CONSTRUCTION
<br />UNDER POSITIVE PRESSURE AT THE CONCLUSION OF THE TEST AND
<br />ENERGY CONSERVATION CODE. THE MECHANICAL CONTRACTOR
<br />DOCUMENTS OR AUTHORIZED BY MECHANICAL ENGINEER OF
<br />BALANCE PROCESS. IF THE BUILDING IS NOT UNDER POSITIVE PRESSURE MD MOTORIZED DAMPER
<br />C. IF ALTERNATES TO THE BASIS OF DESIGN ARE SUBMITTED, THE
<br />C. THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS/HER BID ALL
<br />SMALL PROVIDE HOT -DIPPED GALVANIZED STEEL FASTENERS,
<br />RECORD. TRANSVERSE. JOINTS ARE CONNECTIONS OF TWO
<br />AT THE CONCLUSION OF THE TEST AND BALANCE PROCESS, THEN THE
<br />MECHANICAL CONTRACTOR SHALL PROVIDE A CLEAR, DETAILED
<br />H
<br />COSTS ASSOCIATES W FURNISHING, T AND WIRING ALL
<br />ANCHORS, RODS. STRAPS. TRIM, AND ANGLES FOR INTERIOR
<br />DUCT OR FITTING ELEMENTS ORIENTED PERPENDICULAR TO
<br />TEST AND BALANCE AND MECHANICAL CONTRACTORS SHALL IMMEDIATELY
<br />SUMMARY IN THE SUBMITTALS OF THE DIFFERENCES BETWEEN THE
<br />SMOKE DETECTORS. THIS WILL INCLUDE,, B NOT
<br />BUT NOT NECESSARILY BE
<br />DUCTWORK SUPPORTS. INTERIOR DUCTWORK SUPPORT SPACING
<br />THE DIRECTION OF THE AIRFLOW. LONGITUDINAL SEAMS ARE
<br />AND WITHOUT DELAY NOTIFY THE ARCHITECT AND MECHANICAL ENGINEER XX FD-FIRE DAMPER, SD=SMOKE DAMPER
<br />SUBMITTED EQUIPMENT AND THE BASIS OF DESIGN. MECHANICAL
<br />LIMITED TO, MAKING DUCTWORK MODIFICATIONS AS REQUIRED BY THE
<br />SHALL NOT EXCEED V-W.
<br />JOINTS ORIENTED IN THE DIRECTION OF THE AIRFLOW. DUCT
<br />OF RECORD. FSD = FIREISMOKE DAMPER
<br />ENGINEER OF RECORD MAY ACCEPT OR REJECT THE ALTERNATES.
<br />MANUFACTURER'S INSTRUCTIONS. THE GENERAL OR MECHANICAL
<br />WALL PENETRATIONS ARE OPENINGS MADE BY SCREWS,
<br />TO MATCH ASSEMBLY
<br />CONTRACTOR SMALL SUB -CONTRACT THE PURCHASE AND WIRING OF
<br />G ALL DUCTWORK INSULATION, FITTINGS, COVERS, AND FINISHES SHALL
<br />NONSAELF-SEUNG FASTENERS, PIPES. TUBING. RODS, AND
<br />E. THE MECHANICAL CONTRACTOR SHALL, UPON COMPLETION OF ALL PENETRATION RATING (1-HR, 2-HR. ETC.):
<br />1.03 SHOP DRAWINGS
<br />ALL SMOKE DETECTORS TO THE ELECTRICAL CONTRACTOR TO ENSURE
<br />HAVE, A MAXIMUM FLAME SPREAD RATING OF 25. A MAXIMUM SMOKE
<br />WIRE ROUND AND FLAT -OVAL SPIRAL LOCK SEAMS NEED NOT
<br />NECESSARY TESTING AND BALANCING AND AT LEAST ONE (1) WEEK PRIOR PROVIDE ACCESS PANEL FOR ACCESS
<br />THE SMOKE DETECTORS' COMPATIBILITY WITH THE FIRE ALARM
<br />DEVELOPMENT RATING OF 50, AND SHALL BE IN COMPUANCE WITH
<br />BE SFAI FD PRIOR TO ASSEMBLY BUT SMALL RE COATED AFTER
<br />TO SUBSTANTIAL COMPLETION, SUBMIT THREE (3) BOUND COPIES OF THE
<br />A. PRIOR TO STARTING THE PROJECT, THE MECHANICAL CONTRACTOR SHALL
<br />SYSTEM.
<br />NFPA 90A PROVIDE MINIMUM OF W" FIBERGLASS WITH FOIL/SCRIM
<br />ASSEMBLY TO REDUCE LEAKAGE ALL OTHER CONNECTIONS
<br />TEST AND BALANCE AND COMMISSIONING REPORTS TO THE GENERAL Hb CONNECTION - NEW TO EXISTING WORK.
<br />STUDY THE COMPLETE SET OF CONSTRUCTION DOCUMENTS AND
<br />VAPOR BARRIER ON THE BACK PAN OF ALL NEW AIR DEVICES.
<br />ARE CONSIDERED TRANSVERSE JOINTS INCLUDING, BUT NOT
<br />CONTRACTOR AND MECHANICAL ENGINEER OF RECORD.
<br />COORDINATE WITH THE OTHER TRADES AS REQUIRED TO PROVIDE SHOP
<br />U. THE CONTRACTOR -PROVIDED INSTRUCTIONS TO THE OWNER FOR
<br />UNITED TO. SPINdNS, TAPS OR OTHER BRANCH CONNEC710NS,
<br />DRAWINGS TO SUBMIT TO MECHANICAL ENGINEER OF RECORD FOR
<br />OPERATING AND MAINTAINING ALL MECHANIST EQUIPMENT SNARL
<br />H- ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10.0' FROM ANY
<br />ACCESS DOOR FRAMES, AND DUCT CONNECTIONS TO
<br />F. THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HISMER BID THE COST NEW LINE TYPE
<br />APPROVAL. TI1E SHOP DRAWINGS MAY BE SUBMITTED AS HAND -DRAWN
<br />INCLUDE TESTING ALL AUTOMATIC SHUTDOWN DEVICES AT LEAST ONCE
<br />EXHAUST DO RET OR VENT PIPE (UNLESS THE VENT PIPE IS AT LEAST
<br />EQUIPMENT. MORE INFORMATION 13 AVAILABLE IN CHAPTER 35
<br />OF ANY SHEAVE CH AGES REQUIRED FOR REBALANCING THE SYSTEM.
<br />NOTES UPON A COPY OF THE CONSTRUCTION DOCUMENTS. THE
<br />PER YEAR SPECIAL INSTRUCTIONS SHALL BE GIVEN WITH REGARD TO
<br />TWO (2) FEET ABOVE THE OUTSIDE AIR IN TAKE). THE MECHANICAL
<br />OF ASHRAE'S "FUNDAMENTAL$ HANDBOOK".
<br />- - - - EXISTING LINE TYPE
<br />CONSTRUCTION DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND
<br />ENSURING THAT SMOKE SENSING DEVICES ARE PROPERLY CLEANED
<br />CONTRACTOR SHALL PROVIDE SCREENS ON ALL OUTSIDE AIR INTAKES
<br />3.06 SUBSTANTIAL AND FINAL COMPLETION
<br />INTENDED BOLDLY TO CLARIFY THE SCOPE OF WORK AND INDICATE THE
<br />AND CALIBRATED IN ACCORDANCE WITH THE MANUFACTURER'S
<br />AND EXHAUST OUTLETS AT NO LESS THAN 1/4" BY 114 AND NO
<br />D. ALL DUCTWORK SHALL BE INSPECTED BY MECHANICAL
<br />GENERAL ARRANGEMENT OF SYSTEMS. THE CONSTRUCTION DOCUMENTS
<br />REQUIREMENTS. MORE INFORMATION IS AVAILABLE IN CHAPTER 4 OF
<br />GREATER THAN 1? BY 1/2". THE MECHANICAL CONTRACTOR SHALL
<br />ENGINEER OF RECORD PRIOR TO BEING COVERED OR
<br />A THE MECHANICAL CONTRACTOR SHALL MAINTAIN A SET OF
<br />ARE NOT INTENDED TO ALERT THE MECHANICAL CONTRACTOR OF ALL
<br />NFPA 90k
<br />PROVIDE MOTORIZED DAMPERS IN ALL OUTSIDE AIR DUCTS. EACH
<br />INSULATED. . TOWNER AND MECHANICAL ENGINEER OF
<br />CONTINUOUSLY UPDATED, REPRODUCIBLE AS -BUILT DRAWINGS DURING
<br />OBSTACLES. THE SHOP DRAWINGS SHALL SHOW THE COORDINATION OF
<br />MOTORIZED DAMPER SHALL BE CONTROLLED TO OPEN IN OCCUPIED
<br />RECORD SHALL BE PRESENT DURING ALL DUCT LEAKAGE
<br />CONSTRUCTION AND PROVIDE A COMPLETE SET OF THOSE DRAWINGS IN MECHAMAL SHEET NIX
<br />DUCTWORK AND MECHANICAL EOLAPMENT INSTALLATION WITH EXISTING
<br />E THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL PROVIDE
<br />MODE.
<br />TESTING AND THE DUCTWORK SHALL BE TESTED AS
<br />BOTH ELECTRONIC AND HARDCOPY FORMATS TO THE GENERAL.
<br />AND NEW OBSTACLES INCLUDING. BUT NOT LIMITED TO, FL FCTRICAI.
<br />EACH AIR HANDLING SYSTEM WITH A MINIMUM OF ONE (1)
<br />INSTRUCTED BY MECHANICAL ENGINEER OF RECORD AND
<br />CONTRACTOR AND MECHANICAL ENGINEER OF RECORD UPON FINAL
<br />MECHANICAL GENERAL
<br />CONDUITS, FIRE PROTECTION PIPING, RAIN LEADERS, SANITARY DRAINS,
<br />MANUALLY -OPERABLE MEANS TO SHUT DOWN ALL SUPPLY. RETURN,
<br />1. THE MECHANICAL CONTRACTOR SHALL PROVIDE AN OPPOSEDELADE
<br />RETESTED IF REQUIRED BY MECHANICAL ENGINEER DU
<br />COMPLETION. .1
<br />STRUCTURAL MEMBERS, AND WATER PIPING, AS WELL AS THE MECHANICAL
<br />EXHAUST AND OUTSIDE AIR FANS IN AN EMERGENCY. MORE
<br />VOLUME DAMPER FOR EVERY RECTANGULAR BRANCH AND OUTLET
<br />RECORD. IF ANY DISCREPANCIES ARE IDENTIFIED, THE
<br />-- - - _ - - - -
<br />EOOIPIENTMANUFACTURERS' RECOMMENDED CLEARANCES- THE
<br />INFORMATION IS AVAILABLE IN CHAPTER 6 OF NFPA 80A
<br />AND AT EVERY RECTANGULAR TAKE -OFF FOR A DIFFUSER OR GRILLE.
<br />DUCTWORK SHALL BE UNCOVERED AND REPAIRS SHALL BE
<br />B. THE MECHANICAL CONTRACTOR SHWA CLEAN ALL COOLING AND HEATING' MECHANICAL DEMO PLAN
<br />MECHANICAL CONTRACTOR SHALL ALSO SHOW THE EXISTING CONDITIONS
<br />(ROUND OR OVAL BRANCHES. OUTLETS, AND TAKE -OFFS FOR
<br />MADE A MECHANICAL CONTRACTORS EXPENSE. THE
<br />COALS, CONDENSATE PANS, AND CONDENSATE DRAIN LINES PRIOR TO
<br />ON THE SHOP DRAWINGS WHERE THE D03TM0 CONDTONS ARE
<br />2.05 CONDENSATE DRAIN LINES
<br />DIFFUSE AND GRILLES $DAL BE PROVIDED WITH STANDARD
<br />ITHE
<br />MECHANICAL CONTRACTOR SMALL ONE MECHANICAL
<br />SUBSTANTIAL COMPLETION. THE MECHANICAL CONTRACTOR SHALL ALSO
<br />M4.1 MECHANICAL PROPOSED
<br />DIFFERENT FROM THOSE SHOWN ON THE CONSTRUCTION DOCUMENTS.
<br />VOLUME DAMPERS.) NOT ALL DAMPERS ARE SHOWN ON THE
<br />ENGINEER OF RECORD TWO (2) WEEKS NOTICE BEFORE
<br />REPLACE ALL FILTERS AND BELTS PRIOR TO SUBSTANTIAL COMPLETION PLAN
<br />CONSTRUCTION DOCUMENTS. HOWEVER. DAMPERS ARE REQUIRED
<br />TESTING THE DUCTWORK
<br />AND PROVIDE TWO (3) COMPLETE REPLACEMENT SETS OF FILTERS AND (2) - - - - --
<br />B. FURNISH SIX (6) COPIES OF SHOE' DRAWINGS OF E-0111PMINi. MATERIALS
<br />A REFER TO BASIC MATERIAL REQUIREMENTS ON THIS SHEET
<br />FOR EVERY BRANCH. OUTLET, AND TAKE -OFF. SOME DAMPERS MAY BE
<br />SETS OF BELTS FOR ALL MECHANICAL EQUIPMENT TO THE OWNER UPON M7.'1 - MECHANICAL SCHEDULES
<br />AND SYSTEM LAYOPI TO GENERAL CONTRACTOR AND MECHANICAL
<br />FOR CO. MATERIAL SELECTIONS
<br />REQUIRED AFTER TRANSITIONS.
<br />2.10 AIR DEVICES
<br />IINN COMPLETION.
<br />ENGINEER OF RECORD PRIOR TO PURCHASING ANY EQUIPMENT AND
<br />BEGINNING WORK.
<br />e. THE MECHANICAL CONTRACTOR SHALL PROVIDE A P-TRAP AT
<br />J. THE. MECHANICAL CONTRACTOR SHALL. ATTACH A BRIGHTLY -COLORED
<br />A THE MECHANICAL CONTRACTOR SHALL VERIFY THE LOCATIONS
<br />MECHANICAL SCHEDULES
<br />EACH HANDLERS CONDENSATE DRAIN LINE CONNECTION.
<br />STRIP OF PLASTIC TAPE TO EVERY VOLUME DAMPER, EXCEPT THOSE
<br />OF THE DIFFUSERS AND GRILLES AND SUBMIT A
<br />3.07 WARRANTY
<br />1.a RECORD DRAWINGS
<br />EACH CONDENSATE DRAIN LINE SHALL BE SLOPED DOWN A
<br />AT THE HEAD OF A DIFFUSER OR GRILLE THE STRIP SHALL SE OF
<br />REQUEST -FOR -INFORMATION IF THERE IS A CONFLICT
<br />i
<br />MA.1 MECHANICAL DETAILS
<br />MINIMUM OF ONE -EIGHTH ( INCH PER LINEAR FOOT
<br />SUFFICIENT LENGTH TO HANG A MINIMUM OF 12" BELOW THE BOTTOM
<br />BETWEEN THE ARCHITECTURAL AND MECHANICAL PORTIONS
<br />A THE MECHANICAL CONTRACTOR SHALL WARRANT ITS WORK TO BE FREE
<br />A AFTER COMPLETION OF ALL WORK THE MECHANICAL CONTRACTOR SHALL
<br />TOWARD THE ASSOCIATED POINT POINT OF DISCHARGE.
<br />OF THE ASSOCIATED DUCT.
<br />OF THE CONSTRUCTION DOCUMENTS. THE MECHANICAL
<br />FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE
<br />PROVIDE THE GENERAL CONTRACTOR WITH AS BUILT RECORD DRAWINGS.
<br />CONTRACTOR SHALL ALSO VERIFY THE TYPES OF CEILINGS IN
<br />YEAR FROM FINAL ACCEPTANCE OF ALL WORK.
<br />MECHANICAL CONTRACTOR SHALL L KEEP A RECORD OF THE LOCATIONS OF
<br />C. THE DIAMETER OF THE CONDENSATE DRAIN LINE SHALL BE
<br />THE SCOPE OF WORK PRIOR TO ORDERING DIFFUSERS AND
<br />ALL CONCEALED WORK AND UPON COMPLETION OF THE JOB, SHALL
<br />EQUAL TO OR GREATER THAN THE CONDENSATE DRAIN LINE
<br />K THE MECHANICAL CONTRACTOR SHALL CLEARLY AND PERMANENTLY
<br />GRILLES. FOR DIFFUSERS AND GRILLES LOCATED IN PLASTER
<br />B. THE MECHANICAL CONTRACTOR SMALL PROVIDE FIVE (5) BOUND COPIES
<br />SUPPLY AS -BUILT DRAWINGS SHOWING ANY DEVIATION FROM THE
<br />CONNECTION- TO AVOID EXCESSIVE DIPS IN AND TO PREVENT
<br />MARK EACH VOLUME DAMPERS OPEN AND CLOSED POSITIONS. THE
<br />OR GYPSUM CEILINGS, THE MECHANICAL CONTRACTOR SHALL
<br />OF ALL MECHANICAL CONTRACTOR WARRANTIES, MANUFACTURE. HS'
<br />ORIGINAL DRAWINGS. THESE DRAWINGS SHALL INDICATE DIMENSION OF
<br />ANY SHIFTING OF THE CONDENSATE DRAIN LINES, THE
<br />MECHANICAL CONTRACTOR SHALL PROVIDE A VOLUME DAMPER WITH
<br />PROVIDE METALAIRE MODEL TBPF / TINS MODEL TRM PLASTER
<br />WARRANTIES, PARTS LISTS, AND INSTALLATION AND MAINTENANCE
<br />AI
<br />SUMED UTILITYLINES FROM BUILDING WALLS.
<br />MECHANICAL CONTRACTOR SHALL PROVIDE SUPPORTS AT
<br />A T STANDOFF WITH A LOCKING QUADRANT THAT IS 24 GAUGES OR 2
<br />FRAMES. THE FRAMES MAY BE ALUMINUM N NON -FIRE -RATED
<br />MANUALS FOR ALL MECHANICAL EQUIPMEN I, AS WELL AS INSTRUCTIONS
<br />THE FOLLOWING INTERVALSTHREE (3) FEET FOR
<br />GAUGES HEAVIER.
<br />CEILINGS BUT MUST BE STEEL. IN FIRE -RATED CEILINGS. THE
<br />FOR OPERATING AND MAINTAINING ALL MECHANICAL EQUIPMENT 70 THE
<br />PART 2 - INSTALLATION
<br />CONDENSATE DRAIN LINES CONSTRUCTED OF PVC, SIX (6)
<br />MECHANICAL CONTRACTOR SHALL. COORDINATE THE FINISH OF
<br />OWNER UPON FINAL COMPLETION.
<br />FEET FOR CONDENSATE DRAIN LINES CONSTRUCTED OF
<br />L PROVIDE AND INSTALL92USKIN PRD19' POSITIVE PRESSURE RELIEF
<br />ALL DIFFUSERS AND GRILLES. EXPOSED DUCTWORK, GRAVITY
<br />2.01 EQUIPMENT
<br />COPPER AND TEN (10) FEET FOR CONDENSATE LINES
<br />DOORS IN SUPPLY DUCTWORK FOR ALL AIR HANDLER SYSTEMS WITH
<br />VENTILATORS, LOUVERS. AND WALL CAPS WITH THE
<br />CONSTRUCTED OF STEEL CONDENSATE DRAIN LINE
<br />VAV BOXES. SMOKE DAMPERS OR FIRE DAMPERS. PROVIDE AND
<br />(ARCHTECTIOWNER). ALL VISIBLE EXTERIOR COMPONENTS
<br />A ALL MECHANICAL EQUIPMENT SMALL BE INSTALLED AS REQUIRED BY THE
<br />SUPPORTS SHALL BE FIXED SOLIDLY IN PLACE.
<br />INSTALL"RUSKIN NRD-18 NEGATIVE PRESSURE RELIEF DOOR IN
<br />(SUCH AS EXPOSED DUCTWORK AND LOUVERS) SHALL BE
<br />MANUFACTURERS' INSTALLATION AND MAINTENANCE MANUALS. THOSE
<br />RE I URN DUCTWORK FOR ALL AIR HANDLER SYSTEMS THAT HAVE
<br />PROVIDED WITH A PAINT -GRIP FINISH.
<br />MANUALS WILL TYPICALLY PROVIDE MORE DETAIL THAN THE
<br />D. CONDENSATE DRAIN LINES SHALL L NOT BE ROUTED TO THE
<br />MOTORIZED RETURN AIR DAMPERS, SMOKE DAMPERS OR FIRE
<br />CONSTRUCTION DOCUMENTS- IF THERE IS A CONFLICT BETWEEN THE
<br />INSTALLATION AND MAINTENANCE MANUALS AND THE CONSTRUCTION
<br />SANITARY SEWER SYSTEM OR TO SCUPPERS.
<br />DAMPERS.
<br />2.11 CONTROLS
<br />DOCUMENTS, THEN THE MECHANICAL CONTRACTOR SHALL SUBMIT' A
<br />E THE MECHANICAL CONTRACTOR SHALL INSULATE EACH
<br />M. ALL DUCT SHALL MEET THE FOLLOWING CONSTRUCTION
<br />A THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL
<br />REQUEST -FOR -INFORMATION TO MECHANICAL ENGINEER OF RECORD.
<br />CONDENSATE DRAIN LINE WITH ONE-HAL F (12) INCH
<br />REQUIREMENTS'
<br />CONTROLS AND SUB CONTRACT TO THE ELECTRICAL
<br />ARMAFLEX WHEREVER THAT CONDENSATE DRAIN LINE IS
<br />CONTRACTOR ALL CONTROLS POWER AND TRANSFORMERS
<br />B. VIBRATION ISOLATION: THE MECHANICAL CONTRACTOR SHALL PROVIDE
<br />ROUTED WITHIN THE STRUCTURE OR THE CONDENSATE MAY
<br />SUPPLY DUCTWORK (UPSTREAM OF ANY VAV): 20 TWO POSITIVE STATIC
<br />NOT IDENTIFIED IN THE ELECTRICAL PORTION OF THE
<br />VIBRATION ISOLATION AS RECOMMENDED BY THE MANUFACTURER(S)
<br />OTHERWISE CAUSE DAMAGE
<br />PRESSURE AND VELOCITIES LESS THAN Z500 FPM.
<br />CONSTRUCTION DOCUMENTS.
<br />AND/OR REOUIRED BY MECHANICAL ENGINEER OF RECORD TO ENSURE
<br />QUIET OPERATION OF THE MECHANICAL EQUIPMENT. NO UNDUE VIBRATION
<br />F. THE MECHANICAL CONTRACTOR SHALL CLEARLY LABEL ALL
<br />SUPPLY DUCTWORK (DOWNSTREAM OF ANY VAV): 1.0IWG POSITIVE
<br />B. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />OR SOUND SHALL BE TRANSMITTED TO THE STRUCTURE OR ANY OCCUPIED
<br />CONDENSATE DRAIN LINES TO INDICATE CONTENT AND
<br />STATIC PRESSURE AND VELOCITIES LESS THAN 1OW FPM.
<br />DETERMINING WHAT IS REQUIRED TO INCORPORATE NEW
<br />SPACES WITHIN THE STRUCTURE.
<br />DIRECTION OF FLOW.
<br />MECHANICAL EQUIPMENT AND CONTROLS INl U THE EXISTING
<br />C. FILTERS: THE MECHANICAL CONTRACTOR SHALL PROVIDE FILTER RACKS
<br />• ALL OTHER RETURN DUCTWORK: 1.0 NVG NEGATIVE STATIC PRESSURE
<br />AND VELOCITIES LESS THAN 1600 RPM.
<br />CONTROL SYSTEM(S) AND INCLUDING ALL COSTS ASSOCIATED
<br />WITH INCORPORATING NEW MECHANICAL EQUIPMENT AND
<br />BASIC DUCTWORK MATERIAL REOUAENENTSI
<br />FOR THE MECHANICAL EQUIPMENT AS REQUIRED. THE FILTER HACKS
<br />2.07 ROOF MOUNTED EQUIPMENT
<br />CONTROLS INTO THE EXISTING CONTROL SYSTEM(S) IN HISMER
<br />SHALL BE INSTALLED SUCH THAT SUFFICIENT CLEARANCES ARE PROVIDED
<br />ALL EXHAUST AND OUTSIDE AIR DUCTWORK: 1.0IWO POSITIVE OR
<br />BID. THE CONTROLS CONTRACTOR SMALL PROVIDE A
<br />SUPPLY/RETURN:
<br />FOR MAINTENANCE AND SHALL BE SEALED AIRTIGHT. THE MECHANICAL
<br />A. THE MECHANICAL CONTRACTOR SMALL SET EACH ITEM OF
<br />NEGATIVE STATIC PRESSURE AND VELOCITIES LESS THAN 1600 RPM.
<br />COMPLETE DESCRIPTION OF THE ENTIRE CONTROL SYSTEM,
<br />CONTRACTOR SHALL PROVIDE A TOTAL OF THREE (3) COMPLETE TE SETS OF
<br />ROOF -MOUNTED MECHANICAL EQUIPMENT ON A FACTORY
<br />INCLUDING SCHEMATIC DRAWINGS.
<br />❑ SHEET METAL
<br />FILTERS FOR ALL MECHANICAL EQUIPMENT N THE SIZE AND ARRANGEMENT
<br />CURB, CURB ADAPTER, OR ON A MINIMUM OF FOUR (4) PHP
<br />ALL TRANSFER OUCTWORK. 0.5TING POSITIVE OR NEGATIVE STATIC
<br />®DUCTBOARD
<br />RECOMMENDED BY THE MANUFACTURER THE FILTERS SHALL PROVIDE
<br />SYSTEMSOESIGN MODEL RTU-20 EQUIPMENT SUPPORTS AT
<br />PRESSURE AND VELOCITIES LESS THAN 5W FPM.
<br />C THE MECHANICAL CONTRACTOR SHALL PROVIDE A HONEYWELL.
<br />ASHRAE FILTRATION EFFICIENCY AS SHOWN ON THE CONSTRUCTION
<br />THE HEIGHT REQUIRED BY TABLE 1509.7 OF THE FLORIDA
<br />MODEL T350 PROGRAMMABLE THERMOSTAT WITH A REMOTE
<br />DOCUMENTS OR 30% ASHRAE FILTRATION EFFICIENCY (MERV 6) IF NO
<br />BLALOING CODE UNLESS, OTHERWISE NOTED ON THE
<br />ANY OTHER DUCTWORK: REFER TO SMACNA "RVAC DUCT CONSTRUCTION
<br />SENSOR AND A LOCKABLE COVER FOR EACH NEW AND
<br />FXHAUST/OUTSIDE AIR:
<br />HIGHER VALUE IS SPECIFIED.
<br />CONSTRUCTION DOCUMENTS_
<br />STANDARDS".
<br />EXISTING MR CONDITIONING SYSTEM. THE MECHANICAL
<br />® SHEET METAL
<br />D. THE MECHANICAL CONTRACTOR SHALL. PROVIDE ALL STARTERS,
<br />ALL RECTANGULAR METALLIC DUCTWORK SHALL BE SHOP
<br />CONTRACTOR SHALL ALSO PROVIDE ONE (1) PERSONAL
<br />DIGITAL ASSISTANT (PDA)AND HONEVWELLS THERMOSTAT
<br />❑ DUCTBOARD
<br />CONTACTORS, RELAYS, CONTROLS, AND ACCESSORIES NECESSARY TO
<br />FABRICATED OF GALVANIZED STEEL SHFFTS. FOLLOWING ARE THE
<br />INTERFACE MODULE AND PROGRAMMING SOFTWARE THE
<br />PROVIDE A COMPLETE AND WORIONG POWER AND CONTROL SYSTEM FOR
<br />SMACNA RECOMMENDATIONS FOR GAUGES AND SEAMS. CONFORM
<br />MECHANICAL CONTRACTOR SHALL COORDINATE THE INITIAL
<br />THE MECHANICAL EQUIPMENT WITHIN THE SCOPE OF WORK. THE
<br />TO THE RECOMMENDATIONS OF SMACNA AS TO SEAMS. JOINTS,
<br />OCCUP R
<br />OCCUPANCY SCHEDIAE(S) AND PROGRAMMBM WITH THE
<br />NOTES:
<br />ELECTRICAL. CONTRACTOR WILL PROVIDE ALL DISCONNECT SWITCHES,
<br />CROSS BREAKS AND TRANSITIONS, ETC.
<br />ANDYPROVIDE TRAINING
<br />P . ALL
<br />REQUIRED. ALL
<br />OWNERPROGR
<br />® UTILIZE MATERIALS ABOVE UNLESS NOTED OTHERWISE ON PLANS
<br />CONDOR, AND WIRING FOR THE MECHANICAL EQUIPMENT WITHIN THE
<br />SCOPE OF WORK. ALLL ELECTRICAL WORK SHALL COMPLY WITH THE
<br />SHALL COMPLETED USING WELL'S
<br />THERMOSTAT PROGRAMMING SOFTWARE.
<br />® CONTRACTOR TO PROVIDE DEDUCTIVE COST ALTERNATE FOR USE OF
<br />REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. THE MECHANICAL.
<br />RECTANGULAR STEEL DUCT GAGE
<br />DUCTBOARD
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER OPERATION OF
<br />DUCT WITH FLATS' SLIP WITH STANpING 5' SLIP
<br />D. EACH SENSOR SHALL HE INSTALLED AT 4'6' ABOVE THE
<br />THE COMPLETE SYSTEM AND STALL ENSURE THAT WING DIAGRAMS ARE
<br />DIAMETER IN INCHES ON S SPACING GA ON 5 SPACING GA
<br />( ) ( )
<br />FINISHED FLOOR UNLESS OTHERWISE NOTED THE
<br />PROVIDED D I THE GENERAL CONTRACTOR NO WIRING OF ANY KIND SHALL
<br />I
<br />BE EXPOSED IN FINISHED AREAS.
<br />AL
<br />CONSTRUCTION DOCUMENTS. THE MECHANICAL CONTRACTOR
<br />SHALL COORDINATE THE EXACT LOCATION OF EACH SENSOR
<br />BASIC CD. MATERIAL REOUNRENENTS �
<br />0 - 12 26 26 B
<br />WITH THE OWNER AND SUBMIT THE PROPOSED LOCATION TO
<br />E- HOUSEKEEPING PADS: THE. GENERAL AND MECHANICAL. CONTRACTORS
<br />13 - 14 24 26 B
<br />MECHANICAL ENGINEER OF RECORD FOR APPROVAL. THE
<br />CONDENSATE DRAIN:
<br />SHALL PROVIDE A 4' MGM CONCRETE HOUSEKEEPING PAD UNDER ALL
<br />MECHANICAL EQUIPMENT, UNLESS OTHERWISE NOTED ON THE
<br />15 - 18 22 265
<br />19 - 20 20 26 C
<br />MECHANICAL CONTRACTOR SHALL PROVIDE COORDINATION OF
<br />ALL SENSOR FINISHES WITH ROOM FINISHES AT NO ADDITIONAL
<br />® SCHEDULE 40. PVC
<br />CONSTRUCTION DOCUMENTS. THE HOUSEKEEPING PAD SHALL. EXTEND P
<br />BEYOND THE
<br />21 - 26 18 26 C
<br />COST TO THE OWNER.
<br />❑ COPPER, TYPE L. WIARMAFLEX INSULATION
<br />MECAMCAL EQUIPMENT ON ALL SIDES.
<br />27 - 28 16 26 C
<br />E ELECTRIC DUCT HEATERS: ELECTRIC DUCT HEATERS SHALL BE
<br />29 - 30 16 26 D
<br />E. ALL EXHAUST AND OUTSIDE AIR FANS SHALL INTERLOCKED
<br />WITH THE AIR HANDLER SERVING THEEASSOCIATED SPACE.
<br />NOTES:
<br />UNDERWRITERS` I ABOIA I DRIES LISTED, BEAR THE SILL OR MARK OF AN
<br />31 - 36 - 240
<br />®1JQ117'F MATERIALS ABOVE UNLESS NOTED OTHERWISE ON PLANS
<br />APPROVED TESTING AGENCY. AND BE EQUIPPED WITH AN APPROVED.
<br />37 - 42 - 24 E
<br />F. ALL 120-VOLT RESTROOM EXHAUST FANS WITH ELECTRICAL
<br />AUTOMATICALLY RESETTING OUTLET AIR TEMPERATURE LIMIT CONTROL
<br />43 - 60 - 22 G
<br />REQUIREMENTS OF UP TO SIX WATTS SKILL BE CONTROLLED
<br />THAT WILL LIMIT THE OUTLET AIR TEMPERATURE TO NOT MORE THAN 20mv
<br />BY AN OCCUPANCY SENSOR WITH A TIME DELAY. THE INITIAL
<br />THE MECHANICAL CONTRACTOR AND MANUFACTURER SMALL EQUIP THE
<br />STANDINGS' SLIP
<br />STANDING
<br />TIME DELAY SHALL BE SET AT TWENTY (20) MINUTES
<br />ELECTRIC ELEMENTS OF THE HEATER WITH FUSIBLE LINKS ORA MANUAL
<br />RESET TEMPERATURE CONTROL THAT WILL PREVENT THE OUTLET AIR
<br />SIZE
<br />G THE MECHANICAL CONTRACTOR SHM.I PROVIDE A THE CLOCK
<br />INSULATION MATERIAL REQUEEIbENTSI
<br />TEMPERATURE FROM EXCEEDING 25(PF. EACH ELECTRIC DUCT HEATER
<br />FOR ALL OUTDOOR AIR FANS THE MECHANICAL CONTRACTOR
<br />SHALL BE INTERLOCKED WITH THE ASSOCIATED MR HANDLER TO ENSURE
<br />B 1' x 26 GA
<br />SHALL COORDINATE THE INITIAL OCCUPANCY SCHEDULE(S)
<br />ON CONCEALED DUCTWORK.
<br />ELECTRIC DUCT HEATER SHUTDOWN IN THE EVENT OF AN AIR HANDLER FAN
<br />C 1'x 22 GA
<br />AND SETTINGS WITH THE OWNER AND PROVIDE TRAINING AS
<br />®FLEXIBLE FIBERGLASS
<br />FAILURE.
<br />D 1-1/6' x 22 GA
<br />REQUIRED.
<br />E 1-I18' x 18 GA
<br />❑ FIBROUS DUCTBOARD
<br />G 1-5/8' x 18 GA
<br />Os .Rae N: sea 1.s 1 .Da
<br />REFER TO SMAGNA TABLES FOR REINFORCEMENT FOR DUCT LENGTHS
<br />ON EXPOSED DUCTWORK-
<br />OTHER THAN FIVE (5) FEET.
<br />❑ FLEXIBLE FIBERGLASS
<br />G L� B A L
<br />ALL ROUND RIGID METAL DUCTWORK CAN BE PREFABRICATED OR SHOP
<br />FOLLOWING ARE THE SMACNA RECOMMENDATIONS FOR
<br />al FIBROUS DUCTBOARD S�NCu c-
<br />C
<br />GAUGES AND SEAMS. ELBOWS SHALL. HAVE CENTERLINE RADIUS OF 1-1/2
<br />TIMES DUCT DIAMETER. THE CONTRACTOR MAY PROVIDE EQUIVALENT
<br />INCFABRICATED.
<br />R-VALUE:
<br />ROUND OR RECTANGULAR DUCT AS CONDITIONS AND SPACE PERMIT.
<br />® IN UNCONDITIONED SPACE, R-8 M E P F ENGINEERING
<br />© ALL OTHER DUCTWORK, R-4.2 IN FOPGLOBAL-SANCHE2.COM
<br />CA4'': 6237
<br />NOTES: 816 MANATEE AVE. E, SUITE 16
<br />® UTILIZE MATERIALS ABOVE UNLESS NOTED OTHERWISE ON PLANS BRADENTON, FL 34208
<br />PHONE: 941-75B-2557
<br />1CG7 -ND E RGON CLVD..
<br />SUITE 103
<br />TAMPA, FL 33629
<br />PHONE: B13-281-0001
<br />C&K ARCHITECTS I INTERIORS
<br />- MW!ur -kft m design. tlicnt n iM
<br />AACOO16-
<br />4221 WEST BOY SCOUT RI VD., SUIIE 150
<br />TAMI'A, FL 33607-5743
<br />813.8B4.2000
<br />280 WEST CENTRAL AVE.
<br />WINTER HAVEN, FL 33880-2957
<br />863.577.2054
<br />s\� A. sF
<br />N o. 71454' i
<br />t,
<br />A 7 t
<br />*
<br />-A X 5/14/2021 j,*
<br />CO.. STATE OF ' Nv
<br />Fs � ORIDP+ Q;'
<br />S70NAL E�
<br />E'I'l,
<br />i
<br />9
<br />EE
<br />QJ/
<br />Ii O
<br />Z
<br />W
<br />44
<br />•.
<br />J
<br />d
<br />U 0
<br />Z 0
<br />2 pp
<br />U ao
<br />Lu
<br />m
<br />P
<br />MD
<br />BAI®Fm
<br />PERMIT
<br />FMOIBCTRWYBI
<br />21020
<br />DATE
<br />5.5.21
<br />Dullim IMMOH
<br />mo 1
<br />
|