Laserfiche WebLink
I I __I I -__ u. _jI! I_ i4In muLl ! III .I -I 1. I 11BI I'!. I I I _. I I I I ll. A II <br />MECHANICAL <br />SMCMATIONS <br />MECHAMCAL LEG END <br />RIGID DUCT - DOUBLE LINE <br />PART 1 - GENERAL <br />2.02 ACCESS PANELS, FIRE DAMPERS, AND FIRE/SMOKE DAMPERS <br />2-08 DUCTWORK CONSTRUCTION <br />ROUND STEEL DUCT GAGE <br />0.01 GENERAL SCOPE <br />A. THEGETIERAI. AND MECHANICAL CONTRACTORS SHALL PROVIDE <br />A. THE $MEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL <br />DUCT LONGITUDINAL <br />PART 3-EXECDRON RIGID DUCT- SINGLE LINE <br />A THIS PROJECT WILL REQUIRE INSTALLATION OF NEW HVAC SYSTEMS AS <br />ACCESS PANELS TO ALLOW ACCESS TO VOLUME DAMPERS ABOVE <br />ASSOCIATION'S'FlBROUS GLASS DUCT CONSTRUCTION STANDARDS' <br />DIAMETER SPIRAL SEAM SEAM <br />INDICATED. <br />PIASTER OR GYPSUM CEILINGS, TURNING VANES, FIRE DAMPERS, <br />AND 9HVAC DUCT CONSTRUCTION STANDARDS• SHALL BE <br />IN INCHES IN INCHES IN INCHES <br />3.01 INSTALLATION <br />FLEXIBLE OUCH -INSULATED, SINGLE LINE <br />FIRE/SMOKE DAMPERS, DUCT -MOUNTED SMOKE DETECTORS, AND <br />CONSIDERED PART OF THE SPECIFICATIONS FOR THIS PROJECT. ANY <br />1.01 GENERAL DOCUMENTS <br />WHERE. REQUIRED FOR THE MAINTENANCE OF ALL MECHANICAL <br />WORK THAT DOES NOT COMPLY WITH THESE STANDARDS MAY BE <br />3-8 28 28 <br />A OCOORDINATE WORK WITH OTHER TRADES AND EXISTING CONDITIONS \_/ FLEXIBLE DUCT - INSULATED <br />EQUIPMENT. ACCESS PANELS SHALL HAVE A FIRE RATING EQUAL TO <br />REJECTED AT ANY TIME DURING THE PROJECT. <br />9- 14 25 26 <br />PRIOR TO BEGINNING WORK. MECHANICAL CONTRACTOR SHALL PROVIDE <br />A INSTALLATION SHALL HE IN ACCORDANCE WITH THE FLORIDA BUILDING <br />THE PENETRATED ASSEMBLY, WITH A MINIMUM FIRE RATING OF ONE (1) <br />15 - 26 26 24 <br />ROOTING AND OFFSETS NECESSARY TO AVOID CONFLICT WITH <br />CODE TIM EDITION 2020 (EFFECTIVE 12I31202D), WHICH INCLUDES THE <br />HOUR, <br />B. REFER TO BASIC MATERIAL REQUIREMENTS ON THIS SHEET FOR <br />27 - 30 24 22 <br />STRUCTURE. FINISHES, AND WORK OF OTHER TRADES. ® SUPPLY AIR DUCT - SECTION <br />RORIDA BUILDING CODE, MECHANICAL., FLORIDA RUADING CODE, <br />DUCTWORKAND DUCT INSULATION MATERIAL SELECTIONS- <br />37-50 22 20 <br />ENERGY CONSERVATION, AS WELL AS FLORIDA FIRE PREVENTION CODE, <br />B. THE MECHANICAL CONTRACTOR SHALL ATTACH A DRIGHRY-COLORED <br />51 60 20 18 <br />RETURN <br />7TH EDITION 2020 (EFFECTIVE 12)31Y102% ALL EQUIPMENT SHALL BE UL <br />STRIP OF PLASTIC TAPE TO EVERY DUCT -MOUNTED ACCESS PANEL THE <br />C M I DU CT DIMENSIONS SHOWN ON THE CONSTRUCTION DOCUMENTS <br />61 - 84 18 16 <br />3.02 DISNFECTNG OF POTABLE WATER SYSTEM AIR DUCT -SECTION <br />LIST ED. <br />STRIP SHALL BE OF SUFFICIENT FENCE TO HANG A MINIMUM OF 12" <br />ARE INSIDE CLEAR DIMENSIONS. THE MECHANICAL CONTRACTOR <br />BELOW THE BOTTOM OF THE ASSOCIATED DUCT. <br />SHALL PROVIDE FLEXIBLE CONNECTIONS BETWEEN EACH ITEM OF <br />ROUND At UMINIAN DUCT GAGE <br />A. THE SYSTEM SHALL BE FILLED WITH A SOLUTION CONTAINING 50 PARTS 0 DUCT TRANSITION - SINGLE LINE <br />S. THE MECHANICAL. WORK SHALL INCLUDE FURNISHING ALL. LABOR <br />MECHANICAL EQUIPMENT AND ITS ASSOCIATED DUCT'(S). ALL ITEMS <br />DUCT LONGITUDINAL <br />PER MILLION OF AVAILABLE CHLORINE AND ALL ALLOWED TO STAND 24 <br />EQUIPMENT, MATERIALS AND SERVICE NECESSARY FOR AND <br />C. THE MECHANICAL CONTRACTOR SHALL PROVIDE A FIRE DAMPER AT <br />OF THE HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM <br />DIAMETER SPIRAL SEAM SEAM <br />HOURS BEFORE FLUSHING AND RETURNING TO SERVICE. DISINFECTION � DUCT TRANSITION <br />REASONABLY INCIDENTAL TO THE PROPER COMPLETION OF ALL <br />EVERY DUCT PENETRATION OF A FIRE -RATED ASSEMBLY AND A <br />INCLUDING, BUT NOT LIMITED TO, AIR HANDLERS, FANS, DUCTWORK, <br />IN INCHES IN INCHES IN INCHES <br />PROCEDURE AND RESULT SHALL BE SUBJECT TO THE APPROVAL OF THE <br />MECHANICAL WORK SHOWN ON THE. DRAWINGS AND AS SPECIFIED. ALL <br />FIRE/SMOKE DAMPER WITH A MINIMUM FIREISMOKE RATING OF TWO (2) <br />DIFFUSERS. AND GRILLES SHALL NOT BE SUPPORTED BY THE CEILING <br />LOCAL MECHANICAL INSPECTOR ELBOW WITH'AIRFOIL' TURNING VANES <br />16 <br />MATERIAL SHALL BE NEW. <br />HOURS AT EVERY DUCT PENETRATION OF A SMOKE ASSEMBLY OR <br />OR CEILING SUSPENSION SYSTEM, BUT INSTEAD SHALL BE <br />3 -14 .026 .032 <br />CHASE EACH FIREISMOKE DAMPER SHALL CLOSE AND THE <br />SUPPORTED BY THE BUILDING STRUCTURE. <br />15- 26 .032 .040 <br />3.03 TEST �y-� <br />C. EACH PROSPEC DVF MECHANICAL CONTRACTOR SHALL EVALUATE THE <br />ASSOCIATED AIR HANDLER SHALL SHUTDOWN IF EITHER OF THE AIR <br />27 - 36 .040 .050 <br />1 - I IVD MANUAL VOLUME DAMPER (VD) <br />SCOPE OF WORK THOROUGHLY PRIOR TO SUBMITTING A BID. <br />HANDLERSES ' OR THE SPACSMOKE DETECTORS ARE AC RVATED. <br />D. ALL ELBOWS SHALL HAVE A ONE AND ONE-HALF (1.5) CENTERLINE <br />37 - 50 .050 .063 <br />A. ALL MECHANICAL SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH THE 7a'NY�'+ <br />RADIUS -TO -WIDTH OR RADIUSTO-DEPTH RATIO OR SHALL BE <br />ZOO DUCT LEAKAGE PERFORMANCE <br />FLORIDA BUILDING CODE MECHANICAL. ALL TESTS SHALL BE APPROVED BY <br />D. SOME CONDUIT, PIPING, AND OTHER OBSTACLES MAY NEED TO BE <br />D_ THE MECHANICAL CONTRACTOR SHALL PROVIDE ADDITIONAL <br />CONSTRUCTED WITH SINGLE BLADE TURNING VANES. ANGULAR <br />THE LOCAL MECHANICAL INSPECTOR AND SHALL BE OBSERVED BY A <br />RELOCATED AND SUCH RELOCATION SHOULD BE INCLUDED IN EACH <br />DUCTWORK AND PIPING SUPPORTS WITHIN EIGHTEEN (18) INCHES OF <br />TAPERS SHALL BE LIMITED TO THIRTY (30) DEGREES FOR <br />A FOR AIR CONDITIONING SYSTEMS OF FIFTEEN (15) TONS OR <br />REPRESENTATIVE OF THE ARCHITECT. ® SUPPLY AIR DIFFUSER <br />PROSPECTIVE MECHANICAL CONTRACTOR'S BID- <br />BOTH SIDES OF ALL FIRE -RATED ASSEMBLIES. DUGTWORK AND PIPING <br />CONTRACTING TAPERS AND TWENTY (20) DEGREES FOR EXPANDING <br />GREATER CAPACITY, AN INDEPENDENT TEST AND BALANCE <br />SHALL NOT BE SUPPORTED BY FIRE -RATED WALLS, BUT INSTEAD SHALL <br />TAPERS. <br />CONTRACTOR SHALL PERFORM A DUCT LEAKAGE TEST IN <br />3.04 SYSTEM IDENTIFICATION RETURN AIR OR VENTILATION EXH. GRILLE <br />E. THIS ENGINEER 13 NOT RESPONSIBLE FOR MATERIALS. METHODS. <br />BE SUPPORTED BY THE BUILDING STRUCTURE <br />COMPLIANCE WITH SMACMA'S'HVAC AIR DUCT LEAKAGE TEST <br />INSTALLATION, AND CONSTRUCTION WHICH DEVIATE FROM THESE <br />CONSTRUCTION DOCUMENTS AND SPECIFICATIONS. <br />2.03 SMOKE DETECTORS <br />E. THE MAXIMUM LENGTH OF NEW FLEXIBLE DUCT SHALL BE 1014Y. <br />FLEXIBLE DUCT SHALL BE INSTALLED AND SUPPORTED SO AS TO <br />MANUAL" TO VERIFY THE FUNCTION OF THE DESIGN AND THE <br />WORKMANSHIP OF THE MECHANICAL CONTRACTOR. A DUCT <br />A THE MECHANICAL CONTRACTOR SHALL PROVIDE IDENTIFICATION TAGS <br />FOR ALA. NEW EQUIPMENT, PIPING AND VALVES IN THE BUILDING. TAGS ® EXHAUST AIR GRILLE OR CEILING <br />PREVENT THE USE Or EXCESS DUCT MATERIAL, PREVENT <br />LEAKAGE TEST USED TO CONFIRM DUCT LEAKAGE CLASS <br />SMALL BE METAL WITH ENGRAVED UNIT/TAG NUMBER. MOUNTED EXHAUST FAN <br />1.02 SUBMITTALS <br />A. INDIVIDUAL AIR HANDLING SYSTEMS WITH A DESIGN CAPACITY OF MORE <br />SMALL <br />DISLOCATION OR DAMAGE, AND PREVENT CONSTRICTION OF THE <br />DUCT BELOW THE RATED DUCT DIAMETER FLEXIBLE DUCT BENDS <br />SHALL BE CONDUCTED AT THE PRESSURE FOR WHICH THE <br />DUCT WAS DESIGNED AND CONSTRUCTED. <br />3.05 TESTING, ADJUSTING. BALANCING AND COMMISSIONING O O <br />A MATERW S OR PRODUCTS SPECIFIED HEREIN AND/OR INDICATED ON <br />THAN 2000 CFM AUTOMATICALLY SHUT DOWN BY MEANS OF AN <br />APPROVED SMOKE DETECTOR PLACED IN THE SUPPLY AIRFLOW AFTER <br />SHALL MAINTAIN A CENTERUME RADIUS OF NOT LESS THAN ONE AND <br />THERMOSTAT OR HUMIDISTAT - WALL MOUNTED <br />DRAWINGS BY TRADE NAME, MANUFACTURER'S NAME OR CATALOG <br />ANY AIR FILTERS AND BEFORE ANY BRANCH CONNECTIONS IN THE <br />ONE-HALF (1.5) DUCT DIAMETERS. SAGS SHALL NOT EXCEED <br />B. DUCT CONSTRUCTION AND SEALING SYSTEMS SHALL MEET THE <br />BE THE MECHANICAL CONTRACTOR SHALL ENSURE THAT THE MEC 4AMCAL DUCT SMOKE DETECTOR <br />NUMBERS SHALL BE INTERPRETED AS ESTABLISHING A STANDARD OF <br />SUPPLY DUCTWORK <br />ONE-HALF (LIES) INCH PER LINEAR FOOT OF FLEXIBLE DUCT. HANGERS, <br />REQUIREMENTS OF THE FLORIDA ENERGY CONSERVATION <br />SYSTEMS ARE TESTED AND BALANCED. <br />OUALI I Y AND DESIGN. SUBSTITUTIONS MAY BE ALLOWED IF THEY MEET <br />SADDLES, AND OTHER SUPPORTS SHALL HAVE A MINIMUM WIDTH OF <br />CODE AND SMACNAS "FIBROUS GLASS DUCT CONSTRUCTION <br />THE QUALITY STANDARDS AND DESIGN IN ITNUNLESS UNLESS OTHERWISE <br />S. MULTIPLE AIR HANDLING SYSTEMS SERVING THE SAME SPACE WITH A <br />ONE AND ONE-HALF (1.5) INCHES. THE MECHANICAL CONTRACTOR <br />STANDARDS' AND'HVAC DUCT CONSTRUCTION STANDARDS'. <br />C. THE MECHANICAL CONTRACTOR SHALL PERFORM ALL TESTING. �-U - 3/4-UNDERCUT <br />NOTED. <br />COMBINED DESIGN CAPACITY OF MORE THAN 2000 GEM SHALL <br />SHALL PROVIDE SUPPORT FOR NEW AND MODIFIED EXISTING FLEXIBLE <br />IF THERE IS A CONFECT AMONG THE STANDARDS, THEN THE <br />ADJUSTING, BALANCING, AND DATA RECORDING NECESSARY TO <br />AUTOMATICALLY SHUT DOWN BY MEANS OF AN APPROVED SMOKE <br />DUCTWORK IN'I HE SCOPE OF WORK WITH A MAXIMUM SPACING OF <br />MORE STRINGENT STANDARD SHALL BE ENFORCED. <br />ESTABLISH THE CAPACITY AND QUALITY OF THE SYSTEMS AND CONFIRM <br />-G-� 16X16 DOOR GRILLE <br />e. PRIOR TO STARTING THE PROTECT, THE MECHANICAL CONTRACTOR <br />SHALL STUDY THE COMPLETE SE Of CONSTRUCTION DOCUMENTS AND <br />DETECTOR PLACED IN THE SUPPLY AIRFLOW AFTER ANY AIR DETERS <br />AND BEFORE ANY BRAVED CONNECTIONS IN THE SUPPLY DUCTWORK, <br />F-W. UNLESS OTHERWISE NOTED ON THE CONSTRUCTION <br />DOCUMENTS OR AUTHORIZED BY MECHANICAL ENGINEER OF RECORD. <br />C EA THE MECHANICAL CONTRACTOR SHALL SEAL ALL TRANSVERSE <br />THE SATISFACTORY COMPLETION OF ALL ASPECTS OF THE SCOPE OF <br />WORK THIS WILL INCLUDE ALL SYSTEMS WITHIN THE SCOPE OF WORK <br />COORDINATE WITH THE MANUFACTURER(S) AS REQUIRED TO PROVIDE <br />AS WELL AS AN APPROVED SMOKE DETECTORPLACED IN THE RETURN <br />JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL <br />ANYTIME FLOWS OR CALCULATIONS ARE SHOWN ON PLANS, DETAILS OR SPIN -IN FITTING WITH VOLUME DAMPER <br />EQUIPMENT SUBMITTALS TO SUBMIT TO IRIS ENGINEER FOR REVIEW <br />AIRFLOW AFTER ANY BRANCH CONNECTIONSTIONSIN THE REl'URN <br />F. SURFACES UPON WHICH CLOSURE OR SEALING PRODUCTS ARE TO BE <br />PENETRATIONS TO A MAXIMUM ALLOWABLE DUCT LEAKAGE <br />SCHEDULES, TEST 8 BALANCE IS REOlIREO. <br />AND APPROVAL. THE EQUIPMENT SUBMITTALS SHALL INCLUDE <br />DUCTWORK AND BEFORE ANY EXHAUST OR OUTSIDE AIR <br />APPLIED SHALT- BE CLEAN AND DRY IN ACCORDANCE WITH THE <br />CLASS OF THREE (3) CFM PER 100 SQUARE FEET OF DUCT AREA <br />DIMENSIONS. WEIGHTS, SPECIFIED ACCESSORIES AND REQUIRED <br />CONNECTIONS. MORE INFORMATION IS AVAILABLE IN CHAPTER 4 OF <br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. ALL DUCTWORK <br />(1.5%) FOR ROUND DUCT AND SIX (6) CFM PER 100 SQUARE <br />rBODI BACKDRAFT DAMPER <br />CLEARANCES. AS WELL AS FAN CURVES. SOUND LEVELS, CONSTRUCTION <br />NFPA IBA <br />SHALL BE SEALED WITH A NON -HARDENING, NON -MIGRATING MASTIC <br />FEET OF DUCT AREA (3%) FOR ALL OTHER DUCT TYPES. <br />O. THE MECHANCAL CONTRACTOR SHALL ENSURE THAT THE BUILDING IS <br />DETAILS, WARRANTY INFORMATION, AND ALL OTHER RELEVANT DATA <br />OR LIQUID ELASTIC SEALANT AS REQUIRED TO MEET THE FLORIDA <br />UNLESS OTHERWISE NOTED ON THE CONSTRUCTION <br />UNDER POSITIVE PRESSURE AT THE CONCLUSION OF THE TEST AND <br />ENERGY CONSERVATION CODE. THE MECHANICAL CONTRACTOR <br />DOCUMENTS OR AUTHORIZED BY MECHANICAL ENGINEER OF <br />BALANCE PROCESS. IF THE BUILDING IS NOT UNDER POSITIVE PRESSURE MD MOTORIZED DAMPER <br />C. IF ALTERNATES TO THE BASIS OF DESIGN ARE SUBMITTED, THE <br />C. THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS/HER BID ALL <br />SMALL PROVIDE HOT -DIPPED GALVANIZED STEEL FASTENERS, <br />RECORD. TRANSVERSE. JOINTS ARE CONNECTIONS OF TWO <br />AT THE CONCLUSION OF THE TEST AND BALANCE PROCESS, THEN THE <br />MECHANICAL CONTRACTOR SHALL PROVIDE A CLEAR, DETAILED <br />H <br />COSTS ASSOCIATES W FURNISHING, T AND WIRING ALL <br />ANCHORS, RODS. STRAPS. TRIM, AND ANGLES FOR INTERIOR <br />DUCT OR FITTING ELEMENTS ORIENTED PERPENDICULAR TO <br />TEST AND BALANCE AND MECHANICAL CONTRACTORS SHALL IMMEDIATELY <br />SUMMARY IN THE SUBMITTALS OF THE DIFFERENCES BETWEEN THE <br />SMOKE DETECTORS. THIS WILL INCLUDE,, B NOT <br />BUT NOT NECESSARILY BE <br />DUCTWORK SUPPORTS. INTERIOR DUCTWORK SUPPORT SPACING <br />THE DIRECTION OF THE AIRFLOW. LONGITUDINAL SEAMS ARE <br />AND WITHOUT DELAY NOTIFY THE ARCHITECT AND MECHANICAL ENGINEER XX FD-FIRE DAMPER, SD=SMOKE DAMPER <br />SUBMITTED EQUIPMENT AND THE BASIS OF DESIGN. MECHANICAL <br />LIMITED TO, MAKING DUCTWORK MODIFICATIONS AS REQUIRED BY THE <br />SHALL NOT EXCEED V-W. <br />JOINTS ORIENTED IN THE DIRECTION OF THE AIRFLOW. DUCT <br />OF RECORD. FSD = FIREISMOKE DAMPER <br />ENGINEER OF RECORD MAY ACCEPT OR REJECT THE ALTERNATES. <br />MANUFACTURER'S INSTRUCTIONS. THE GENERAL OR MECHANICAL <br />WALL PENETRATIONS ARE OPENINGS MADE BY SCREWS, <br />TO MATCH ASSEMBLY <br />CONTRACTOR SMALL SUB -CONTRACT THE PURCHASE AND WIRING OF <br />G ALL DUCTWORK INSULATION, FITTINGS, COVERS, AND FINISHES SHALL <br />NONSAELF-SEUNG FASTENERS, PIPES. TUBING. RODS, AND <br />E. THE MECHANICAL CONTRACTOR SHALL, UPON COMPLETION OF ALL PENETRATION RATING (1-HR, 2-HR. ETC.): <br />1.03 SHOP DRAWINGS <br />ALL SMOKE DETECTORS TO THE ELECTRICAL CONTRACTOR TO ENSURE <br />HAVE, A MAXIMUM FLAME SPREAD RATING OF 25. A MAXIMUM SMOKE <br />WIRE ROUND AND FLAT -OVAL SPIRAL LOCK SEAMS NEED NOT <br />NECESSARY TESTING AND BALANCING AND AT LEAST ONE (1) WEEK PRIOR PROVIDE ACCESS PANEL FOR ACCESS <br />THE SMOKE DETECTORS' COMPATIBILITY WITH THE FIRE ALARM <br />DEVELOPMENT RATING OF 50, AND SHALL BE IN COMPUANCE WITH <br />BE SFAI FD PRIOR TO ASSEMBLY BUT SMALL RE COATED AFTER <br />TO SUBSTANTIAL COMPLETION, SUBMIT THREE (3) BOUND COPIES OF THE <br />A. PRIOR TO STARTING THE PROJECT, THE MECHANICAL CONTRACTOR SHALL <br />SYSTEM. <br />NFPA 90A PROVIDE MINIMUM OF W" FIBERGLASS WITH FOIL/SCRIM <br />ASSEMBLY TO REDUCE LEAKAGE ALL OTHER CONNECTIONS <br />TEST AND BALANCE AND COMMISSIONING REPORTS TO THE GENERAL Hb CONNECTION - NEW TO EXISTING WORK. <br />STUDY THE COMPLETE SET OF CONSTRUCTION DOCUMENTS AND <br />VAPOR BARRIER ON THE BACK PAN OF ALL NEW AIR DEVICES. <br />ARE CONSIDERED TRANSVERSE JOINTS INCLUDING, BUT NOT <br />CONTRACTOR AND MECHANICAL ENGINEER OF RECORD. <br />COORDINATE WITH THE OTHER TRADES AS REQUIRED TO PROVIDE SHOP <br />U. THE CONTRACTOR -PROVIDED INSTRUCTIONS TO THE OWNER FOR <br />UNITED TO. SPINdNS, TAPS OR OTHER BRANCH CONNEC710NS, <br />DRAWINGS TO SUBMIT TO MECHANICAL ENGINEER OF RECORD FOR <br />OPERATING AND MAINTAINING ALL MECHANIST EQUIPMENT SNARL <br />H- ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10.0' FROM ANY <br />ACCESS DOOR FRAMES, AND DUCT CONNECTIONS TO <br />F. THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HISMER BID THE COST NEW LINE TYPE <br />APPROVAL. TI1E SHOP DRAWINGS MAY BE SUBMITTED AS HAND -DRAWN <br />INCLUDE TESTING ALL AUTOMATIC SHUTDOWN DEVICES AT LEAST ONCE <br />EXHAUST DO RET OR VENT PIPE (UNLESS THE VENT PIPE IS AT LEAST <br />EQUIPMENT. MORE INFORMATION 13 AVAILABLE IN CHAPTER 35 <br />OF ANY SHEAVE CH AGES REQUIRED FOR REBALANCING THE SYSTEM. <br />NOTES UPON A COPY OF THE CONSTRUCTION DOCUMENTS. THE <br />PER YEAR SPECIAL INSTRUCTIONS SHALL BE GIVEN WITH REGARD TO <br />TWO (2) FEET ABOVE THE OUTSIDE AIR IN TAKE). THE MECHANICAL <br />OF ASHRAE'S "FUNDAMENTAL$ HANDBOOK". <br />- - - - EXISTING LINE TYPE <br />CONSTRUCTION DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND <br />ENSURING THAT SMOKE SENSING DEVICES ARE PROPERLY CLEANED <br />CONTRACTOR SHALL PROVIDE SCREENS ON ALL OUTSIDE AIR INTAKES <br />3.06 SUBSTANTIAL AND FINAL COMPLETION <br />INTENDED BOLDLY TO CLARIFY THE SCOPE OF WORK AND INDICATE THE <br />AND CALIBRATED IN ACCORDANCE WITH THE MANUFACTURER'S <br />AND EXHAUST OUTLETS AT NO LESS THAN 1/4" BY 114 AND NO <br />D. ALL DUCTWORK SHALL BE INSPECTED BY MECHANICAL <br />GENERAL ARRANGEMENT OF SYSTEMS. THE CONSTRUCTION DOCUMENTS <br />REQUIREMENTS. MORE INFORMATION IS AVAILABLE IN CHAPTER 4 OF <br />GREATER THAN 1? BY 1/2". THE MECHANICAL CONTRACTOR SHALL <br />ENGINEER OF RECORD PRIOR TO BEING COVERED OR <br />A THE MECHANICAL CONTRACTOR SHALL MAINTAIN A SET OF <br />ARE NOT INTENDED TO ALERT THE MECHANICAL CONTRACTOR OF ALL <br />NFPA 90k <br />PROVIDE MOTORIZED DAMPERS IN ALL OUTSIDE AIR DUCTS. EACH <br />INSULATED. . TOWNER AND MECHANICAL ENGINEER OF <br />CONTINUOUSLY UPDATED, REPRODUCIBLE AS -BUILT DRAWINGS DURING <br />OBSTACLES. THE SHOP DRAWINGS SHALL SHOW THE COORDINATION OF <br />MOTORIZED DAMPER SHALL BE CONTROLLED TO OPEN IN OCCUPIED <br />RECORD SHALL BE PRESENT DURING ALL DUCT LEAKAGE <br />CONSTRUCTION AND PROVIDE A COMPLETE SET OF THOSE DRAWINGS IN MECHAMAL SHEET NIX <br />DUCTWORK AND MECHANICAL EOLAPMENT INSTALLATION WITH EXISTING <br />E THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL PROVIDE <br />MODE. <br />TESTING AND THE DUCTWORK SHALL BE TESTED AS <br />BOTH ELECTRONIC AND HARDCOPY FORMATS TO THE GENERAL. <br />AND NEW OBSTACLES INCLUDING. BUT NOT LIMITED TO, FL FCTRICAI. <br />EACH AIR HANDLING SYSTEM WITH A MINIMUM OF ONE (1) <br />INSTRUCTED BY MECHANICAL ENGINEER OF RECORD AND <br />CONTRACTOR AND MECHANICAL ENGINEER OF RECORD UPON FINAL <br />MECHANICAL GENERAL <br />CONDUITS, FIRE PROTECTION PIPING, RAIN LEADERS, SANITARY DRAINS, <br />MANUALLY -OPERABLE MEANS TO SHUT DOWN ALL SUPPLY. RETURN, <br />1. THE MECHANICAL CONTRACTOR SHALL PROVIDE AN OPPOSEDELADE <br />RETESTED IF REQUIRED BY MECHANICAL ENGINEER DU <br />COMPLETION. .1 <br />STRUCTURAL MEMBERS, AND WATER PIPING, AS WELL AS THE MECHANICAL <br />EXHAUST AND OUTSIDE AIR FANS IN AN EMERGENCY. MORE <br />VOLUME DAMPER FOR EVERY RECTANGULAR BRANCH AND OUTLET <br />RECORD. IF ANY DISCREPANCIES ARE IDENTIFIED, THE <br />-- - - _ - - - - <br />EOOIPIENTMANUFACTURERS' RECOMMENDED CLEARANCES- THE <br />INFORMATION IS AVAILABLE IN CHAPTER 6 OF NFPA 80A <br />AND AT EVERY RECTANGULAR TAKE -OFF FOR A DIFFUSER OR GRILLE. <br />DUCTWORK SHALL BE UNCOVERED AND REPAIRS SHALL BE <br />B. THE MECHANICAL CONTRACTOR SHWA CLEAN ALL COOLING AND HEATING' MECHANICAL DEMO PLAN <br />MECHANICAL CONTRACTOR SHALL ALSO SHOW THE EXISTING CONDITIONS <br />(ROUND OR OVAL BRANCHES. OUTLETS, AND TAKE -OFFS FOR <br />MADE A MECHANICAL CONTRACTORS EXPENSE. THE <br />COALS, CONDENSATE PANS, AND CONDENSATE DRAIN LINES PRIOR TO <br />ON THE SHOP DRAWINGS WHERE THE D03TM0 CONDTONS ARE <br />2.05 CONDENSATE DRAIN LINES <br />DIFFUSE AND GRILLES $DAL BE PROVIDED WITH STANDARD <br />ITHE <br />MECHANICAL CONTRACTOR SMALL ONE MECHANICAL <br />SUBSTANTIAL COMPLETION. THE MECHANICAL CONTRACTOR SHALL ALSO <br />M4.1 MECHANICAL PROPOSED <br />DIFFERENT FROM THOSE SHOWN ON THE CONSTRUCTION DOCUMENTS. <br />VOLUME DAMPERS.) NOT ALL DAMPERS ARE SHOWN ON THE <br />ENGINEER OF RECORD TWO (2) WEEKS NOTICE BEFORE <br />REPLACE ALL FILTERS AND BELTS PRIOR TO SUBSTANTIAL COMPLETION PLAN <br />CONSTRUCTION DOCUMENTS. HOWEVER. DAMPERS ARE REQUIRED <br />TESTING THE DUCTWORK <br />AND PROVIDE TWO (3) COMPLETE REPLACEMENT SETS OF FILTERS AND (2) - - - - -- <br />B. FURNISH SIX (6) COPIES OF SHOE' DRAWINGS OF E-0111PMINi. MATERIALS <br />A REFER TO BASIC MATERIAL REQUIREMENTS ON THIS SHEET <br />FOR EVERY BRANCH. OUTLET, AND TAKE -OFF. SOME DAMPERS MAY BE <br />SETS OF BELTS FOR ALL MECHANICAL EQUIPMENT TO THE OWNER UPON M7.'1 - MECHANICAL SCHEDULES <br />AND SYSTEM LAYOPI TO GENERAL CONTRACTOR AND MECHANICAL <br />FOR CO. MATERIAL SELECTIONS <br />REQUIRED AFTER TRANSITIONS. <br />2.10 AIR DEVICES <br />IINN COMPLETION. <br />ENGINEER OF RECORD PRIOR TO PURCHASING ANY EQUIPMENT AND <br />BEGINNING WORK. <br />e. THE MECHANICAL CONTRACTOR SHALL PROVIDE A P-TRAP AT <br />J. THE. MECHANICAL CONTRACTOR SHALL. ATTACH A BRIGHTLY -COLORED <br />A THE MECHANICAL CONTRACTOR SHALL VERIFY THE LOCATIONS <br />MECHANICAL SCHEDULES <br />EACH HANDLERS CONDENSATE DRAIN LINE CONNECTION. <br />STRIP OF PLASTIC TAPE TO EVERY VOLUME DAMPER, EXCEPT THOSE <br />OF THE DIFFUSERS AND GRILLES AND SUBMIT A <br />3.07 WARRANTY <br />1.a RECORD DRAWINGS <br />EACH CONDENSATE DRAIN LINE SHALL BE SLOPED DOWN A <br />AT THE HEAD OF A DIFFUSER OR GRILLE THE STRIP SHALL SE OF <br />REQUEST -FOR -INFORMATION IF THERE IS A CONFLICT <br />i <br />MA.1 MECHANICAL DETAILS <br />MINIMUM OF ONE -EIGHTH ( INCH PER LINEAR FOOT <br />SUFFICIENT LENGTH TO HANG A MINIMUM OF 12" BELOW THE BOTTOM <br />BETWEEN THE ARCHITECTURAL AND MECHANICAL PORTIONS <br />A THE MECHANICAL CONTRACTOR SHALL WARRANT ITS WORK TO BE FREE <br />A AFTER COMPLETION OF ALL WORK THE MECHANICAL CONTRACTOR SHALL <br />TOWARD THE ASSOCIATED POINT POINT OF DISCHARGE. <br />OF THE ASSOCIATED DUCT. <br />OF THE CONSTRUCTION DOCUMENTS. THE MECHANICAL <br />FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE <br />PROVIDE THE GENERAL CONTRACTOR WITH AS BUILT RECORD DRAWINGS. <br />CONTRACTOR SHALL ALSO VERIFY THE TYPES OF CEILINGS IN <br />YEAR FROM FINAL ACCEPTANCE OF ALL WORK. <br />MECHANICAL CONTRACTOR SHALL L KEEP A RECORD OF THE LOCATIONS OF <br />C. THE DIAMETER OF THE CONDENSATE DRAIN LINE SHALL BE <br />THE SCOPE OF WORK PRIOR TO ORDERING DIFFUSERS AND <br />ALL CONCEALED WORK AND UPON COMPLETION OF THE JOB, SHALL <br />EQUAL TO OR GREATER THAN THE CONDENSATE DRAIN LINE <br />K THE MECHANICAL CONTRACTOR SHALL CLEARLY AND PERMANENTLY <br />GRILLES. FOR DIFFUSERS AND GRILLES LOCATED IN PLASTER <br />B. THE MECHANICAL CONTRACTOR SMALL PROVIDE FIVE (5) BOUND COPIES <br />SUPPLY AS -BUILT DRAWINGS SHOWING ANY DEVIATION FROM THE <br />CONNECTION- TO AVOID EXCESSIVE DIPS IN AND TO PREVENT <br />MARK EACH VOLUME DAMPERS OPEN AND CLOSED POSITIONS. THE <br />OR GYPSUM CEILINGS, THE MECHANICAL CONTRACTOR SHALL <br />OF ALL MECHANICAL CONTRACTOR WARRANTIES, MANUFACTURE. HS' <br />ORIGINAL DRAWINGS. THESE DRAWINGS SHALL INDICATE DIMENSION OF <br />ANY SHIFTING OF THE CONDENSATE DRAIN LINES, THE <br />MECHANICAL CONTRACTOR SHALL PROVIDE A VOLUME DAMPER WITH <br />PROVIDE METALAIRE MODEL TBPF / TINS MODEL TRM PLASTER <br />WARRANTIES, PARTS LISTS, AND INSTALLATION AND MAINTENANCE <br />AI <br />SUMED UTILITYLINES FROM BUILDING WALLS. <br />MECHANICAL CONTRACTOR SHALL PROVIDE SUPPORTS AT <br />A T STANDOFF WITH A LOCKING QUADRANT THAT IS 24 GAUGES OR 2 <br />FRAMES. THE FRAMES MAY BE ALUMINUM N NON -FIRE -RATED <br />MANUALS FOR ALL MECHANICAL EQUIPMEN I, AS WELL AS INSTRUCTIONS <br />THE FOLLOWING INTERVALSTHREE (3) FEET FOR <br />GAUGES HEAVIER. <br />CEILINGS BUT MUST BE STEEL. IN FIRE -RATED CEILINGS. THE <br />FOR OPERATING AND MAINTAINING ALL MECHANICAL EQUIPMENT 70 THE <br />PART 2 - INSTALLATION <br />CONDENSATE DRAIN LINES CONSTRUCTED OF PVC, SIX (6) <br />MECHANICAL CONTRACTOR SHALL. COORDINATE THE FINISH OF <br />OWNER UPON FINAL COMPLETION. <br />FEET FOR CONDENSATE DRAIN LINES CONSTRUCTED OF <br />L PROVIDE AND INSTALL92USKIN PRD19' POSITIVE PRESSURE RELIEF <br />ALL DIFFUSERS AND GRILLES. EXPOSED DUCTWORK, GRAVITY <br />2.01 EQUIPMENT <br />COPPER AND TEN (10) FEET FOR CONDENSATE LINES <br />DOORS IN SUPPLY DUCTWORK FOR ALL AIR HANDLER SYSTEMS WITH <br />VENTILATORS, LOUVERS. AND WALL CAPS WITH THE <br />CONSTRUCTED OF STEEL CONDENSATE DRAIN LINE <br />VAV BOXES. SMOKE DAMPERS OR FIRE DAMPERS. PROVIDE AND <br />(ARCHTECTIOWNER). ALL VISIBLE EXTERIOR COMPONENTS <br />A ALL MECHANICAL EQUIPMENT SMALL BE INSTALLED AS REQUIRED BY THE <br />SUPPORTS SHALL BE FIXED SOLIDLY IN PLACE. <br />INSTALL"RUSKIN NRD-18 NEGATIVE PRESSURE RELIEF DOOR IN <br />(SUCH AS EXPOSED DUCTWORK AND LOUVERS) SHALL BE <br />MANUFACTURERS' INSTALLATION AND MAINTENANCE MANUALS. THOSE <br />RE I URN DUCTWORK FOR ALL AIR HANDLER SYSTEMS THAT HAVE <br />PROVIDED WITH A PAINT -GRIP FINISH. <br />MANUALS WILL TYPICALLY PROVIDE MORE DETAIL THAN THE <br />D. CONDENSATE DRAIN LINES SHALL L NOT BE ROUTED TO THE <br />MOTORIZED RETURN AIR DAMPERS, SMOKE DAMPERS OR FIRE <br />CONSTRUCTION DOCUMENTS- IF THERE IS A CONFLICT BETWEEN THE <br />INSTALLATION AND MAINTENANCE MANUALS AND THE CONSTRUCTION <br />SANITARY SEWER SYSTEM OR TO SCUPPERS. <br />DAMPERS. <br />2.11 CONTROLS <br />DOCUMENTS, THEN THE MECHANICAL CONTRACTOR SHALL SUBMIT' A <br />E THE MECHANICAL CONTRACTOR SHALL INSULATE EACH <br />M. ALL DUCT SHALL MEET THE FOLLOWING CONSTRUCTION <br />A THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL <br />REQUEST -FOR -INFORMATION TO MECHANICAL ENGINEER OF RECORD. <br />CONDENSATE DRAIN LINE WITH ONE-HAL F (12) INCH <br />REQUIREMENTS' <br />CONTROLS AND SUB CONTRACT TO THE ELECTRICAL <br />ARMAFLEX WHEREVER THAT CONDENSATE DRAIN LINE IS <br />CONTRACTOR ALL CONTROLS POWER AND TRANSFORMERS <br />B. VIBRATION ISOLATION: THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />ROUTED WITHIN THE STRUCTURE OR THE CONDENSATE MAY <br />SUPPLY DUCTWORK (UPSTREAM OF ANY VAV): 20 TWO POSITIVE STATIC <br />NOT IDENTIFIED IN THE ELECTRICAL PORTION OF THE <br />VIBRATION ISOLATION AS RECOMMENDED BY THE MANUFACTURER(S) <br />OTHERWISE CAUSE DAMAGE <br />PRESSURE AND VELOCITIES LESS THAN Z500 FPM. <br />CONSTRUCTION DOCUMENTS. <br />AND/OR REOUIRED BY MECHANICAL ENGINEER OF RECORD TO ENSURE <br />QUIET OPERATION OF THE MECHANICAL EQUIPMENT. NO UNDUE VIBRATION <br />F. THE MECHANICAL CONTRACTOR SHALL CLEARLY LABEL ALL <br />SUPPLY DUCTWORK (DOWNSTREAM OF ANY VAV): 1.0IWG POSITIVE <br />B. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />OR SOUND SHALL BE TRANSMITTED TO THE STRUCTURE OR ANY OCCUPIED <br />CONDENSATE DRAIN LINES TO INDICATE CONTENT AND <br />STATIC PRESSURE AND VELOCITIES LESS THAN 1OW FPM. <br />DETERMINING WHAT IS REQUIRED TO INCORPORATE NEW <br />SPACES WITHIN THE STRUCTURE. <br />DIRECTION OF FLOW. <br />MECHANICAL EQUIPMENT AND CONTROLS INl U THE EXISTING <br />C. FILTERS: THE MECHANICAL CONTRACTOR SHALL PROVIDE FILTER RACKS <br />• ALL OTHER RETURN DUCTWORK: 1.0 NVG NEGATIVE STATIC PRESSURE <br />AND VELOCITIES LESS THAN 1600 RPM. <br />CONTROL SYSTEM(S) AND INCLUDING ALL COSTS ASSOCIATED <br />WITH INCORPORATING NEW MECHANICAL EQUIPMENT AND <br />BASIC DUCTWORK MATERIAL REOUAENENTSI <br />FOR THE MECHANICAL EQUIPMENT AS REQUIRED. THE FILTER HACKS <br />2.07 ROOF MOUNTED EQUIPMENT <br />CONTROLS INTO THE EXISTING CONTROL SYSTEM(S) IN HISMER <br />SHALL BE INSTALLED SUCH THAT SUFFICIENT CLEARANCES ARE PROVIDED <br />ALL EXHAUST AND OUTSIDE AIR DUCTWORK: 1.0IWO POSITIVE OR <br />BID. THE CONTROLS CONTRACTOR SMALL PROVIDE A <br />SUPPLY/RETURN: <br />FOR MAINTENANCE AND SHALL BE SEALED AIRTIGHT. THE MECHANICAL <br />A. THE MECHANICAL CONTRACTOR SMALL SET EACH ITEM OF <br />NEGATIVE STATIC PRESSURE AND VELOCITIES LESS THAN 1600 RPM. <br />COMPLETE DESCRIPTION OF THE ENTIRE CONTROL SYSTEM, <br />CONTRACTOR SHALL PROVIDE A TOTAL OF THREE (3) COMPLETE TE SETS OF <br />ROOF -MOUNTED MECHANICAL EQUIPMENT ON A FACTORY <br />INCLUDING SCHEMATIC DRAWINGS. <br />❑ SHEET METAL <br />FILTERS FOR ALL MECHANICAL EQUIPMENT N THE SIZE AND ARRANGEMENT <br />CURB, CURB ADAPTER, OR ON A MINIMUM OF FOUR (4) PHP <br />ALL TRANSFER OUCTWORK. 0.5TING POSITIVE OR NEGATIVE STATIC <br />®DUCTBOARD <br />RECOMMENDED BY THE MANUFACTURER THE FILTERS SHALL PROVIDE <br />SYSTEMSOESIGN MODEL RTU-20 EQUIPMENT SUPPORTS AT <br />PRESSURE AND VELOCITIES LESS THAN 5W FPM. <br />C THE MECHANICAL CONTRACTOR SHALL PROVIDE A HONEYWELL. <br />ASHRAE FILTRATION EFFICIENCY AS SHOWN ON THE CONSTRUCTION <br />THE HEIGHT REQUIRED BY TABLE 1509.7 OF THE FLORIDA <br />MODEL T350 PROGRAMMABLE THERMOSTAT WITH A REMOTE <br />DOCUMENTS OR 30% ASHRAE FILTRATION EFFICIENCY (MERV 6) IF NO <br />BLALOING CODE UNLESS, OTHERWISE NOTED ON THE <br />ANY OTHER DUCTWORK: REFER TO SMACNA "RVAC DUCT CONSTRUCTION <br />SENSOR AND A LOCKABLE COVER FOR EACH NEW AND <br />FXHAUST/OUTSIDE AIR: <br />HIGHER VALUE IS SPECIFIED. <br />CONSTRUCTION DOCUMENTS_ <br />STANDARDS". <br />EXISTING MR CONDITIONING SYSTEM. THE MECHANICAL <br />® SHEET METAL <br />D. THE MECHANICAL CONTRACTOR SHALL. PROVIDE ALL STARTERS, <br />ALL RECTANGULAR METALLIC DUCTWORK SHALL BE SHOP <br />CONTRACTOR SHALL ALSO PROVIDE ONE (1) PERSONAL <br />DIGITAL ASSISTANT (PDA)AND HONEVWELLS THERMOSTAT <br />❑ DUCTBOARD <br />CONTACTORS, RELAYS, CONTROLS, AND ACCESSORIES NECESSARY TO <br />FABRICATED OF GALVANIZED STEEL SHFFTS. FOLLOWING ARE THE <br />INTERFACE MODULE AND PROGRAMMING SOFTWARE THE <br />PROVIDE A COMPLETE AND WORIONG POWER AND CONTROL SYSTEM FOR <br />SMACNA RECOMMENDATIONS FOR GAUGES AND SEAMS. CONFORM <br />MECHANICAL CONTRACTOR SHALL COORDINATE THE INITIAL <br />THE MECHANICAL EQUIPMENT WITHIN THE SCOPE OF WORK. THE <br />TO THE RECOMMENDATIONS OF SMACNA AS TO SEAMS. JOINTS, <br />OCCUP R <br />OCCUPANCY SCHEDIAE(S) AND PROGRAMMBM WITH THE <br />NOTES: <br />ELECTRICAL. CONTRACTOR WILL PROVIDE ALL DISCONNECT SWITCHES, <br />CROSS BREAKS AND TRANSITIONS, ETC. <br />ANDYPROVIDE TRAINING <br />P . ALL <br />REQUIRED. ALL <br />OWNERPROGR <br />® UTILIZE MATERIALS ABOVE UNLESS NOTED OTHERWISE ON PLANS <br />CONDOR, AND WIRING FOR THE MECHANICAL EQUIPMENT WITHIN THE <br />SCOPE OF WORK. ALLL ELECTRICAL WORK SHALL COMPLY WITH THE <br />SHALL COMPLETED USING WELL'S <br />THERMOSTAT PROGRAMMING SOFTWARE. <br />® CONTRACTOR TO PROVIDE DEDUCTIVE COST ALTERNATE FOR USE OF <br />REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. THE MECHANICAL. <br />RECTANGULAR STEEL DUCT GAGE <br />DUCTBOARD <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER OPERATION OF <br />DUCT WITH FLATS' SLIP WITH STANpING 5' SLIP <br />D. EACH SENSOR SHALL HE INSTALLED AT 4'6' ABOVE THE <br />THE COMPLETE SYSTEM AND STALL ENSURE THAT WING DIAGRAMS ARE <br />DIAMETER IN INCHES ON S SPACING GA ON 5 SPACING GA <br />( ) ( ) <br />FINISHED FLOOR UNLESS OTHERWISE NOTED THE <br />PROVIDED D I THE GENERAL CONTRACTOR NO WIRING OF ANY KIND SHALL <br />I <br />BE EXPOSED IN FINISHED AREAS. <br />AL <br />CONSTRUCTION DOCUMENTS. THE MECHANICAL CONTRACTOR <br />SHALL COORDINATE THE EXACT LOCATION OF EACH SENSOR <br />BASIC CD. MATERIAL REOUNRENENTS � <br />0 - 12 26 26 B <br />WITH THE OWNER AND SUBMIT THE PROPOSED LOCATION TO <br />E- HOUSEKEEPING PADS: THE. GENERAL AND MECHANICAL. CONTRACTORS <br />13 - 14 24 26 B <br />MECHANICAL ENGINEER OF RECORD FOR APPROVAL. THE <br />CONDENSATE DRAIN: <br />SHALL PROVIDE A 4' MGM CONCRETE HOUSEKEEPING PAD UNDER ALL <br />MECHANICAL EQUIPMENT, UNLESS OTHERWISE NOTED ON THE <br />15 - 18 22 265 <br />19 - 20 20 26 C <br />MECHANICAL CONTRACTOR SHALL PROVIDE COORDINATION OF <br />ALL SENSOR FINISHES WITH ROOM FINISHES AT NO ADDITIONAL <br />® SCHEDULE 40. PVC <br />CONSTRUCTION DOCUMENTS. THE HOUSEKEEPING PAD SHALL. EXTEND P <br />BEYOND THE <br />21 - 26 18 26 C <br />COST TO THE OWNER. <br />❑ COPPER, TYPE L. WIARMAFLEX INSULATION <br />MECAMCAL EQUIPMENT ON ALL SIDES. <br />27 - 28 16 26 C <br />E ELECTRIC DUCT HEATERS: ELECTRIC DUCT HEATERS SHALL BE <br />29 - 30 16 26 D <br />E. ALL EXHAUST AND OUTSIDE AIR FANS SHALL INTERLOCKED <br />WITH THE AIR HANDLER SERVING THEEASSOCIATED SPACE. <br />NOTES: <br />UNDERWRITERS` I ABOIA I DRIES LISTED, BEAR THE SILL OR MARK OF AN <br />31 - 36 - 240 <br />®1JQ117'F MATERIALS ABOVE UNLESS NOTED OTHERWISE ON PLANS <br />APPROVED TESTING AGENCY. AND BE EQUIPPED WITH AN APPROVED. <br />37 - 42 - 24 E <br />F. ALL 120-VOLT RESTROOM EXHAUST FANS WITH ELECTRICAL <br />AUTOMATICALLY RESETTING OUTLET AIR TEMPERATURE LIMIT CONTROL <br />43 - 60 - 22 G <br />REQUIREMENTS OF UP TO SIX WATTS SKILL BE CONTROLLED <br />THAT WILL LIMIT THE OUTLET AIR TEMPERATURE TO NOT MORE THAN 20mv <br />BY AN OCCUPANCY SENSOR WITH A TIME DELAY. THE INITIAL <br />THE MECHANICAL CONTRACTOR AND MANUFACTURER SMALL EQUIP THE <br />STANDINGS' SLIP <br />STANDING <br />TIME DELAY SHALL BE SET AT TWENTY (20) MINUTES <br />ELECTRIC ELEMENTS OF THE HEATER WITH FUSIBLE LINKS ORA MANUAL <br />RESET TEMPERATURE CONTROL THAT WILL PREVENT THE OUTLET AIR <br />SIZE <br />G THE MECHANICAL CONTRACTOR SHM.I PROVIDE A THE CLOCK <br />INSULATION MATERIAL REQUEEIbENTSI <br />TEMPERATURE FROM EXCEEDING 25(PF. EACH ELECTRIC DUCT HEATER <br />FOR ALL OUTDOOR AIR FANS THE MECHANICAL CONTRACTOR <br />SHALL BE INTERLOCKED WITH THE ASSOCIATED MR HANDLER TO ENSURE <br />B 1' x 26 GA <br />SHALL COORDINATE THE INITIAL OCCUPANCY SCHEDULE(S) <br />ON CONCEALED DUCTWORK. <br />ELECTRIC DUCT HEATER SHUTDOWN IN THE EVENT OF AN AIR HANDLER FAN <br />C 1'x 22 GA <br />AND SETTINGS WITH THE OWNER AND PROVIDE TRAINING AS <br />®FLEXIBLE FIBERGLASS <br />FAILURE. <br />D 1-1/6' x 22 GA <br />REQUIRED. <br />E 1-I18' x 18 GA <br />❑ FIBROUS DUCTBOARD <br />G 1-5/8' x 18 GA <br />Os .Rae N: sea 1.s 1 .Da <br />REFER TO SMAGNA TABLES FOR REINFORCEMENT FOR DUCT LENGTHS <br />ON EXPOSED DUCTWORK- <br />OTHER THAN FIVE (5) FEET. <br />❑ FLEXIBLE FIBERGLASS <br />G L� B A L <br />ALL ROUND RIGID METAL DUCTWORK CAN BE PREFABRICATED OR SHOP <br />FOLLOWING ARE THE SMACNA RECOMMENDATIONS FOR <br />al FIBROUS DUCTBOARD S�NCu c- <br />C <br />GAUGES AND SEAMS. ELBOWS SHALL. HAVE CENTERLINE RADIUS OF 1-1/2 <br />TIMES DUCT DIAMETER. THE CONTRACTOR MAY PROVIDE EQUIVALENT <br />INCFABRICATED. <br />R-VALUE: <br />ROUND OR RECTANGULAR DUCT AS CONDITIONS AND SPACE PERMIT. <br />® IN UNCONDITIONED SPACE, R-8 M E P F ENGINEERING <br />© ALL OTHER DUCTWORK, R-4.2 IN FOPGLOBAL-SANCHE2.COM <br />CA4'': 6237 <br />NOTES: 816 MANATEE AVE. E, SUITE 16 <br />® UTILIZE MATERIALS ABOVE UNLESS NOTED OTHERWISE ON PLANS BRADENTON, FL 34208 <br />PHONE: 941-75B-2557 <br />1CG7 -ND E RGON CLVD.. <br />SUITE 103 <br />TAMPA, FL 33629 <br />PHONE: B13-281-0001 <br />C&K ARCHITECTS I INTERIORS <br />- MW!ur -kft m design. tlicnt n iM <br />AACOO16- <br />4221 WEST BOY SCOUT RI VD., SUIIE 150 <br />TAMI'A, FL 33607-5743 <br />813.8B4.2000 <br />280 WEST CENTRAL AVE. <br />WINTER HAVEN, FL 33880-2957 <br />863.577.2054 <br />s\� A. sF <br />N o. 71454' i <br />t, <br />A 7 t <br />* <br />-A X 5/14/2021 j,* <br />CO.. STATE OF ' Nv <br />Fs � ORIDP+ Q;' <br />S70NAL E� <br />E'I'l, <br />i <br />9 <br />EE <br />QJ/ <br />Ii O <br />Z <br />W <br />44 <br />•. <br />J <br />d <br />U 0 <br />Z 0 <br />2 pp <br />U ao <br />Lu <br />m <br />P <br />MD <br />BAI®Fm <br />PERMIT <br />FMOIBCTRWYBI <br />21020 <br />DATE <br />5.5.21 <br />Dullim IMMOH <br />mo 1 <br />