My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6270 Silverado Ranch Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
6270 Silverado Ranch Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 1:11:32 PM
Creation date
2/19/2025 9:15:53 AM
Metadata
Fields
Template:
Building Plans
Street #
6270
Location
Silverado Ranch Blvd
Contractor
Cornerstone Solutions
Building Plans - Permit #
17074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAIN PI ATr /L <br />I <br />STONE VENEER <br />MORTAR 5ETTIN6 <br />BED <br />METAL LATH <br />WEATHER RE515TANT <br />BARRIER <br />EXTERIOR 5HEATHIN(5 <br />(5EE 5TRUGTURAL DR1165) <br />2X FRAMING (5EE <br />5TRUGTURAL DRWG5 FOR <br />51ZE AND 5PAGIN(5) <br />ELEV. 28' <br />5EE REFLECTED GEILING <br />\ PLAN <br />2 - 2X4 TOP PLATE <br />FIBER CEMENT TRIM ON <br />BOTH SIDES <br />WEATHER RE515TANT <br />BARRIER BOTH 51DE5 <br />7/I6" 05B BOTH 51DE5 <br />2X4 5TUD5 16' O.G. <br />FLASHING OVER SEALANT <br />$ BACKER ROD <br />2X4 P.T. SILL PLATE ON <br />BED OF SILL SEALER <br />SEALANT 4 BACKER ROD <br />SPIKE BED <br />Ix FIBER CEMENT SILL <br />T.O. MA50NRY jh <br />ELEV. 22--0' <br />FIBER CEMENT TRIM OVER <br />5HEATHINS ON 2x8 FRAMING <br />FIBER CEMENT LAP <br />5101% <br />WEATHER RE515TANT <br />BARRIER <br />PROVIDE BRAGINS A5 <br />REQUIRED (5EE <br />5TRUGTURAL DRW 6) <br />8" GMU (5EE 5TRUGTURAL <br />DRW65 FOR <br />REINFORCING) <br />FIBER CEMENT LAP 5IDING <br />ON FURRING <br />2X P.T. SILL ON 51LL FLOOR FINISH PER <br />SEALER (5EE 5TRUGTURAL BUILDER <br />DRW65 FOR 51ZE AND <br />ANCHORING) <br />T.O. FIN15HED <br />I <br />ELEV <br />W5 <br />4 <br />m <br />ELEV. 01'4' <br />5EE REFLECTED GEILING <br />PLAN <br />FRIEZE BOARD PER <br />ELEVATION <br />BOARD AND BATTEN 5IDIN6 <br />OVER 2x FURRING <br />Ix4 TRIM PER ELEVATION <br />8" GMU (5EE 5TRUGTURAL <br />DRW65 FOR <br />REINFORCING) <br />TILE PER OWNER <br />FLASHING WITH SEALANT <br />OVER BACKER ROD <br />Ix2 OVER Ixb TRIM <br />RFAGE GOUNTERTOP 4 <br />%BALCKVLA5H <br />8" FIBER CEMENT LAP 5I0ING <br />OVER 2x FURRING <br />FLOOR FIN15H PER <br />BUILDER <br />T.O. FINISHED FLOOR <br />_ . FI Pv nI <br />PRIME 8 PAINT a W V <br />EXPOSED CONCRETE TO <br />MATCH WALL ADJACENT <br />WALL 5URFAGE <br />SOLID 5URFAGE <br />COUNTERTOP <br />2 - 2X4 TOP PLATE <br />8" FIBER GEMENT LAP 5I0ING ON <br />EXTERIOR 5HEATHIN6 <br />2X4 P.T. SILL PLATE ON <br />_v <br />BED OF SILL 5EALER <br />WEEP 5GREED 2" ABOVE SLAB <br />CONDITION, 7" ABOVE GRADE <br />COCONDITION <br />� <br />v <br />k <br />BA5E TRIM PER BUILDER <br />FLOOR FIN15H PER <br />BUILDER <br />T.O. FINISHED FLOOR <br />W7 <br />ELEV. 0'-0" <br />PRIME d PAINT <br />EXPOSED CONCRETE TO <br />MATCH WALL ADJACENT <br />WALL 5URFAGE <br />ELEV. q'- <br />5EE REFLECTED GEILING <br />PLAN <br />FRIEZE BOARD PER <br />ELEVATION <br />FIBER CEMENT 5I0ING - IN5TALLED <br />PER MANUFACTURER'S <br />5PEGIFIGATION5 (5EE ELEVATION5) <br />2X P.T. <br />FURRING <br />WEATHER RE515TANT <br />BARRIER <br />CEMENT PLASTER <br />FINISH <br />- FLASHING WITH SEALANT <br />OVER BACKER ROD <br />8' GMU (5EE 5TRUGTURAL <br />DRWG5 FOR <br />REINFORGIN6) <br />Ix2 OVER Ixb TRIM <br />TILE FIN15H, PER OWNER SELECT <br />FIBER CEMENT 5I0ING - <br />IN5TALLED PER MANUFACTURER'S <br />5PEGIFIGATION5 (5EE <br />ELEVATIONS) <br />2X P.T. FURRING AT 16" O.G. <br />TILE BA5E <br />5TAINED CONCRETE <br />FLOOR <br />T.O. FINISHED FLOOR <br />• ELEV. 01-0" <br />W6 <br />MAIN PLATE MAIN PLATE MAIN PLATE MAIN PLATE A MAIN PLATE <br />ELEV. q'-4° ELEV. q'-4" ELEV. q'-4" ELEV. q'-4" <br />5EE REFLECTED GEILING 5EE REFLECTED GEILING 5EE REFLECTED GEILING 5EE REFLECTED GEILING <br />PLAN PLAN PLAN PLAN <br />FRIEZE BOARD PER FRIEZE BOARD PER FRIEZE BOARD PER <br />ELEVATION ELEVATION ELEVATION <br />FIBER CEMENT 5IDING FIBER CEMENT 5IDING <br />(5EE ELEVATION5) (5EE ELEVATION5) <br />2" FURRIN6 2" FURRING <br />BOARD AND BATTEN 5I0IN6 BOARD AND BATTEN 5IDING <br />OVER 2x FURRING OVER 2x FURRING <br />8" GMU (5EE 5TRUGTURAL 8" GMU (5EE 5TRUGTURAL 8" GMU (5EE 5TRUGTURAL 8" GMU (5EE 5TRUCTURAL <br />DRWG5 FOR DRWGS FOR DRW65 FOR DRW65 FOR <br />REINFORCING) REINFORGING) REINFORGING) REINFORGIN5) <br />PRIME d PAINT <br />PRIME 4 PAINT <br />FLASHING WITH SEALANT <br />OVER BACKER ROD FLASHING WITH 5EALANT <br />OVER BACKER ROD <br />FIBER CEMENT LAP 5IDING (5EE FIBER CEMENT LAP 5IDING (5EE PRIME d PAINT BOTH <br />ELEVATION5) ELEVATIPN5) 51DE5 <br />Ix2 OVER Ixb TRIM 2x FURRING 2x FURRING <br />8" FIBER CEMENT LAP SIDING <br />OVER 2x FURRING <br />- 4 <br />- cn <br />FLOOR FINISH PER <br />FLOOR FIN15H PER FLOOR FIN15H PER FLOOR FIN15H PER BUILDER <br />BUILDER BUILDER BUILDER <br />T.O.F NI FLOOR <br />s ELEV. O -O a . M1 - ELEV. O O ELEV. 0 -O a^ ELEV. O -O d ELEV. O -O <br />sa%' V _s$'r' <br />- 6 - - . V ' - . �. ^ - ® 4. . • to dV > ` @ - e - � � - A - qA d <br />_ v <br />W4PRIME d PAINT W3 PRIME 3 PAINT W2 W 1 W <br />EXP05ED CONCRETE TO EXP05ED CONCRETE TO <br />MATCH WALL ADJACENT MATCH WALL ADJACENT <br />WALL 5URFAGE WALL 5URFAGE <br />0 <br />m <br />ELEV. q'-4" <br />SEE REFLECTED GEILING <br />PLAN <br />FRIEZE BOARD PER <br />ELEVATION <br />BOARD AND BATTEN SIDING <br />OVER 2x FURRING <br />8" GMU (SEE STRUCTURAL <br />DRWGS FOR <br />REINFORCING) <br />FLASHING WITH SEALANT <br />OVER BACKER ROD <br />Ix2 OVER Ixb TRIM <br />8" FIBER CEMENT LAP 5IDING <br />OVER 2x FURRING <br />FLOOR FINISH PER <br />BUILDER <br />FLOOR <br />� <br />1 P <br />;W <br />• <br />M <br />a <br />WiN <br />zF� <br />oas <br />U <br />�' CZ.� O <br />�WQ <br />ao� <br />C/) <br />Z <br />¢Nx <br /><mc� <br />� <br />Z <br />FAQ <br />Cn <br />a <br />W <br />> <br />cl <br />G: � z <br />W <br />"Ja <br />y�u <br />a <br />� <br />Z� <br />W <br />Nao <br />aua <br />aQ� <br />N <br />` <br />�IiO <br />m� <br />U O <br />� L.L <br />(!) N <br />BSB <br />DESIGN <br />www.bsbdesign.com <br />100 Main St. Suite 209 <br />Safety Harbor, Florida 34695 <br />813 265 4808 <br />JOB N0: AM150335 PROJ MGR: JD <br />DRAWN: GDE CHECKED: JD <br />WALLTYPES <br />A7mO <br />BSB <br />DESIGN <br />www.bsbdesign.com <br />100 Main St. Suite 209 <br />Safety Harbor, Florida 34695 <br />813 265 4808 <br />JOB N0: AM150335 PROJ MGR: JD <br />DRAWN: GDE CHECKED: JD <br />WALLTYPES <br />A7mO <br />
The URL can be used to link to this page
Your browser does not support the video tag.