Laserfiche WebLink
JUN 0 8 2020 <br />MASONRY LINTEL ASSEMBLIES <br />5EE 56HER LE AND 5PEGIFIGATION5 FOR AWL INFO <br />�_ 6ROUT 6ROVr <br />- BOTTOM REINF. <br />PRECAST LINTEL w/ PRECAST LINTEL w/ <br />_ EMBEDDED REIN. EMBEDDED REW <br />MB- I MB-2 <br />m� <br />v <br />TOP REINF. OR CONT. <br />BOND BEAM REW <br />-- <br />cRouT <br />BOTTOM REINF. <br />PRECAST LINTEL <br />REINF. EMBEDDED NF.. <br />MB-3 <br />CONT. BOND BEAM <br />REW A5 REOV <br />--- bRaur <br />- BOTTOM RENW. <br />PRECA5T LINTEL W <br />EMBEDDED REW <br />r <br />MB-4 <br />MASONRY LINTEL DETAILS <br />REINFORCEMENT <br />MARK <br />DE516NATION <br />TOP <br />BOTTOM <br />SHEAR REINFORCEMENT <br />M13-1 <br />bFb-OB/OT <br />----- <br />----- <br />M13-2 <br />bFb-IB/OT <br />----- <br />(1) #5 <br />M13-3 <br />BFib-IB/IT <br />(1) #5 <br />(1) #5 <br />M13-4 <br />BRF14-I5 <br />----- <br />----- <br />APPROVED LINTEL MANUFAGTURER5 ARE: GA5T-GRETE, QUALITY PRECAST GO., <br />AND LOTT'S GONGRETE. <br />NOTES: <br />I. ALL LINTELS w/ SPANS GREATER THAN 14'-0" SHALL BE PRE5TRE55ED. <br />2. SHORE FILLED LINTELS A5 REGMIED. <br />3. ALL LINTELS SHALL HAVE 4" MINIMUM BEARIN6 U.N.O. <br />4. DO NOT GUT OR MODIFY PRE5TRE55ED LINTEL5. <br />5. ALL REINFORCEMENT SHALL BE GRADE 60, fy=bO ksl <br />b. ALL LINTELS 5PEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DESIGN. <br />1. ALL LINTELS ARE TO BE LOGATED DIREGTLY ABOVE THE OPENING BELOW <br />SHEET LIST INDEX <br />SHEET DESCRIPTION <br />SHEET TITLE <br />5-0.0 <br />STRUCTURAL NOTES <br />F-1.0 <br />SLAB PLAN <br />F-2.0 <br />BLOCK PLAN <br />5-1.3 <br />ROOF FRAMING PLAN <br />50-1 <br />FOUNDATION DETAILS <br />50-2 <br />STRUCTURAL DETAILS <br />P135B-I <br />15TRUGTURAL DETAILS <br />GENERAL STRUCTURAL NOTES <br />FOUNDATION <br />• DE516N 15 BASED ON 6th EDITION (2011) FLORIDA BUILDIN6 CODE. <br />• FOOTING DESIGN - THESE FOOTIN65 HAVE BEEN ENGINEERED FOR A <br />MINIMUM ALLONABLE 501L BEARIN6 CAPACITY OF 1,500 PSF. <br />• ALL LUMBER EXPOSED TO HEATHER OR IN CONTACT H/ CONCRETE <br />OR MASONRY FOUNDATION SHALL BE PRESERVATIVE TREATED <br />SOUTHERN PINE #2. <br />• FASTEN PARTITION NALL5 TO SLAB WITH)/4" DIA. x 23/4" LONG <br />TAPGON5 0 32" o.c. MAX. WITH A MINIMUM OF 2 TAPGON5 PER <br />PLATE, 12" MAX. FROM PLATE ENDS. <br />• BUILDER TO VERIFY GORRo5ION-RE515TANGE COMPATIBILITY OF <br />HARDWARE 4 FASTENERS IN CONTACT W PRESERVATIVE -TREATED <br />HOOD. CONTACT LUMBER t HARDWARE SUPPLIERS TO GOORD. <br />• CONCRETE DESIGN BASED ON AGI 318. CONCRETE SHALL ATTAIN <br />THE FOLLOWIN6 MINIMUM COMPRE551VE 5TRENOTH5 IN 28 DAYS, <br />U.N.O.: <br />f'c = 2,500 psi:....... FOOTINGS <br />2,500 psi:....... SLABS ON 6RADE (INTERIOR $ EXTERIOR) <br />fy = 60,000 psi ...... REBAR <br />• ALL CONCRETE EXPOSED TO THE WEATHER SHALL NOT HAVE LESS <br />THAN 5% OR MORE THAN 7% AIR ENTRAINMENT. <br />• ALL FOOTIN65 SHALL BEAR AT LEAST 12" BELOW FIN15H 6RADE. <br />• FOOTINC75 AND SLABS ON GRADE SHALL BEAR ON VIRGIN SOIL OR <br />195 COMPACTED FILL. <br />• MINIMUM LAP SPLICES ON ALL REINFORCEMENT SHALL BE 48 BAR <br />DIA. <br />• HOOKS SHALL BE PROVIDED AT DISCONTINUOUS END OF REINF. <br />• GROUT SHALL BE A5TM G416 F'c=3000 P51 W MAX 3/8" A66RE6ATE <br />• CONCRETE MA50NRY UNITS SHALL BE A5TM GqO WITH A MINIMUM <br />COMPRE551VE STRENGTH OF Ig00 P51 (F'M = 1500 P51). ALL <br />MORTAR SHALL BE A5TM G270, TYPE 5. GMU DE516N BASED ON <br />AGI 550/530.1 <br />• �REINFORCED GMU GORES (A5 INDICATED ON PLAN) SHALL <br />BE REINFORCED w/ (1) #5 BAR VERTICAL. BAR SHALL <br />EXTEND INTO BOND BEAM AT TOP HALL AND SHALL <br />AL16N WITH FOOTIN6 DOWEL BELON. PROVIDE MIN 30" <br />LAP SPLICE WITH FOOTIN6 DOWEL. <br />• 6ROUT SOLID ALL REINFORCED GMU GELL5 AND BOND BEAMS <br />• ALL BOND BEAMS ARE TO BE 8" GONT. FULL LENGTH OF HALL w/ <br />(1) #5 BAR GONT. (TYP. ® EXT. PERIMETER) <br />• PROVIDE (1) #5 BAR 6ROUTED SOLID ON EACH 51DE OF ALL <br />MASONRY OPENINGS AND AT ALL HALL CORNERS. <br />• VERTICAL REINFORCEMENT SHALL BE HELD IN PLACE AT THE TOP <br />AND BOTTOM, SHALL BE LOCATED IN THE CENTER OF THE MASONRY <br />CELL; AND SHALL BE LOCATED AT A MAXIMUM OF 8'-O" O.G. IN <br />EXTERIOR HALLS. (AS 5HOHN ON PLANS) <br />• ROU614 OPENIN65 ARE GALLED OUT ON PLAN - <br />BUILDER TO VERIFY. <br />• PROVIDE CONTROL JOINTS AT ALL IN51DE GORNER5 OF 5LAB <br />EDGES, AND OTHER LOCATIONS WHERE SLAB CRACKS ARE LIKELY <br />TO DEVELOP. EXACT LOCATIONS PER BUILDER. <br />• 5AN GUT OR TOOLED JOINT DEPTH SHALL BE Y4 OF THE DEPTH <br />OF THE 5LAB W' FOR A 4" SLAB) <br />• JOINTS SHALL BE LOCATED 0 12'-0" O.G. (RECOMMENDED) OR <br />15-0" O.G. (MAXIMUM) <br />• JOINT GRID PATTERN SHALL BE A5 CLOSE TO SQUARES AS <br />POSSIBLE (I:1 RATIO), WITH A MAXIMUM OF 1:1.5 RATIO <br />CONNECTION SPECIFICATIONS (TYP. U.N.O.) <br />DESCRIPTION OF BLD6. ELEMENT <br />3"xO.131" NAILS <br />3"xO.120" NAILS <br />JOIST TO 50LE PLATE <br />(3) TOENAILS <br />(3) TOENAILS* <br />SOLE PLATE TO J015T/13LK'6. <br />(3) NAIL5 o 4" o.c. <br />(3) NAILS 0 4" o.c. <br />STUD TO SOLE PLATE <br />2) TOENAILS <br />(3) TOENAILS* <br />TOP OR SOLE PLATE TO STUD <br />2 NAILS <br />3 NAILS <br />RIM TO TOP PLATE <br />TOENAILS 0 8" o.c. <br />TOENAILS 0 6" o.c.* <br />BLK'6. BTHN. JOISTS TO TOP PL. <br />(3) TOENAILS <br />(3) TOENAILS' <br />DOUBLE STUD <br />NAILS 0 24" o.c. <br />NAILS 0 1611 o.c. <br />DOUBLE TOP PLATE <br />NAILS 0 24" o.c. <br />NAILS 0 16" o.c. <br />DOUBLE TOP PLATE LAP SPLICE <br />q NAILS IN LAPPED AREA <br />II NAILS IN LAPPED AREA <br />TOP PLATE LAP 0 GORNER5 # <br />INTER5EGTIN6 HALLS <br />(2) NAILS <br />(2) NAILS <br />* 2Y2"xO.113 15 AN AGGEPTABLE ALTERNATIVE TO A 3"0.120", SAME 5PAGIN6 OR NUMBER OF <br />NAILS. (ONLY ACCEPTABLE WHERE * ARE SHORN) <br />TH15 MODEL HA5 BEEN DE516NED IN <br />ACCORDANCE WITH THE 6th EDITION (2011) <br />FLORIDA BU I LD I N6 CODE (5EGT1 ON 160q) <br />LATERAL DE516N REGU I REMENT5 FOR THE <br />FOLLOWIN6 WIND SPEED � EXP05URE ONLY: <br />40 MPH - EXP. B <br />WIND IMPORTANCE FACTOR = 1.0 <br />INTERNAL PRE55URE GOEFF I G I ENT = <br />ENGLOSED, +/- 0.18 <br />ANY WIND 5PEED/EXPO5URE NOT L 15TED <br />HERE REOU I RE5 FORMAL EVALUATION $ <br />APPROVAL FROM MULHERN � KULP <br />STRUGTURAL EN61 NEER I N6. <br />EXTERIOR I$ SHEAR HALL <br />SHEATH I NG SPEC I r- I CAT I ONS <br />INDICATES LOCATION AND EXTENT OF <br />5HEARWALL WHICH REQUIRES 5HEATHIN6 <br />AND/ OR FA5TENIN6 SPECIFICATIONS <br />BEYOND THAT OF STANDARD <br />CONSTRUCTION <br />SYMBOL SHEAR PANEL SPEC. <br />15/32" PLYWOOD OR 0513 FASTENED w/ <br />PI 2Y211x0.131" NAILS @ 6" o.c. ALONG PANEL <br />ED6E5 AND 12" o.c. IN THE PANEL FIELD. <br />15/32" PLYWOOD OR 05B FASTENED W <br />P3 2/2"x0.131" NAILS @ 3" o.c. ALONG PANEL <br />ED6E5 AND 12" o.c. IN THE PANEL FIELD. <br />STANDARD EXTERIOR HALL 5HEATHIN6 REQUIREMENTS: <br />SHEATHE ALL EXTERIOR HOOD FRAMED NALL5 w/ i5/32" <br />PLYHOOD OR 0513 FASTENED W 2' 'xO.131" NAILS 0 6" O.G. AT <br />ALL PANEL ED6E5 AND @ 12" O.G. AT CENTER. (U.N.O. ON PLANS) <br />I. ALL PANEL E06ES SHALL OCCUR OVER FRAMIN6 OR 2X <br />BLOGKIN6 SHALL BE PROVIDED TO SUPPORT PANEL EDGE <br />AND FASTENING <br />2. ALL STRUCTURAL PANELS ARE TO BE DIRECTLY APPLIED TO <br />5TUD FRAMIN6 ® 16"o.c. MAX. U.N.O. ON PLAN. <br />3. ALL 5HEARHALL5 SHALL HAVE DOUBLE TOP PLATES <br />FASTENED TOGETHER W %"xO.131" NAIL5 ® 16"o.c. USE (8) <br />3Y2"x0.131" NAIL5 0 EA. LAP 5PLIGE. (TYP. U.N.O.) <br />4. LATERAL ANALY515 A55UME5 ALL INTERIOR 5HEARHALL5 <br />AND EXTERIOR HALLS ARE CONTINUOUS SHEATHED ABOVE <br />AND BELOW OPENIN65. <br />5. SEE ARCHITECTURAL DRAHING5 FOR ADD'L NALL <br />CONSTRUCTION REQUIREMENT5. <br />6. ALL EXTERIOR HALLS ARE CONSIDERED 5HEARHALL5. <br />7. WHERE PANELS ARE APPLIED TO BOTH FACES OF NALL, <br />PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT <br />FRAMING MEMBERS. <br />8. A MAXIMUM OF TWO 1'-4" HIDE X 2'-0" TALL OPENIN65 ARE <br />PERMITTED TO BE GUT INTO INTERIOR 5HEARHALL5 50 <br />LON6 A5 THEY ARE FRAMED OUT TO PROVIDE THE <br />5HEATHIN6 ED6E NAILIN6 REQUIRED AND OCCUR Ib" MINIMUM <br />FROM THE ENDS OF THE 5HEARHALL. <br />Window $ Door Allowable Wind Pre55ure5 <br />140 MPH Wind Zone EX o5ure B <br />OPENING 51ZE <br />INTERIOR ZONES <br />END ZONE5T <br />6 Garage Door <br />+18.5 P5F/-20.1 PSF <br />+18.5 P5F/-20.1 PSF <br />16 6aroge Door <br />+11.1 PSF/-19.1 PSF <br />+17:1 PSF/-19.7 PSF <br />10 SOFT. <br />+21.2 P5F/-22.1 PSF <br />+21.4 P5F/-28.3 PSF <br />20 SOFT. <br />+20.2 P5F/-22.0 P5F <br />+20.2 P5F/-26.4 P5F <br />50 SOFT. <br />+I1.0 P5F/-20.8 P5F <br />+I1.0 P51F/-231 PSF <br />100 SOFT. <br />+18.0 P5F/-I1.8 P5F <br />+18.0 P5F/-22.0 P5F <br />500 SOFT. <br />+15.8 P5F/-17.6 P5F <br />+15.8 PSF/-11.6 PSF <br />mEnd Zone is defined as the smaller of 10% of least horiz. dim. or 40% <br />of mean roof height. <br />NOTE: Pressures charted here are allowable pressures and have <br />been reduced per A56E 7-10 section 2.4.1 From ultimate <br />pressures. Divide allowable pressures above by a factor of 0.6 <br />to obtain ultimate pressures. <br />ROOF FRAMIN6 <br />• SEE ROOF TRU55 UPLIFT CONNECTOR SCHEDULE FOR ALL ROOF <br />TRUSS CONNECTORS, <br />• ROOF 5HEATHIN6 SHALL BE 1/16" MIN. 0513/PLYWOOD 5HEATHIN6 24/16, <br />EXPOSURE I. FASTEN 5HEATHIN6 TO ROOF MEMBERS w/ 2 %"x0.113" <br />RIN6 SHANK NAILS (R5R5-01 OR EQUIV.) 0 6" O.G. AT PANEL E06E5 <br />0 6" O.G. IN FIELD. FASTEN 5HEATHIN6 TO 6ABLE END 4 DRAG <br />TRUSSES W RIN6 SHANK NAILS 0 3" O.G. (U.N.O.). PROVIDE BLOCKING <br />ALONG PANEL EDGES AT FIRST 2 TRU55 BAYS FROM 6ABLE END. <br />PROVIDE "H" STYLE CLIPS ALON6 UNSUPPORTED EDGES. <br />• ROOF 5HEATHIN6 FOR MAIN ROOF TRU55E5 SHALL EXTEND <br />CONTINUOUSLY UNDER ALL OVERFRAMIN6. <br />• TRU55 ALL VALLEY SETS. FASTEN EACH TO TRU55 BELOW W <br />51MP50N VTGR CLIPS 0 24" O.G. <br />ALL METAL HANGERS SHALL BE SPECIFIED BY THE TRU55 <br />MANUFACTURER, UNLE55 OTHERN15E NOTED. <br />ERECT AND INSTALL ROOF TRUSSES PER NTGA 8 TPI'5 BGSI I <br />GUIDE TO 600D PRACTICE FOR HANDLING, IN5TALLIN6 4 BRAGIN6 <br />OF METAL PLATE CONNECTED HOOD TRUSSES." <br />• ROOF TRU55 SHOP DN65. SHALL BE SUBMITTED TO ARCH $ EN6. <br />FOR REVIEN AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• SUPPORT PORCH t SHORT SPAN ROOF TRUSSES w/ 2x4 LEDGER <br />FASTENED TO FRAMIN6 w/(2) 3"xO.I31" NAILS 0 I6" O.G. <br />UPLIFT CONNECTORS <br />BEARIN6 CONDITION <br />TRU55 <br />CONNECTOR <br />LENGTH <br />< 15' <br />51MP50N H2.5T <br />51N6LE ROOF TRUSS BEARIN6 ON <br />> 15' <br />51MP50N HIOA <br />HOOD STUD HALLMOOD BEAM <br />ROOF 61RDER TRUSS BEARIN6 ON <br />ALL <br />51MP50N HT520 <br />HOOD STUD NALL/NOOD BEAM <br />51N6LE ROOF TRUSS OR PORCH <br />ALL <br />51MP50N HETAI6 <br />BEAM BEARIN6 ON GMU NALL <br />ROOF G.T., FLUSH BEAM OR <br />ALL <br />(2) SIMPSON HETAI6 <br />FLUSH G.T. BRO. ON GMU HALL <br />ALL 13EARIN6 POINTS OF EACH ROOF TRU55 SHALL BE CONNECTED <br />KITH CONNECTOR AS LISTED ABOVE. <br />IT 15 THE RESPONSIBILITY OF THE ENGINEER OF RECORD TO DE516N <br />THE UPLIFT CONNECTORS PER SECTION 2.2 OF AN5I/TPI-2014 <br />"NATIONAL DES16N STANDARDS FOR METAL PLATE CONNECTED HOOD <br />TRU55 CONSTRUCTION". MW HAS ENGINEERED ALL ROOF TRU55 UPLIFT <br />CONNECTORS IN AGGORDANGE WITH THE REQUIREMENTS OF A5GE-1-10. <br />ALL UPLIFT CONNECTORS AND LOADS PER THI5 DRAWING SHALL <br />SUPERSEDE THE TRU55 MANUFACTURER'S UPLIFT CONNECTOR <br />5PEGIFICATION5 AND LOADS 5HOHN ON THE SHOP CARDS. <br />LEGEND <br />• ® INTERIOR BEARIN6 NALL <br />• _ _ _ = BEARIN6 NALL ABOVE <br />• BEAM / HEADER <br />• LOCATION AND EXTENT OF 5HEARHALL <br />• I; :1 EXTENT OF OVERFRAMIN6 <br />•- - - -INDICATES 1/8"A" SAN GUT CONTROL JOINT <br />INDICATES LOCATION OF REINFORCED GMU GORE <br />(SEE NOTES) <br />J L METAL HANGER <br />INDICATES P05T ABOVE. PROVIDE SOLID <br />BLOCKIN6 UNDER P05T OR JAMB ABOVE. <br />GENERAL STRUCTURAL NOTES <br />• DE516N 15 BASED ON bth EDITION (2011) FLORIDA BUILDING GODS. <br />• WOOD FRAME ENGINEERING 15 BASED ON N05, "NATIONAL DESIGN <br />SPECIFICATION FOR WOOD CONSTRUCTION" - LATEST EDITION. <br />• DE516N LOADS: <br />ROOF LIVE = 20 PSF <br />DEAD = 7 PSF T.G., 10 P5F B.G. <br />LOAD DURATION FACTOR = 1.25 <br />FLOOR LIVE = 40 P5F (INGLUDIN6 STAIRS 4 DECKS) <br />= 30 PSF ® 5LEEPING AREAS <br />= 50 P5F 0 6ARA6E <br />= 200 # POINT LOAD 0 6UARD5/HANDRAIL5 <br />= 50 PSF 0 GUARD IN -FILL COMPONENTS <br />DEAD = 10 PSF (20 P5F TOTAL ® TILE) <br />HIND ULTIMATE HIND SPEED t EXPOSURE AS LISTED <br />RI5K CATEGORY II <br />GENERAL FRAMING <br />• EXTERIOR HOOD STUD BEARIN6 HALLS SHALL BE 2x 5PF#2 OR <br />5YP#2 o lb" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• INTERIOR HOOD STUD BEARIN6 HALLS SHALL BE 2x 5PF OR 5YP <br />'STUD' 6RADE LUMBER o I b" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• ALL INTERIOR 5HEARHALL5 SHALL BE CONSTRUCTED WITH 2x <br />'STUD' 6RADE MEMBERS SPACED 0 16" O.G. (MAX). <br />• ALL NON-BEARIN6 INTERIOR STUD WALLS SHALL BE CONSTRUCTED <br />WITH 2x '5TUD' GRADE MEMBERS 5PAGED 0 24" O.G. (MAX). <br />• ALL HEADERS SHALL BE SUPPORTED BY (1)2x JACK STUD d (1)2x <br />KING STUD, MINIMUM. <br />- THE NUMBER OF STUDS SPECIFIED AT A SUPPORT INDICATE5 THE <br />NUMBER OF JACK STUDS REQUIRED, U.N.O.. <br />• ALL HEADERS, BEAMS 8 OTHER STRUCTURAL MEMBERS SHALL BE <br />SPRUCE -PINE -FIR #2 (5PF) OR SOUTHERN PINE #2 (5YP) LUMBER, OR <br />BETTER (KILN -DRIED). <br />• FACE NAIL MULTI -PLY 2x BEAMS 4 HEADERS N/ 3-RON5 OF 3"4.131" <br />NAILS 0 12" O.G. 5TA66ERED. APPLY NAILING FROM BOTH FACES 0 <br />3-PLY OR MORE GONDITION5. UTILIZE 2 RON5 OF NAILS FOR 2xb d <br />2x8 MEMBERS. <br />• FACE NAIL BUILT UP 2x P05T5 H/ 3"xO.I31" NAILS 0 16" O.G. <br />5TA66ERED. APPLY NAILIN6 FROM BOTH FACES 0 3-PLY OR <br />MORE CONDITIONS. <br />• REFER TO CONNECTION SPECIFICATIONS TABLE FOR ALL <br />CONNECTIONS (TYP. U.N.O. ON PLANS). <br />• SHEATH ALL HOOD FRAMED EXTERIOR HALLS w/ 1/I6" 05B <br />FASTENED w/ 2142"xO.131" NAILS 0 6" O.G. ® EDGES 4 12" O.G. 0 <br />CENTER FIELD. PROVIDE HORIZONTAL 2x BLOGKIN6 AT ALL <br />UNSUPPORTED PANEL ED6E5. TYPICAL U.N.O. ON THE PLANS. <br />• PROVIDE 50LID BLOCKING IN FLOOR SYSTEM UNDER ALL POSTS <br />CONTINUOUS TO FOUNDATION/BEARIN6. <br />• ENGINEERED LUMBER TO MEET OR EXCEED THE FOLLOWING: <br />• L5L - Fb=2325 psi; Fv=310 psi; E=1.55AO'b psi <br />• LVL - Fb=2600 psi; Fv=285 psi; E=2.Ox10"6 psi <br />. FOR 2 $ 3 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES TOGETHER <br />WITH 3 RON5 OF 3"0.131" NAILS o 8" o/G OR 2 ROH5Y4"412" <br />51MP50N 505 5GREN5 (OR 3Y2" TRU55LOK 5GREN5) 0 I b" OIG. USE <br />A MINIMUM OF 3 ROWS FOR BEAM DEPTHS OF 14" OR GREATER. <br />APPLY FA5TENIN6 AT BOTH FACES FOR 3-PLY CONDITION. LOCATE <br />TOP d BOTTOM NAIL5/5GREN5 2" FROM ED6E. SOLID 3Y2" OR 5Y4" <br />BEAMS ARE ACCEPTABLE. USE 2 RON5 OF NAILS FOR 2x6 4 2x8 <br />MEMBERS. <br />• FOR 4 PLY BEAMS OF EQUAL NIDTH, FASTEN PLIES T06ETHER <br />WITH 3 RON5 OFY4"xb" SIMP50N 5DS 5GREN5 (OR b 3/4" TRU55LOK <br />5GREN5) 0 I b" 0/6. USE A MINIMUM OF 4 ROHS FOR BEAM DEPTHS <br />OF 14" OR 6REATER. APPLY FASTENING AT BOTH FACES (ONE SIDE <br />ONLY FOR TRU55LOK 5GREN5). LOCATE TOP AND BOTTOM 5GREN5 <br />2" FROM ED6E. A 50LID 7" BEAM 15 ACCEPTABLE. <br />• ALL INTERIOR NALL STUDS IN CONTACT w/ GMU HALLS SHALL BE <br />PRESERVATIVE TREATED AND FASTENED w/Y4" DIA. X 4" LONG <br />TAPGONS 0 24" O.G. <br />FLOOR FRAMIN6 <br />• I-JOI5T5/TRU55E5 SHALL BE DE516NED BY MANUF. TO MEET OR <br />EXCEED L/480 LIVE LOAD DEFLECTION CRITERIA. <br />• ALL METAL HAN6ER5 SHALL BE SPECIFIED BY I -JOIST /TRU55 <br />MANUFACTURER, UNLESS OTHERHI5E NOTED. <br />• I-JOIST/TRU55 SHOP DN65. SHALL BE SUBMITTED TO ARCH. d EN6. <br />FOR REVIEH AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• FLOOR 5HEATHIN6 SHALL BE 23/32" GONFORMIN6 TO P52-04, <br />24" O.G., EXPOSURE I, TON6UE AND 6ROOVE E06E5, FASTEN <br />5HEATHIN6 TO FRAMING MEMBERS H/ 6LUE AND 3"x0.131" NAILS o <br />b" O.G. AT PANEL ED6E5 1 12" O.G. AT INTERMEDIATE SUPPORTS. <br />TYPICAL 5TAIR GON5TRUCTION NOTES <br />• (3) 51N6LE PLY 2x12 5TRIN6ER5 FASTENED TO HEADER AT TOP OR <br />LANDING, WHERE APPLICABLE, AND 2xb P.T. PLATE AT BOTTOM w/ <br />(1) SIMP50N A35 CLIP AT EACH 5TRN6ER. <br />• FASTEN 2xb P.T. PLATE TO CONCRETE SLAB w/ (3) 3/6" DIA. x 3Y2" <br />LONG TAPGON5. <br />• FASTEN END 5TRIN6ER5 TO ADJACENT HALLS w/ (2) 3"xO.131" NAILS <br />AT EACH STUD, HHERE APPLICABLE. <br />• PROVIDE 3/4" FLOOR DEGKIN6 ON RISERS AND I" FLOOR DEGKIN6 <br />ON TREADS. <br />• SEE STAIR FRAMING SECTION FOR MORE INFO. <br />seal: <br />e`ttt►111111111 <br />NA <br />*' •*- <br />r , <br />70 T OF <br />ORI®P •�ti�` •�^• <br />z <br />z <br />JCE <br />W <br />=LU <br />z <br />z <br />120 <br />z <br />w <br />J <br />a <br />Z <br />U <br />WF_ <br />3 <br />JH <br />z <br />W <br />CO) <br />W <br />cc <br />Vr <br />rn <br />CD <br />A 4 <br />c E <br />a a, <br />m <br />E <br />�a <br />0 <br />coW' <br />mc9 <br />0 <br />N <br />M CL <br />MW project number: <br />068-2200 1 1 <br />project mgr <br />drawn by: <br />issue date: <br />JSB I <br />KGK <br />O -20-20 <br />REVISIONS: <br />date: initial: <br />sheet: <br />a <br />rC <br />r1 <br />J <br />W <br />0 <br />2 <br />- <br />Z <br />O <br />a. <br />Q <br />0 <br />LL <br />U <br />0 <br />Z <br />x <br />ttIL <br />v1 <br />r� <br />V <br />'Q <br />z <br />0 Z <br />J J <br />SM0.0 <br />