Laserfiche WebLink
MASONRY L I NTEL A55EM5L I E5 <br />5EE 5CHEOULE AND 5PEGIFIGATION5 FOR ADD'L INFO <br />LgJ+I- MIN. (1) COURSE/BOND I LQ J+ �- MIN. (1) GOUR5E/BOND <br />i BEAM ABOVE LINTEL i BEAM ABOVE LINTEL <br />GROUT 6ROUT <br />BOTTOM REINF. <br />I a• I PRECAST LINTEL W I ,, I PRECAST LINTEL W <br />EMBEDDED REINF. ' t-�# EMBEDDED REW <br />MB-I MB-2 <br />'+- TOP COURSE, IF <br />m I L4J+ i - TOP COURSE, IF L.Q <br />i . REQ'D PER ARCH. <br />i REOV PER ARCH. GONT. BOND BEAM <br />TOP REINF. OR GONT. REINF. A5 REQD <br />z BOND BEAM REINF. GROUT <br />6ROUT `r . BOTTOM REINF. <br />BOTTOM REINF. <br />a - PREGA5T LINTEL W <br />Aga EMBEDDED REINF. <br />EMBEDDED REINF. <br />I a• I PRECAST LINTEL . #- - # <br />_ #�# N. <br />MB-3 ry MB-4 <br />MA50NR`1' LINTEL DETAILS <br />REINFORCEMENT <br />MARK <br />DE516NATION <br />TOP <br />BOTTOM <br />SHEAR REINFORCEMENT <br />M15-1 <br />8F8-OB/OT <br />----- <br />----- <br />MB-2 <br />bFb-IB/OT <br />----- <br />(1) #5 <br />M13-3 <br />SFIb-IB/IT <br />(1) #5 <br />(1) #5 <br />M13-4 <br />SRFI4-I13 <br />----- <br />----- <br />APPROVED LINTEL MANUFAGTURER5 ARE: GA5T-GRETE, QUALITY PREGA5T GO., <br />AND LOTT'5 CONCRETE. <br />NOTES: <br />I. ALL LINTELS W 5PAN5 GREATER THAN 14'-O" 5HALL BE PRE5TRE55ED. <br />2. 5HORE FILLED LINTELS A5 REGURIED. <br />5. ALL LINTEL5 SHALL HAVE 4" MINIMUM BEARIN6 U.N.O. <br />4. DO NOT GUT OR MODIFY PRE5TRE55ED LINTEL5. <br />5. ALL REINFORCEMENT SHALL BE GRADE 690, fy=bO k51 <br />b. ALL LINTEL5 5PEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DE516N. <br />7. ALL LINTELS ARE TO BE LOCATED DIRECTLY ABOVE THE OPENING BELOW <br />SHEET LIST INDEX <br />SHEET DESCRIPTION SHEET TITLE <br />5-0.0 5TRUGTURAL NOTES <br />F-1.0 <br />SLAB PLAN <br />F-2.0 <br />BLOCK PLAN <br />5-1.2 <br />5EGONO FLOOR FRAMIN6 PLAN <br />5-1.5 <br />ROOF FRAMING PLAN <br />5D-I <br />FOUNDATION DETAILS <br />5D-2 <br />STRUCTURAL DETAILS <br />5D-3 <br />STRUCTURAL DETAILS <br />6ENERAL STRUCTURAL NOTES <br />FOUNDATION <br />• OE516N 15 BASED ON lth EDITION (2020) FLORIDA BUILDIN6 CODE. <br />• FOOTIN6 DE516N - THESE FOOTIN65 HAVE BEEN EN6INEEREO FOR A <br />MINIMUM ALLOWABLE 501L BEARING GAPAGITY OF 1,500 P5F. <br />• ALL LUMBER EXPOSED TO WEATHER OR IN CONTACT W/ CONCRETE <br />OR MASONRY FOUNDATION SHALL BE PRESERVATIVE TREATED <br />SOUTHERN PINE #2. <br />• FASTEN PARTITION WALLS TO 5LAB WITH Y4" DIA. x 23/4" LONG <br />TAPGON5 @ 52" o.c. MAX. WITH A MINIMUM OF 2 TAPGON5 PER <br />PLATE, 12" MAX. FROM PLATE ENDS. <br />• BUILDER TO VERIFY GORR0510N-RE515TANGE COMPATIBILITY OF <br />HARDWARE $ FA5TENER5 IN GONTAGT w/ PRESERVATIVE -TREATED <br />WOOD. GONTAGT LUMBER $ HARDWARE SUPPLIERS TO GOORD. <br />• CONCRETE OES16N BASED ON AGI 318. CONCRETE SHALL ATTAIN <br />THE FOLLOWIN6 MINIMUM GOMPRE551VE 5TREN6TH5 IN 28 DAYS, <br />U.N.O.: <br />f'G = 2,500 p5i:....... FOOTIN65 <br />2,500 psi:....... 5LAB5 ON 6RADE (INTERIOR $ EXTERIOR) <br />fy = 60,000 psi ...... REBAR <br />• ALL CONCRETE EXPOSED TO THE WEATHER SHALL NOT HAVE LE55 <br />THAN 5% OR MORE THAN 1% AIR ENTRAINMENT. <br />• ALL FOOTIN65 SHALL BEAR AT LEAST 12" BELOW FIN15H 6RADE. <br />• FOOTIN65 AND 5LAB5 ON 6RADE SHALL BEAR ON GLEAN, FIRM <br />VIR61N 501L OR GLEAN FILL COMPACTED TO A q5% PROCTOR VALUE <br />• MINIMUM LAP SPLICES ON ALL REINFORGEMENT SHALL BE 48 BAR <br />DIA. <br />• HOOKS SHALL BE PROVIDED AT DISCONTINUOUS END OF REINF. <br />• GROUT SHALL BE A5TM G416 F'G=3000 P51 w/ MAX 3/8" A66RELATE <br />• CONCRETE MA50NRY UNITS SHALL BE A5TM GqO WITH A MINIMUM <br />GOMPRE551VE STRENGTH OF HOO P51 (F'M = 1500 P51). ALL <br />MORTAR SHALL BE A5TM G210, TYPE 5. GMU DE516N BASED ON <br />AG 1 530/530.1 <br />•ElREINFORCED GMU GORES (A5 INDIGATED ON PLAN) SHALL <br />BE REINFORCED w/ (1) #5 BAR VERTICAL. BAR SHALL <br />EXTEND INTO BOND BEAM AT TOP WALL AND SHALL <br />ALIGN WITH FOOTING DOWEL BELOW. PROVIDE MIN 30" <br />LAP SPLICE WITH FOOTING DOWEL. <br />• GROUT 50LID ALL REINFORCED GMU CELLS AND BOND BEAMS <br />• ALL BOND BEAMS ARE TO BE 8" GONT. FULL LEN6TH OF WALL w/ <br />(1) #5 BAR CONT. (TYP. @ EXT. PERIMETER) <br />• PROVIDE (1) #5 BAR GROUTED SOLID ON EACH 51DE OF ALL <br />MASONRY OPENINC75 AND AT ALL WALL CORNERS. <br />• VERTICAL REINFORCEMENT SHALL BE HELD IN PLACE AT THE TOP <br />AND BOTTOM, SHALL BE LOCATED IN THE CENTER OF THE MA50NRY <br />CELL, AND SHALL BE LOCATED AT A MAXIMUM OF 8'-0" O.G. IN <br />EXTERIOR HALLS. (A5 SHOWN ON PLANS) <br />• ROU6H OPENIN65 ARE GALLED OUT ON PLAN - <br />BUILDER TO VERIFY. <br />• PROVIDE CONTROL JOINTS AT ALL IN51DE CORNERS OF SLAB <br />E06E5, AND OTHER LOGATION5 WHERE SLAB GRAGK5 ARE LIKELY <br />TO DEVELOP. EXACT LOGATION5 PER BUILDER. <br />• SAW GUT OR TOOLED JOINT DEPTH SHALL BE Y4 OF THE DEPTH <br />OF THE SLAB (I" FOR A 4" SLAB) <br />• JOINTS SHALL BE LOCATED ® 12-0" O.G. (RECOMMENDED) OR <br />15-0" O.G. (MAXIMUM) <br />• JOINT GRID PATTERN SHALL BE A5 GL05E TO 5GUARE5 A5 <br />POSSIBLE (I:I RATIO), WITH A MAXIMUM OF 1:1.5 RATIO <br />CONNECTION SPECIFICATIONS (TYP. U.N.O.) <br />DESCRIPTION OF BLD6. ELEMENT <br />3"xO.131" NAILS <br />3"x0.120" NAILS <br />JOIST TO SOLE PLATE <br />(3) TOENAILS <br />(3) TOENAIL5* <br />SOLE PLATE TO J0I5T/BLK'6. <br />(5) NAILS @ 4" o.G. <br />(3) NAILS ® 4" o.G. <br />STUD TO SOLE PLATE <br />2) TOENAILS <br />(5) TOENAILS* <br />TOP OR 50LE PLATE TO STUD <br />2 NAILS <br />(3) NAILS <br />RIM TO TOP PLATE <br />TOENAILS ® 8" o.c. <br />TOENAILS 0 6" o.G.* <br />BLK'6. BTWN. JOISTS TO TOP PL. <br />(3) TOENAILS <br />(3) TOENAILS* <br />DOUBLE STUD <br />NAILS @ 24" o.G. <br />NAILS 0 16" o.G. <br />DOUBLE TOP PLATE <br />NAILS 0 24" o.G. <br />NAILS ® 16" o.G. <br />DOUBLE TOP PLATE LAP SPLICE <br />q NAILS IN LAPPED AREA <br />II NAILS IN LAPPED AREA <br />TOP PLATE LAP @ CORNERS 4 <br />INTER5EGTIN6 HALLS <br />(2) NAILS <br />(2) NAILS <br />* 2Y2"xO.113 15 AN AGGEPTABLE ALTERNATIVE TO A 3"x0.120", SAME SPAGIN6 OR NUMBER OF <br />NAILS. (ONLY AGGEPTABLE WHERE * ARE SHOWN) <br />THIS MODEL HAS BEEN DES16NED IN <br />AGGORDANGE WITH THE 7th EDITION (2020) <br />FLORIDA BUILDIN6 GODS (5EGT1 ON 160q) <br />LATERAL DE516N REOU I REMENT5 FOR THE <br />FOLLOWIN6 WIND SPEED $ EXPOSURE ONLY: <br />140 MPH - EXP. B <br />HIND I MPORTANGE FAGTOR = 1.0 <br />INTERNAL PRESSURE GOEFF I G I ENT = <br />ENGLOSED/ +/- 0.18 <br />ANY WIND 5PEED/EXP05URE NOT L15TED HERE <br />REQUIRES FORMAL EVALUATION � APPROVAL <br />FROM M+K STRUCTURAL EN6INEERIN6. <br />EXTERIOR $ SHEAR WALL <br />SHEATH I N6 SPECIFICATIONS <br />INDICATES LOCATION AND EXTENT OF <br />5HEARWALL WHIGH REGUIRE5 5HEATHIN6 AND/ OR <br />FA5TENIN6 SPECIFICATIONS BEYOND THAT OF <br />STNDRD GON5TRUGTION <br />SYMBOL SHEAR PANEL SPEG. <br />15/32" PLYWOOD OR OSB FASTENED w/ <br />PI 2y2"xO.131" NAILS ® 6" o.G. ALONG PANEL <br />EDLE5 AND 12" o.G. IN THE PANEL FIELD. <br />15/52" PLYWOOD OR OSB FASTENED w/ <br />P3 2)12 x0.131 NAILS @ 3 o.G. ALON6 PANEL <br />ED6E5 AND 12" o.G. IN THE PANEL FIELD. <br />STANDARD EXTERIOR WALL 5HEATHIN6 REQUIREMENTS: <br />SHEATHE ALL EXTERIOR WOOD FRAMED HALLS w/ 15/32" <br />PLYWOOD OR 055 FASTENED w/ 2Y2"x0.131" NAILS @ 6" O.G. AT <br />ALL PANEL E06E5 AND @ 12" O.C. AT CENTER. (U.N.O. ON PLANS) <br />I. ALL PANEL E06E5 SHALL OCCUR OVER FRAMIN6 OR 2X <br />BLOGKIN6 SHALL BE PROVIDED TO SUPPORT PANEL E06E <br />AND FA5TENINS <br />2. ALL STRUCTURAL PANELS ARE TO BE DIRECTLY APPLIED TO <br />STUD FRAMIN6 @ 16"o.G. MAX. U.N.O. ON PLAN. <br />3. ALL 5HEARWALL5 SHALL HAVE DOUBLE TOP PLATES <br />FASTENED T06ETHER w/ 3Y2"x0.131" NAILS @ I6"o.c. USE (8) <br />3Y2"xO.131" NAILS @ EA. LAP SPLICE. (TYP. U.N.0) <br />4. LATERAL ANALY515 ASSUMES ALL INTERIOR 5HEARWALL5 <br />AND EXTERIOR WALLS ARE CONTINUOUS SHEATHED ABOVE <br />AND BELOW OPENIN65. <br />5. SEE ARCHITECTURAL DRAWIN65 FOR ADO'L WALL <br />GON5TRUGTION REQUIREMENT5. <br />6. ALL EXTERIOR HALLS ARE CONSIDERED 5HEARWALL5. <br />1. WHERE PANELS ARE APPLIED TO BOTH FACES OF WALL, <br />PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT <br />FRAMIN6 MEMBERS. <br />8. A MAXIMUM OF TWO 1'-4" WIDE X 2'-0" TALL OPENINGS ARE <br />PERMITTED TO BE GUT INTO INTERIOR 5HEARWALL5 50 <br />LONG A5 THEY ARE FRAMED OUT TO PROVIDE THE <br />5HEATHIN6 E06E NAILING REQUIRED AND OCCUR 16" MINIMUM <br />FROM THE ENDS OF THE 5HEARWALL. <br />q. ALL SHEATHING PANELS TO MEET U.S. PRODUCT STANDARD <br />P51 OR P52, OR APA PRP-I08 WITH 33(6 SPAN RATING (MAX) <br />10. NOTE: IF FIRE -RATED DETAILS ARE REQUIRED BY THE <br />ARCHITECTURAL PLANS, THE 5HEATHIN6 USED IN THE -FIRE <br />RATED A55EMBLIE5 SHALL BE NOMINAL 51 " THICK, APA <br />RATED 5HEATHIN6 23( EXP05URE 1 05B OR PLYWOOD PEf <br />ACCORDANCE WITH THE UL OE516N5 SPECIFIED. <br />Window $ Door Allowable Wind Pre55ure5 <br />140 MPH Wind Zone Ex o5ure B®® <br />OPENING 51ZE <br />INTERIOR ZONES <br />END ZONES <br />8' Garage Door <br />+18.5 P5F/-20.q P5F <br />+18.5 P5F/-20.q P5F <br />16 Garage Door <br />+I1.1 PSF/-Iq.1 P5F <br />+I1.1 P5F/-Iq.1 P5F <br />10 SOFT. <br />+21.2 P5F/-22.q P5F <br />+21.4 P5F/-28.3 P5F <br />20 SOFT. <br />+20.2 P5F/-22.0 P5F <br />+20.2 P5F/-26.4 P5F <br />50 SOFT. <br />+Iq.O P5F/-20.8 P5F <br />+Iq.O P5F/-23.q P5F <br />100 SOFT. <br />+18.0 P5F/-Iq.B P5F <br />+18.0 P5F/-22.0 P5F <br />500 SOFT. <br />+15.8 P5F/-11.6 P5F <br />+15.8 P5F/-I1.6 P5F <br />(DEnd Zone is defined as the smaller of 10% of least horiz. dim. or 40% <br />of mean roof height, <br />®Pressures have been derived from 2020 FBG Table R301.2(2). <br />®Pressures charted here are allowable pressures and have been <br />reduced per A5GE 1-16 section 2.4.1 from ultimate pressures. Divide <br />allowable pre55ure5 above by a factor of 0.6 for ult. pressures. <br />ROOF FRAMIN6 <br />• SEE ROOF TRU55 UPLIFT CONNEGTOR 5GHEOULE FOR ALL ROOF <br />TRU55 CONNECTORS. <br />• ROOF 5HEATHIN6 SHALL BE 1/16" MIN. 05B/PLYWOOD 5HEATHIN6 24/b <br />EXP05URE I. FASTEN 5HEATHIN6 TO ROOF MEMBERS w/ 2 3/8" x0.113" <br />RING SHANK NAILS (R5R5-01 OR EQUIV.) 0 6" O.G. AT PANEL E06E5 $ <br />® 6" O.G. IN FIELD. FASTEN 5HEATHIN6 TO 6ABLE END 4 DRAG <br />TRU55E5 w/ RIN6 SHANK NAILS ® 3" O.G. (U.N.0). PROVIDE BLOGKIN6 <br />ALONG PANEL ED6E5 AT FIRST 2 TRU55 BAYS FROM GABLE END. <br />PROVIDE "H" STYLE CLIPS ALON6 UNSUPPORTED EDLE5. <br />• ROOF 5HEATHIN6 FOR MAIN ROOF TRUSSES SHALL EXTEND <br />GONTINUOU5LY UNDER ALL OVERFRAMIN6. <br />• TRU55 ALL VALLEY SETS. FASTEN EACH TO TRU55 BELOW w/ <br />51MP50N VTGR CLIPS ® 24" O.G. <br />• ALL METAL HAN6ER5 SHALL BE SPECIFIED BY THE TRUSS <br />MANUFACTURER, UNLE55 OTHERWISE NOTED. <br />• ERECT AND INSTALL ROOF TRUSSES PER WTGA 4 TPI'5 BG51 I <br />GUIDE TO LOOD PRAGTIGE FOR HANDLIN6, IN5TALLIN6 $ BRAGIN6 <br />OF METAL PLATE CONNECTED WOOD TRUSSES.` <br />• ROOF TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH 4 EN6. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• SUPPORT PORCH $ SHORT SPAN ROOF TRUSSES w/ 2x4 LED6ER <br />FASTENED TO FRAMING w/(2) 3"x0.131" NAILS @ 16" O.G. <br />UPLIFT CONNECTORS <br />BEARIN6 GONOITION <br />TRU55 <br />CONNECTOR <br />LEN6TH <br />< 15' <br />51MP50N H2.5T <br />51NLLE ROOF TRU55 BEARIN6 ON <br />> 15' <br />51MP50N HIOA <br />WOOD STUD WALL/WOOD BEAM <br />ROOF 61RDER TRUSS BEARIN6 ON <br />WOOD STUD WALL/WOOD BEAM <br />ALL <br />SIMPSON HT520 <br />51NLLE ROOF TRUSS OR PORCH <br />ALL <br />51MP50N HETAI6 <br />BEAM BEARING ON GMU WALL <br />ROOF 6.T., FLUSH BEAM OR <br />FLUSH 6.T. BR6. ON GMU WALL <br />ALL <br />(2) SIMP50N HETA16 <br />ALL BEARING POINTS OF EACH ROOF TRU55 SHALL BE CONNECTED <br />WITH CONNECTOR AS LISTED ABOVE. <br />IT 15 THE RESPONSIBILITY OF THE ENGINEER OF REGORD TO OE516N <br />THE UPLIFT CONNECTORS PER SECTION 2.2 OF AN51/TPI-2014 <br />"NATIONAL DE51ON STANDARDS FOR METAL PLATE CONNECTED WOOD <br />TRUSS CONSTRUCTION". MiK HAS ENLINEERED ALL ROOF TRUSS UPLIFT <br />GONNEGTOR5 IN AGGORDANGE WITH THE REQUIREMENTS OF A5GE-1-16. <br />ALL UPLIFT CONNECTORS AND LOADS PER THI5 DRAWING SHALL <br />SUPERSEDE THE TRU55 MANUFAGTURER'5 UPLIFT CONNECTOR <br />5PEGIFIGATION5 AND LOADS SHOWN ON THE SHOP CARDS. <br />LEGEND <br />• ® INTERIOR BEARIN6 WALL <br />• _ _ _ = BEARIN6 WALL ABOVE <br />• BEAM / HEADER <br />• LOCATION AND EXTENT OF 5HEARWALL <br />I: • : : I EXTENT OF OVERFRAMIN6 <br />•,­..- n,.w INDICATES I/8"A" SAW GUT CONTROL JOINT <br />.M INDICATES LOCATION OF REINFORCED GMU GORE <br />(SEE NOTES) <br />J L METAL HANGER <br />INDICATES POST ABOVE. PROVIDE SOLID <br />BLOCKING UNDER POST OR JAMB ABOVE. <br />HOLDOAN / STRAP SCHEDULE <br />SYMBOL <br />SPEG I F I GATI ON <br />FASTEN BUILT-UP POSTS 5UPPORTIN6 ROOF 6.T. TO <br />GMU WALL w/ (1) 51MP50N M5TGM40 STRAP w/ (12) Y4" <br />5T-1 DIA x P4" LON6 TAPGON5 INTO GMU. DE516N ACCOUNTS <br />FOR REDUGED STRAP GAP. FOR SHORTER TAPGON5. <br />(USE ONE STRAP TOTAL PER BUILT-UP POST, U.N.O.) <br />GENERAL STRUCTURAL NOTES <br />• DE516N 15 BASED ON lth EDITION (2020) FLORIDA BUILDIN6 CODE. <br />• WOOD FRAME EN6INEERIN6 15 BASED ON NOS, "NATIONAL DE516N <br />5PEGIFIGATION FOR WOOD CONSTRUCTION" - LATEST EDITION. <br />• DE516N LOADS: <br />ROOF LIVE = 20 P5F <br />DEAD = 1 P5F T.G., 10 P5F B.G. <br />LOAD DURATION FACTOR = 1.25 <br />FLOOR LIVE = 40 P51F (INGLUDIN6 STAIRS 4 DEGK5) <br />= 30 P5F @ 5LEEPIN6 AREAS <br />= 50 P5F @ 6ARA6E <br />= 200 # POINT LOAD @ LUARD5/HANDRAIL5 <br />= 50 P5F ® GUARD IN -FILL COMPONENTS <br />DEAD = 10 P5F (20 P5F TOTAL @ TILE) <br />WIND ULTIMATE WIND SPEED 4 EXPOSURE AS L15TED <br />R15K GATEC70RY II <br />6ENERAL FRAMIN6 <br />• EXTERIOR WOOD STUD BEARIN6 WALLS SHALL BE 2x 5PF#2 OR <br />5YP#2 ® 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• INTERIOR WOOD STUD BEARIN6 WALLS SHALL BE 2x 5PF OR 5YP <br />'5TUO' 6RADE LUMBER @ 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• ALL INTERIOR 5HEARWALL5 SHALL BE CONSTRUCTED WITH 2x <br />'STUD' 6RADE MEMBERS SPACED ® 16" O.G. (MAX.). <br />• ALL NON-BEARIN6 INTERIOR STUD WALL5 SHALL BE CONSTRUCTED <br />WITH 2x 'STUD' 6RADE MEMBERS SPACED ® 24" O.G. (MAX.). <br />• ALL HEADERS SHALL BE SUPPORTED BY (1)2x JACK STUD d (1)2x <br />KING STUD, MINIMUM. <br />- THE NUMBER OF 5TUD5 SPECIFIED AT A SUPPORT INDICATES THE <br />NUMBER OF JACK STUDS REQUIRED, U.N.O.. <br />• ALL HEADERS, BEAM5 $ OTHER 5TRUGTURAL MEMBERS SHALL BE <br />5PRUGE-PINE-FIR #2 (5PF) OR SOUTHERN PINE #2 (5YP) LUMBER, OR <br />BETTER (KILN -DRIED). <br />• FAGE NAIL MULTI -PLY 2x BEAMS $ HEADERS W/ 3-ROW5 OF 3"xO.131' <br />NAILS ® 12" O.G. 5TA66ERED. APPLY NAILING FROM BOTH FAGE5 <br />3-PLY OR MORE CONDITIONS. UTILIZE 2 ROW5 OF NAILS FOR 2x6 4 <br />2x8 MEMBERS. <br />• FACE NAIL BUILT UP 2x POSTS W/ 3"xO.131" NAILS ® 16" O.G. <br />5TA66ERED. APPLY NAILING FROM BOTH FACES ® 3-PLY OR <br />MORE CONDITIONS. <br />• REFER TO CONNECTION SPECIFICATIONS TABLE FOR ALL <br />6ONNEGTION5 (TYP. U.N.O. ON PLANS). <br />• SHEATH ALL WOOD FRAMED EXTERIOR HALLS w/ 1/16" 055 <br />FASTENED w/ 2Y2"x0.131" NAILS @ 6" O.G. @ EDLE5 � 12" O.G. <br />CENTER FIELD. PROVIDE HORIZONTAL 2x BLOGKIN6 AT ALL <br />UNSUPPORTED PANEL E06E5. TYPICAL U.N.O. ON THE PLANS. <br />• PROVIDE SOLID BLOGKIN6 IN FLOOR SYSTEM UNDER ALL POSTS <br />CONTINUOUS TO FOUNDATION/BEARINS. <br />• ENGINEERED LUMBER TO MEET OR EXCEED THE FOLLOWING: <br />• L5L - Fb=2325 psi; Fv=310 psi; E=1.55AO' b psi <br />• LVL - Fb=2600 psi; Fv=285 psi; E=2.Ox10" 6 psi <br />• FOR 2 4 3 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES T06ETHER <br />WITH 3 ROW5 OF 3"xO.131" NAILS ® 8" OIG OR 2 ROW5Y4"x3Y2" <br />51MP50N 505 5GREW5 (OR 3Y2" TRU55LOK 5GREW5) 0 16" OIG. USE <br />A MINIMUM OF 3 ROWS FOR BEAM DEPTHS OF 14" OR GREATER. <br />APPLY FA5TENIN6 AT BOTH FACES FOR 3-PLY CONDITION. LOCATE <br />TOP 4 BOTTOM NAIL5/5GREW5 2" FROM ED6E. 5OLID 3Y2" OR 5Y4" <br />BEAMS ARE AGGEPTABLE. USE 2 ROWS OF NAILS FOR 2x6 ff 2x8 <br />MEMBERS. <br />• FOR 4 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES TO6ETHER <br />WITH 3 ROWS OFY4"xb" 51MP50N 505 5GREW5 (OR 6 3/4" TRU55LOK <br />5GREW5) ® 16" OIG. USE A MINIMUM OF 4 ROWS FOR BEAM DEPTHS <br />OF 14" OR GREATER. APPLY FA5TENIN6 AT BOTH FAGE5 (ONE 51DE <br />ONLY FOR TRU55LOK 5GREW5). LOCATE TOP AND BOTTOM 5GREW5 <br />2" FROM E06E. A SOLID 1" BEAM 15 AGGEPTABLE. <br />• ALL INTERIOR WALL STUDS IN CONTACT w/ GMU WALLS SHALL BE <br />PRESERVATIVE TREATED AND FASTENED w/ Y4" DIA. X 4" LON6 <br />TAPGON5 0 24" O.G. <br />FLOOR FRAMIN6 <br />• I-JOI5T5/TRU55E5 SHALL BE DE516NED BY MANUF. TO MEET OR <br />EXCEED L/480 LIVE LOAD DEFLECTION CRITERIA. <br />• ALL METAL HANGERS SHALL BE SPECIFIED BY I -JOIST /TRU55 <br />MANUFACTURER, UNLE55 OTHERWISE NOTED. <br />• I-JOI5T/TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH. i EN6. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• FLOOR 5HEATHIN6 SHALL BE 25132" GONFORMIN6 TO P52-04, <br />24" O.G., EXP05URE I, TON6UE AND GROOVE E06E5, FASTEN <br />5HEATHIN6 TO FRAMIN6 MEMBERS W/ 6LUE AND 3"0.131" NAILS <br />6" O.G. AT PANEL E06E5 $ 12" O.G. AT INTERMEDIATE SUPPORTS. <br />TYPICAL 5TAIR GON5TRUCTION NOTES <br />• (3) 51N6LE PLY 2x12 5TRIN6ER5 FASTENED TO HEADER AT TOP OR <br />LANOIN6, WHERE APPLICABLE, AND 2x6 P.T. PLATE AT BOTTOM w/ <br />(1) 5IMP50N A35 CLIP AT EACH 5TRIN6ER. <br />• FASTEN 2x6 P.T. PLATE TO CONCRETE SLAB wl (3) 3/b" DIA. x 3 Y2" <br />LON6 TAPGON5. <br />• FASTEN END 5TRIN6ER5 TO ADJACENT HALLS w/ (2) 3"xO.131" NAILS <br />AT EACH STUD, WHERE APPLICABLE. <br />• PROVIDE %" FLOOR DEGKIN6 ON RISERS AND I" FLOOR DEGKIN6 <br />ON TREADS. <br />• SEE STAIR FRAMIN6 SECTION FOR MORE INFO. <br />seal: ` 111111110/ <br />� 5 G. PR'°/f��i <br />k No 77824 <br />e <br />r 1 ' TATE OF <br />®�0 <br />jd�t�°� ORIOi'-®ems <br />Ocop <br />yr�AIM11��\ <br />�jineerIng, Inc. <br />=z z <br />JLU <br />W <br />W <br />z <br />z <br />CM <br />J <br />a <br />Z <br />WW <br />M _J <br />oc <br />Jz <br />W <br />C <br />y <br />M W <br />CC <br />0 <br />Cl- <br />9 <br />Z <br />a� <br />C: <br />c E <br />a, <br />m E <br />< I- <br />�CD <br />Y <br />m �h <br />o N <br />M CL <br />M&K project number: <br />068-200 1 1 <br />project mgr: <br />drawn by: <br />issue date: <br />JSB <br />BC <br />05-19-21 <br />REVISIONS: <br />date: initial: <br />sheet: <br />a <br />Z <br />J <br />0 <br />0 <br />J <br />d <br />w <br />2 <br />Ld <br />SM0.0 <br />'Q <br />Q <br />0 <br />LL <br />