Laserfiche WebLink
LEGEND <br />seal: ,� <br />%� <br />• ® INTERIOR BEARING WALL <br />e * <br />• _ _ _ _ BEARING WALL ABOVE <br />-- ��q , <br />:', ST%�TE fit` ,• %td <br />'� "a <br />5'-4" 4'-6" 5'-q" 5'-q" <br />" 6'-2" 3'-2" 4'-6" 4'-2 ° <br />. BEAM / HEADER <br />.✓ <br />s <br />�'�� ; °,�tOWO -' �'� Z\ <br />MB_I <br />p <br />LOCATION AND EXTENT OF 5HEARWALL <br />14 At <br />©copyright1(li <br />Structural engineering, Inc <br />EXTENT OF OVERFRAMIN6 <br />C0 <br />�o <br />•� INDICATES I/8"xl" SAW GUT CONTROL JOINT <br />Z <br />°U <br />w <br />Z <br />INDICATES LOCATION OF REINFORCED GMU GORE <br />ED <br />a <br />� rn <br />(SEE NOTES) <br />z a <br />LU <br />MB I MB I <br />J L METAL HANGER <br />L <br />+ <br />❑• ❑• ❑• ❑• ❑• <br />QCD <br />INDIGATE5 P05T ABOVE. PROVIDE 50LID <br />_ ¢ Eo <br />BLOGKIN6 UNDER POST OR JAMB ABOVE <br />a <br />MASONRY LINTEL DETA I L5 <br />W C <br />REINFORCEMENT <br />m� <br />= a E <br />MARK DE516NATION TOP BOTTOM SHEAR REINFORCEMENT <br />Q <br />I---oo <br />• <br />❑ <br />Q <br />MB-I SF8-06/OT ----- ----- <br />0 <br />z V <br />p o <br />MB-2 8F8-IB/OT ----- (I) #5 <br />C <br />CA u M 6 <br />O <br />MB-5 896-I15/IT (I) #5 (I) #5 <br />LL C N <br />M +z <br />O <br />MB-4 6RFI4-15 ----- ----- <br />APPROVED LINTEL MANUFACTURERS ARE: CAST-GRETE, QUALITY PRECAST GO., <br />7 <br />AND LOTT'S GONGRETE. <br />NOTES: <br />IV <br />• <br />0 <br />I. ALL LINTELS W 5PAN5 GREATER THAN 14-0 SHALL BE PRE5TRE55ED. <br />2. 5HORE FILLED LINTEL5 A5 REQURIED. <br />M&K project number; <br />_ <br />5. ALL LINTEL5 5HALL HAVE 4" MINIMUM BEARING U.N.O. <br />- <br />76 <br />4. DO NOT GUT OR MODIFY PRE5TRE55ED LINTEL5. <br />i <br />5. ALL REINFORGEMENT 5HALL BE GRADE 60, fy=60 k51 <br />068-200 <br />6. ALL LINTELS 5PEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DE516N. <br />project mgr: J S B <br />7. ALL LINTEL5 ARE TO BE LOGATED DIREGTLY ABOVE THE OPENING BELOW <br />drawn b MJT <br />MASONRY LINTEL A55EMBL I ES <br />issue date: M <br />O 2 21 <br />N <br />N <br />5EE SCHEDULE AND 5PEGIFIGATION5 FOR ADD'L INFO <br />REVISIONS: <br />fn <br />rf--h rr'--Ti <br />MIN. (1) COUR5Ere010 '�— MIN. O) COURSF,/WND <br />L4J i BEAM ABOVE LINTEL i L4 J <br />i BEAM ABOVE LINTEL <br />date: initial: <br />0 <br />BOTTOM REINF. <br />w ... ' <br />PRECAST LINTEL w/ I PREGA5T LINTEL W <br />, <br />ET 1$EDDED REINF. �I EMBEDDED REINF. <br />_ <br />cn c� <br />MB-1 MB-2 <br />�j <br />r <br />m <br />• <br />_21 <br />�j <br />rr--�i <br />I i TOP GOW—AE, IF <br />, IF L4J <br />m i L4J}i— TOP COURSEEQ <br />REQV ARGH. �___-' RD PER ARCH. <br />PER <br />CONT. BOND BEAM <br />TOP REINF. OR GONT. REIN. A5 REQD <br />BOND BEAM REINF. Z <br />GROIJr <br />6ROVr BOTTOM REINF. <br />^ ` <br />• <br />❑ <br />O <br />BOTTOM REINF. ... <br />-'� PRECAST LINTEL w/ <br />nl <br />� <br />1 a■ 1 PRECAST LINTEL w/� EMBEDDED REINF. <br />i-��i- EMBEDDED REINF. <br />�y <br />'�I <br />MB-3 MB-4 <br />a <br />REFER TO 5-0.0 FOR T'rPIGAL <br />5TRUGTURAL NOTES SCHEDULES <br />m <br />0 <br />O <br />rn <br />I <br />d <br />0 <br />SIN <br />R <br />31-0 <br />MB-1 <br />w <br />= <br />I <br />Q <br />r <br />❑• _I <br />� m <br />z <br />to <br />m <br />MB-I <br />_ 0 0 _ <br />- - <br />O <br />.-.� CAI U? <br />MB-3 -I MB- I <br />H <br />z <br />RIME[ <br />.. <br />a 0 <br />� <br />16'-oil 2'-4" 5'-6" 3'-2" 5'-4" <br />sheet: <br />5L®GK FLAN <br />20'-8" 5'-411 141_011v <br />I <br />SCALE: I/4'*'-0" (2244 SHEET) <br />40'-0" <br />SCALE: 1/6"=1'-0" (I10 SHEET) <br />Fo42.0 <br />