Laserfiche WebLink
ROOF <br />COMMUNITti <br />4" cc <br />RIGHT ELEVATION <br />SCALE: 1/4"=1'-0" <br />LEFT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />a::^:�fi�;.•:ti•'L�:'u' <br />FINISH <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />x <br />W <br />Wz0= <br />o} H <br />>Iao <br />wpp1-- <br />a�UJW <br />=o�c>a <br />CL T-� <br />off <br />Z � W <br />z <br />W Q CL <br />2 � <br />_ <br />�U) 0Q <br />= Z LL U) <br />�F-Qzp <br />n <br />N <br />cor- <br />n <br />O � <br />Q <br />Q <br />0 <br />r� <br />V <br />U) <br />0 <br />Z <br />av <br />0 <br />� <br />w <br />o <br />� <br />I <br />w <br />w <br />w <br />Pon" <br />a <br />U) <br />m< <br />cn <br />w <br />0 <br />3: <br />O_ <br />N <br />W <br />U) <br />O� <br />� <br />o <br />Z <br />aaa< <br />i <br />I <br />I <br />I <br />COMMUNITY; <br />LINKS AT CALUSA <br />SPRINGS <br />PLAN # 6103 <br />RELEASED: 02/04/21 <br />SHEET i <br />A2.2 <br />tFr - - --i..".lr'i. iJ ��Ldi1.Pl, �.,. An .ti A"! .,,i T- 1 1 1 <br />