My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6872 Shelby Lynn Way
Zephyrhills
>
Building Department
>
Building Plans
>
6872 Shelby Lynn Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 1:07:19 PM
Creation date
2/19/2025 9:43:40 AM
Metadata
Fields
Template:
Building Plans
Street #
6872
Location
Shelby Lynn Way
Contractor
K Hovnanian Co LLC
Building Plans - Permit #
1081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br />FILLED CELLS <br />(5EE PLAN) i <br />4: GARAGE <br />TOP VIEW <br />CORNER <br />F —1 <br />GONG. OR PAVER 6ARA6E WALL <br />DRIVEWAY j— BEYOND <br />m l �4` L (5EE PLAN) <br />16"x8" THICKENED—=1 I I—III=1 I—III=1—I 1=1 1- <br />E06E W/ (2) #5 —III=1 1=111=1 11=1 11=111= <br />GONT. <br />THICKENED EDGE @ GARAGE DOOR DETAIL <br />SCALE: MS <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6.— <br />TO BOND BEAM. LAP W/ <br />FOUNDATION DOWEL <br />MIN. 30" GROUT CELL <br />SOLID <br />z� <br />(z GRADE <br />o z III_I\3 <br />II1I <br />�_i <br />8" WIDE GONT. <br />GONG. GURB <br />GARAGE 5LA5 <br />F(5EE PLAN) <br />111-111— <br />III—III—III <br />° a° •° I I I I I IiI IT_ITi I I I liI <br />L 111-11 — 111=t+== 1) #5 DOWEL W/ 6" HOOK AT <br />_ 11—° 11=1I11=1 ALL VERT. WALL REINF. <br />(5EE PLANS FOR LOCATION) <br />11—III—III=11_I—I - <br />CLEAN COMPACTED <br />FILL- ® q5% 1'-0" MONOLITHIC FOUNDATION <br />STANDARD DENSITY I <br />MIN W/ (2) #5 GONT. ON GHAIR5 <br />WHERE 21ND STORY WALL <br />OCCURS DIRECTLY ABOVE THE <br />8" GMU WALL 5HOWN, FT6.5HALL <br />BE 1'-4" WIDE W/ (2) #5 13AR5 <br />&LA�t6E CURS DETAIL <br />8" GMU BLOCK <br />BEYOND R4.1 FI-FOIL OR EQUAL <br />EXTERIOR DOOR OVER 3/4" FURR 5TRIP5 <br />-PER BUILDER <br />MTL. THRESHOLD <br />SET IN SEALANT HOUSE 5LAB <br />(5EE PLAN) <br />PORGH/PATIO/LANAI <br />5LAB OR PAVERS <br />(5EE PLANS) <br />d ° a e <br />PER MANU. <br />° I_1=1 I I —III— 11=1 I <br />=110 I=d 1=1I I III=1I I —III —III_ <br />'—I_I 1=1 � I I 1=1 I• 11=1 i 1=1 11=1 I I- <br />' —I <br />y <br />III —III- <br />III I I III —III —III III— ' <br />II-III=III=III=Ill=�''- MONOLITHIC <br />GLEAN COMPACTED =III= I FOUNDATION W/ (2) #5 <br />FILL A q5% 5TANDARD 1'-0" GONT. ON GHAIR5 <br />DENSITY AND TERMITE MIN. <br />TREATED <br />WHERE 2ND STORY WALL <br />OGGURS DIRECTLY ABOVE THE <br />8" CMU WALL 5HOWN, FT6. 5HALL <br />BE 1'-4" WIDE W (2) #5 BAR5 <br />EXTERIOR OUT5AIN6 $ 56D POURED SILLS DETAIL <br />6" GMU BLOCK <br />(1) #5 VERT. FROM FTC. TO <br />BOND BEAM. LAP W <br />FOUNDATION DOWEL MIN. <br />30" GROUT CELL 50LID <br />R4.1 FI-FOIL OR EQUAL <br />OVER %4" FURR 5TRIP5 <br />-PER BUILDER <br />HOUSE 5LAB <br />(5EE PLAN) <br />G d ° e <br />° III-1 1=1 I 1=1 I —I <br />Cz 6RADF ° ° I1=1II—I1=1I1=1 <br />m ' =1 I I=1 11= d l III •� :° I I —III —III —I 11—' ' <br />—I I m 111 1114 e =1 � 1= <br />III— III 1) #5 DOWEL W/ 6" HOOK AT <br />ALL VERT. WALL REINF. <br />(5EE PLANS FOR LOCATION) <br />GLEAN COMPACTED <br />=III 1 <br />FILL A q5% MONOLITHIC FOUNDATION <br />5TANDARD DENSITY MI N. W/ (2) #5 GONT. ON GHAIR5 <br />MIN. <br />WHERE 2ND STORY WALL <br />OGGUR5 DIRECTLY ABOVE THE <br />8" GMU WALL 5HOWN, F176. 5HALL <br />BE 1'4' WIDE W (2) #5 BAR5 <br />POOTI NG SECTION W/ SLOCK DETA 1 L <br />SCALE: NTS <br />8 GMU BLOCK R4.1 FI-FOIL OR EQUAL <br />BEYOND OVER %" FURR 5TRIP5 <br />EXTERIOR DOOR -PER BUILDER <br />MTL. THRESHOLD HOU5E 5LA13 <br />5ET IN SEALANT T <br />(5EE PLAN) <br />PAVERS <br />(5EE PLANS) ° <br />° • e G ° G <br />° III-111-111—III= <br />° � II1=1II—III—III; II' <br />'=1I1=1I1=� 1=1I I ° I I1=1_I1=1I1=1I1- ' <br />III —I III=11 • II—III—III=111- <br />'—I11=111- <br />=1 m III I I —I I M I I_ <br />I-1 I III-1 11- <br />"— MONOLITHIC <br />'- <br />GLEAN COMPACTED /" = 1= FOUNDATION W/ (2) #5 <br />FILL A q5% 5TANDARD 1'-0 <br />" GONT. ON GHAIR5 <br />DENSITY AND TERMITE MIN. <br />TREATED <br />WHERE 2ND 5TORY WALL <br />OGGUR5 DIRECTLY ABOVE THE <br />8" GMU WALL 5HOWN, FT6. 5HALL <br />BE 1'-4" WIDE w/ (2) #5 BAR5 <br />DOOR DETAIL <br />0EIT%*1 <br />PATI O/PORGH/LANAI 5LAB <br />(5EE PLAN) <br />8"x8" THICKENED — <br />5LAB W/ (1) #5 CONT. <br />&THICKENED EDGE DETAIL <br />CALE: w,,s <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FTG. TO R4.1 FI-FOIL OR EQUAL <br />BOND BEAM. LAP W OVER 3/4" FURR 5TRIP5 <br />FOUNDATION DOWEL MIN. -PER BUILDER <br />30" 6ROUT CELL SOLID HOU5E SLAB <br />PORGH/PATIO/LANAI (5EE PLAN) <br />5LAB OR PAVERS <br />(5EE PLAN) <br />z C ° d <br />° g ° ° � I-111-111—III-111 <br />_ I—III—III-111—� 11- <br />E.W J01NT -L4_ 73' —11 a III —III —I I <br />m11l11III a° ° IMI1I11111I11 ' <br />° I = 1) #5 DOWEL W/ 6" HOOK AT <br />III=III= ALL VERT. WALL REINF. <br />III=1 1=1 1=1 I III- (5EE PLANS FOR LOCATION) <br />GLEAN COMPACTED -� I, I I—III—III <br />FILL o q5% 11 <br />1=III- MONOLITHIC FOUNDATION <br />11 <br />STANDARD DENSITY I�-O W/ (2) #5 GONT. ON <br />MIN. GHAIR5 <br />WHERE 2ND 5TORY WALL <br />OCCURS, DIRECTLY ABOVE THE <br />8" GMU WALL 5HOWN, FT6.514ALL <br />BE 1'-4" WIDE W (2) #5 BARS <br />EXTERIOR WALL ® PORCH/PATIO/LANAI DETAIL <br />SCALE= NM <br />Y 2" GYP. BD. EA. 51PE <br />OF 2x4'S o 16" O.G. <br />y2" J-BOLT5 6" FROM EA. <br />END OF WALL AND <br />5PAGE A 32" O.G. <br />2" (6" MIN. EMBED) <br />ua 5TUD PLATE TIE5 PER <br />} PT BOT. PLAN O 5TUD TOP <br />PLT. BOT. <br />e e , ° <br />p e ! <br />° ° ° <br />as a <br />(2) #5 5 GONT. W/ 8" all <br />3" MIN. CLEAR <br />UPLIFT GONNEGTOR5 5UGH A5 5TUD PLATE TIES, HURRIGANE GLIP5, AND <br />ANCHOR BOLTS ARE NOT REQUIRED ON WALL5 NOT SUBJEGT TO A <br />CALCULATED NET UPLIFT FORGE. WALL WHIGH REQUIRE 5UGH HARDWARE <br />WILL BE 5PEGIFIGALLY NOTED ON PLAN. <br />'': GARAGE STEP DOWN DETAIL <br />SCALE: MS <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FTC. TO — <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" GROUT CELL 50LID <br />z_ <br />d) (3 RARE <br />' III=III=III=III= <br />R4.1 FI-FOIL OR EQUAL <br />OVER 3/4" FURR 5TRIP5 <br />-PER BUILDER <br />HOUSE 5LAB <br />(5EE PLAN) <br />z I —Ik <br />PVG GHA5E SLEEVE TO BE <br />TWIGE THE DIAMETER of <br />III I —I I I —I' I = I I 1 I �I I IoTEGTED PIPE <br />GLEAN GOMPAGTED 111—III I- <br />--1 <br />FILL A q5% MONOLITHIC FOUNDATION <br />STANDARD DENSITY I -O W/ (2) #5 GONT. ON GHAIR5 <br />MIN. <br />WHERE 2ND STORY WALL <br />OGGUR5 DIRECTLY ABOVE THE <br />8" CMU WALL 5HOWN, FT6. 5HALL <br />BE 1'-4" WIDE w/ (2) #5 BAR5 <br />CHASE DETA I L <br />8 SCALE= NTs <br />se*0V 10 <br />7 v <br />V <br />No 7ft <br />�� R•, .,F <br />s <br />r•. <br />+s � <br />© copyrigfit • , LHERN & KULP <br />St,ct,rat Engineering, Inc. <br />CD <br />z <br />JLU <br />w <br />w <br />Z <br />o <br />C7 <br />M <br />Z <br />w <br />N <br />< <br />Q <br />Z= <br />L) <br />4 <br />C <br />WQ5 <br />E <br />Z <br />Q� <br />2 <br />W <br />y <br />Y <br />m <br />W <br />CO N <br />OC <br />r) M <br />IV <br />M&K project number: <br />068-2001 1 <br />project mgr: <br />JSB <br />drawn by: <br />MJT <br />issue date: 10-09-20 <br />REVISIONS: <br />date: initial: <br />sheet: <br />q <br />CIO <br />C <br />d <br />Q <br />a <br />0 <br />J <br />LL <br />J <br />(n <br />W <br />z <br />Q <br />0 <br />a <br />� <br />N <br />U1 <br />� <br />0 <br />a <br />U <br />z <br />m� <br />d <br />�Y <br />z <br />J <br />_t <br />SCALE: WM <br />SDm 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.