Laserfiche WebLink
PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE :.. •; •;�..r,tK3:-�; <br />FINISH <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C 1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />LEFT ELEVATION <br />SCALE: 1/4"=1'-0" <br />Jul 9 1 <br />RIGHT ELEVATION <br />SCALE: 1/4"=1'-0" <br />LU <br />LUZO= <br />o >. H <br />wo ¢o <br />CC <br />U)0�W <br />Q = W QJ~ <br />JU)WW <br />� c <br />W <br />zzzP: <br />U)� Z <br />w a- <br />�UpOU <br />p=zLLU) <br />n <br />Q <br />O g <br />H <br />O <br />O <br />O <br />U <br />U) <br />O <br />Z <br />i0 <br />O <br />O <br />o <br />� <br />w� <br />o <br />I <br />w <br />w <br />w <br />w <br />� <br />A <br />U) <br />w <br />O <br />z <br />z <br />0 <br />rL <br />U) <br />W <br />cl <br />cn <br />Z <br />OQ <br />�o <br />mZ <br />aaaaa <br />COMMUNITY; <br />PLAN # 6103 <br />RELEASED: 5/15/20 <br />SHEET' <br />A292 <br />