My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6945 Shelby Lynn Way
Zephyrhills
>
Building Department
>
Building Plans
>
6945 Shelby Lynn Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:52:07 PM
Creation date
2/19/2025 9:47:28 AM
Metadata
Fields
Template:
Building Plans
Street #
6945
Location
Shelby Lynn Way
Contractor
K Hovnanian Co LLC
Building Plans - Permit #
445
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />16"x8" THIGKENI <br />ED&E W/ (2) #5 <br />GONT. <br />THICKENED EDGE @ GARA 6E DOOR DETA I L <br />ga IX, M <br />8" GMU BLOCK <br />6" WIDE GONT. <br />GONG. CURB <br />(1) #5 VERT. FROM FT6. <br />TO BOND BEAM. LAP W <br />FOUNDATION DOWEL 11J—�, 6ARA6E SLAB <br />MIN. 30" &ROUT CELL I < (SEE FLAW <br />x <br />� � d I I III=III <br />(Z O GRADE e '. <br />'=1 11=1 11= d 1=1 I I I I I I I I I I I <br />'—III=1 1—III—III=111 <br />o z '_I11= 1=1 1 III—_III=11I- <br />-' <br />I - . III—11 f ' 1) #5 DOWEL W/ b" HOOK AT <br />=III=1 ALL VERT. WALL REINF. <br />III I i 1=1 111 11 1 I (5EE PLANS FOR LOGATI OW <br />GLEAN COMPACTED—' <br />FILL la 15%,1'-0" MONOLITHIC FOUNDATION <br />STANDARD DENSITY MIN W/ (2) #5 CONT. ON CHAIRS <br />WHERE 2ND STORY WALL <br />OCCURS DIRECTLY ABOVE THE <br />8" CHU WALL 5HOWN, FT6. SHALL <br />BE 1'-4' WIDE W (2) #5 BARS <br />GA %6r: CURB DETA� I L <br />5 <br />S GMU BLOCK <br />BEYOND <br />R4.1 FI-FOIL OR EQUAL <br />EXTERIOR DOOR <br />OVER V4" FURR 5TRIP5 <br />-PER BUILDER <br />MTL. THRESHOLD <br />HOUSE SLAB <br />SET IN SEALANT <br />(5EE PLAN) <br />PORGH/PATIO/LANAI <br />5LA13 OR PAVERS <br />(5EE PLANS) <br />e <br />PER MANur-.. -1 11=1 <br />I 11=1 11= <br />i' <br />_ _ __ _ •' <br />III —III <br />—III— I I=1 <br />'—III—I � III —I I <br />I —III —III <br />—I I I- <br />' —I <br />A. III—IIMII <br />I�l <br />I I I <br />—I 11=III-1 <br />1=1 11-1 I�— <br />MONOLITHIC <br />III-1 I I <br />--III-- <br />FOUNDATION W/ (2) #5 <br />GLEAN COMPACTED 11 GONT. ON CHAIRS <br />FILL o 515% STANDARD I -O <br />DENSITY AND TERMITE MIN. <br />TREATED <br />WHERE 2ND STORY WALL <br />OCCURS DIRECTLY ABOVE THE <br />8" CH) WALL SHOWN, FT6. 5HALL <br />BE 1'-4" WIDE W (2) #5 BARS <br />EXTERIOR OUTSWING 4 E61P POURED SILLS DETAIL <br />8" GMU <br />(1) #5 VERT. FROM FT&. TO <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" &ROUT CELL SOLID <br />R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />HOUSE SLAB <br />(SEE PLAN) <br />Z d .. d. <br />b e ° ° III —III —III —III —I <br />co 13-2 &BADE _ I I—III—III=III—III. <br />m ' I I II —III —III —I 1-1 <br />=1 I II I I I —III :. 1—I I I —I I I —I 11= <br />—III `.' I I MI I —III <br />'-11 !n l l l III =III= <br />' I=III .. I I R 1) #5 DOWEL W/ 6" HOOK AT <br />I— e _—III=_I I ALL VERT. WALL REINF. <br />' 11 11 111=III=III _� 11 (5EE PLANS FOR LOCATION) <br />GLEAN COMPACTED 1 111 I I —III I 11- ' <br />—111,-11 <br />FILL ® 15% 1 11 MONOLITHIC FOUNDATION <br />STANDARD DENSITY 1-0 W/ (2) #5 GONT. ON CHAIRS <br />MIN. <br />WHERE 2ND STORY WALL <br />OCCURS DIRECTLY ABOVE THE <br />8' CM WALL 5HOWN, FT6. SHALL <br />BE 1'-4" WIDE W (2) #5 BARS <br />�nnTliv�� c,�.Tln�l W/ Rl <br />WAU, NTS <br />8" GMU BLOCK <br />R4.1 FI-FOIL OR EQUAL <br />BEYOND <br />OVER %" FURR STRIPS <br />EXTERIOR DOOR <br />-PER BUILDER <br />MTL. THRESHOLD <br />HOUSE SLAB <br />SET IN SEALANT <br />(SEE PLAN) <br />PAVERS <br />(5EE PLANS) 1 <br />° <br />d <br />e" <br />d <br />I <br />d <br />II—I I ElII—I I <br />I 1=1 11-1 I I —_I I r <br />III —II <br />II <br />—III —III —_III <br />e <br />I <br />III-1 <br />—I I I=1 I I- <br />MONOLITHIC <br />I I III III-III-1 1 1 III-I`I� <br />I <br />GLEAN COMPACTED III =III= I I' FOUNDATION W/ (2) #5 <br />FILL o 95%, STANDARD 1'-011 GONT. ON CHAIRS <br />DENSITY AND TERMITE MIN. <br />TREATED <br />WHERE 2ND STORY WALL <br />OGGURS DIRECTLY ABOVE THE <br />8" GMU WALL SHOWN, FT6. SHALL <br />BE 1'-4" WIDE w/ (2) #5 BARS <br />ENTRY DOOR DETA� 1 L <br />6 .x � <br />8"x6" THICKENED — <br />SLAB W/ (1) #5 GONT. <br />ATIO/PORCH/LANAI SLAB <br />(SEE PLAN) <br />I-1 11 <br />EDGE DETA�IL <br />)HICKENEP <br />WAI : Ili <br />6" GMU BLOCK <br />(1) #5 VERT. FROM FT&. T <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" 6ROUT CELL SOLID <br />PORGH/PATIO/LANAI <br />5LA13 OR PAVERS <br />(5EE PLAW <br />Z I <br />�i EXP JOINT v <br />m <br />R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />HOUSE SLAB <br />(5EE PLAW <br />° b I —III —III. <br />a I_III—_III- <br />.d —III—III—III. <br />" 11=ITIS}(I) #5 DOWEL W/ 6" HOOK AT <br />III=III- ALL VERT. WALL REINF. <br />' I III=1 11=1 11=1 I III- (5EE PLANS FOR LOGATIOW <br />-� I III —III —III , I1 <br />GLEAN COMPACTED ' ' I —I I I-1 11— ' <br />FILL o 15%, MONOLITHIC FOUNDATION <br />STANDARD DENSITY I -011 V1/ (2) #5 CONT. ON <br />MIN. CHAIRS <br />WHERE 2ND STORY WALL <br />OCCURS DIRECTLY ABOVE THE <br />8" GMU WALL SHOWN, FT6. SHALL <br />BE 1'-4" WIDE W (2) #5 BARS <br />EXTERIOR WALL ® PORCH/PATIO/LANAI DETAIL <br />WAU: WIS <br />Y2" 6YP. BD. EA. SIDE <br />OF 2x4'S o 16" O.G. <br />Y2" J-BOLTS 6" FROM EA. <br />END OF WALL AND <br />SPACE o 32" O.G. <br />is) 2" (6" MIN. EMBED) <br />w STUD PLATE TIES PER <br />} PT BOT. PLAN o STUD TOP 4 <br />PLT. BOT. <br />_ e e 16°. d <br />d ° .4 .e' <br />°d <br />(2) #5'5 CONT. W/—/ 11 11 <br />3" MIN. CLEAR 8 8 <br />UPLIFT GONNEGTOR5 SUCH A5 STUD PLATE TIE5, HURRICANE CLIPS, AND <br />ANCHOR BOLTS ARE NOT REQUIRED ON WALLS NOT 5UBJECT TO A <br />CALCULATED NET UPLIFT FORGE. WALL WHIGH REQUIRE SUCH HARDWARE <br />WILL BE SPECIFICALLY NOTED ON PLAN. <br />ISARAGE STEP DOWN DETAIL <br />WAUli III <br />8" GMU <br />(1) #5 VERT. FROM FT6. TO — <br />BOND BEAM. LAP w/ <br />FOUNDATION DOWEL MIN. <br />30" GROUT CELL SOLID <br />z_<c <br />L <br />dJ O RAPE <br />I I I —_I I I=I I I_ —I <br />- <br />e <br />° <br />-;.e ' <br />I I��I <br />z_ <br />' I —I I I-1 I I— _ <br />' '' i lI III —III —III —III I —I II �� <br />GLEAN COMPACTED <br />FILL ® 15% <br />STANDARD DENSITY <br />MIN. <br />WHERE 2ND STORY WALL <br />OCCURS DIRECTLY ABOVE THE <br />8" GMU WALL SHOWN, FT6. SHALL <br />BE 1'-4' WIDE w/ (2) #5 BARS <br />)�H���r:DETA� I L <br />R4.1 FI-FOIL OR EQUAL <br />OVER 3/4" FURR STRIPS <br />-PER BUILDER <br />HOUSE SLAB <br />(5EE PLAN) <br />PVC CHASE SLEEVE To BE <br />TWICE THE DIAMETER OF <br />PROTECTED PIPE <br />MONOLITHIC FOUNDATION <br />VJ/ (2) #5 GONT. ON CHAIRS <br />seal: <br />• <br />Np 7782ir <br />i <br />•� <br />- <br />*• <br />J/ ; <br />1 r <br />r-0 <br />��.• g TE <br />' <br />:L'uZ <br />OF .�1 <br />P <br />0''. F '•• ....••• <br />% <br />© copyright : MULtiNF�V� <br />Structural Engineering, Inc. <br />oz <br />z <br />IJ LU <br />W <br />W <br />ZCD <br />\/ <br />Z <br />i Z <br />w <br />Q <br />a <br />Q <br />Z <br />QV <br />IH <br />U <br />. ax <br />CM-J� <br />pC <br />W C� <br />c <br />32 <br />= j <br />� <br />m E <br />Q <br />J- <br />Z <br />a <br />o� <br />A <br />W <br />p <br />to <br />o.0- <br />(AM <br />W <br />tin <br />g N <br />CL <br />W project number: <br />068-200 1 1 <br />project rn <br />NJ M <br />drawn by: <br />KG K <br />issue date: 05-2 6-20 <br />REUISIONS: <br />date: initial: <br />J <br />H <br />W <br />Z <br />O <br />H <br />d <br />0 <br />Z <br />O <br />UL <br />IM <br />c�•a <br />rC <br />0 <br />d <br />0 <br />O <br />J <br />LL <br />(D <br />Q <br />Z <br />0 <br />x <br />n. <br />d <br />� <br />d <br />it i <br />U <br />J <br />Ln cn <br />0..� <br />Z <br />J J <br />W" 11111" <br />SDm I <br />
The URL can be used to link to this page
Your browser does not support the video tag.